Traditional Culture Encyclopedia - Travel guide - Tourist resources of Ankang Hydropower Station

Tourist resources of Ankang Hydropower Station

The National Tourism Administration, Shaanxi Provincial Tourism Bureau, and Ankang Municipal Tourism Bureau conducted an inspection and review of the "National Industrial Tourism Demonstration Site" created by the Ankang Hydropower Station. They believed that the Ankang Hydropower Station met the national industrial tourism conditions and passed the inspection. The group reviewed the “National Industrial Tourism Demonstration Site”.

This means that the Ankang Hydropower Station will be unveiled and open to tourists. And it has become another new brand and new business card of Ankang Tourism after the "Dragon Boat Festival" on the Han River in Ankang, China. It will definitely give new cultural connotation and highlights to Ankang tourism and even Shaanxi tourism, expand and extend the development of Ankang and Shaanxi tourism strategies, and add a beautiful scenery.

It is reported that after being accepted as a national industrial tourism demonstration site. The operator of the power station, Ankang Hydropower Plant, will continue to further invest in, integrate, and package the software and hardware environment of the power station hub, and improve, perfect, and enhance environmental protection, safety, and other aspects. At the same time, in the completed entertainment venue, you can experience the fun of dynamic cinema, shuffleboard, and simulated shooting. Visitors at the power station resort can not only increase their knowledge and open the door to wisdom, but also enjoy the infinite charm brought by industrial tourism. Enjoy a delicious meal with a rich farmhouse flavour.

Ankang Hydropower Station is a key construction project of the country's "Seventh Five-Year Plan". The maximum dam height is 128 meters and the dam length is 541.5 meters. It forms a reservoir with a storage capacity of 2.58 billion cubic meters. It is mainly used for power generation, as well as shipping and flood control. It is a large-scale water conservancy project with comprehensive benefits such as , breeding, and tourism. The first unit was put into operation on December 12, 1990, and all units were connected to the grid on December 25, 1992.