Xianlin reservoir supporting project?

There are many supporting projects of Xianlin Reservoir, and there are many things to be considered before construction. Only by adequate preparation can we do our best and achieve the goal. Zhongda Consulting will give you a detailed introduction on the supporting project of Xianlin Reservoir.

Dadaosha Pumping Station Project

Dadaosha Pumping Station is an important part of Xianlin Reservoir Hub Project, which undertakes the tasks of emergency water lifting and salt-resistant water intake. The Dadaosha Pumping Station Project is mainly composed of pumping stations, water pipelines and ancillary buildings. The design flow of the pumping station is 26m3/s, and the water delivery pipeline is 964m long, made of reinforced concrete pipes with a diameter of DN 35 mm.. The engineering grade is Grade III, and the main building of the pumping station is Grade III. The project started construction on December 28th, 28, and the main project has been completed.

the starting point of xianzhu highway is located in Xianlin town, which intersects with provincial highway 2, passes through Lishan village and Shijiayuan village, and ends at Zhujia village, Shoujiang town, Fuyang city, which is connected with national highway 32. The total length of the route is about 11.4 kilometers, and the actual construction mileage is about 1.1 kilometers, of which Yuhang section is about 5.6 kilometers (including 3.3 kilometers in the reservoir area) and Fuyang section is about 4.5 kilometers. Xianzhu Highway is a supporting project for the construction of Xianlin Reservoir, and it is also a convenient channel for communication between Yuhang District and Fuyang. The construction of this project will play an important role in exerting the radiation function of Hangzhou metropolitan area, improving the regional highway network, promoting the development of tourism in the two places, promoting the further integration of Yuhang District and Fuyang City into Greater Hangzhou, realizing the coordinated development of urban and rural areas, and accelerating regional economic development. The project officially started construction on June 28th, 21.

Interface project

The interface project between Xianlin Reservoir in Hangzhou and Qiantang River diversion tunnel is located in Daqinggu, Zhuantang Street, Xihu District, with a length of 3m. The project started on September 3, 28 and was completed on April 3, 29. The main construction content of this project is to complete the workload of 3m tunnel excavation, bolting and shotcreting support, concrete lining, tunnel grouting and blocking of masonry retaining wall at the interface section, and the estimated investment of the project is 1 million yuan.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd