Traditional Culture Encyclopedia - Travel guide - Compensation standard for provincial highway demolition
Compensation standard for provincial highway demolition
I. Land compensation
The compensation standard for agricultural land is 90,000 yuan/mu, collective construction land is 90,000 yuan/mu, and unused land is 72,000 yuan/mu.
Second, the ground compensation
(1) The compensation for the above-ground objects of agricultural land adopts the lump sum method, and the lump sum price is 50,000 yuan/mu. The compensation scope includes the above-ground and underground attachments (bridges, pipelines, culverts, etc.). ) and young crops, excluding graves, power communication lines, nursing homes, etc.
(2) The above-ground objects of the construction land outside the hospital are compensated by lump sum method, with a lump sum price of 50,000 yuan/mu, and the compensation scope includes the above-ground objects and underground appendages (trees, roads, pipelines, poles, street lamps, drainage ditches, etc.). ).
(3) compensation for moving graves. Each tomb 1.800 yuan, including all expenses such as relocation and materials. The standard of bone recovery can be raised appropriately according to the situation. Double coffins can raise the compensation standard according to the situation. In principle, the highest compensation standard does not exceed that of 900 yuan. According to their funeral habits and characteristics, ethnic minorities can negotiate and determine the compensation standard within the range of 100%.
Third, compensation for residential housing.
The identification standard and area shall be subject to the data confirmed by household survey. No compensation will be given for illegal buildings and additions after freezing.
(a) the certified part of the certified real estate residential house shall be compensated according to the area of the real estate license and the standard stipulated in Document No.383; If the measured area exceeds the certification area of less than 260m2, compensation will be given according to the standard stipulated in Document No.383, and the remaining part exceeding 260m2 will be given relocation subsidy according to different structural forms and the signing time of the agreement. For this part of the area signed before July 28th, 55% of the demolition assistance fee will be given according to the standard stipulated in Document No.383; For this part of the area signed before July 3 1, 30% of the relocation assistance fee will be given according to the standard stipulated in Document No.383, and the helpless relocation fee will be signed after July 3 1.
(2) For residential houses without real estate license, compensation shall be made according to the measured area and the standard stipulated in Document No.383, and the compensation area shall not exceed 260 square meters. According to the time when the agreement is signed, the relocation subsidy fee shall be given according to different structural forms. For this part of the area signed before July 28th, 55% of the demolition assistance fee will be given according to the standard stipulated in Document No.383; For this part of the area signed before July 3 1, 30% of the relocation assistance fee will be given according to the standard stipulated in Document No.383, and the helpless relocation fee will be signed after July 3 1.
Fourth, compensation for non-residential housing.
(1) Non-residential houses with legal procedures shall be compensated according to the data confirmed by household surveys and the standards stipulated in Document No.383.
(2) Non-residential houses without formalities shall be compensated according to 80% of the data confirmed by household surveys and the standards stipulated in Document No.383 after being examined and confirmed by the subdistrict office.
(three) included in the list of illegal land use without compensation.
Verb (abbreviation of verb) relocation method
(1) Types of compensation and resettlement for homestead. With valid legal documents and in line with the "one household, one house" legal homestead, compensation and resettlement; The legal homestead with one family and many houses is allowed to be resettled, and the rest of the homestead is only compensated and not resettled; Before 1982, the legal homestead that was not registered and issued for historical reasons and met the reference of "one household, one house" was given compensation and resettlement, and the rest of the homestead was only compensated and not resettled; Legal homesteads that have not been approved since 1982 and meet the conditions of "one household, one house" will be given compensation and resettlement, and those with more than one house will be given resettlement once, and the rest of the homesteads will only be compensated and not resettled; Those who are identified as illegal buildings will not be compensated and resettled.
(2) Selection and appraisal of homestead. The unified resettlement method is homestead resettlement, which is planned and arranged in the village in principle, with 200 square meters per household. The site selection of resettlement homestead is given priority in the order of house demolition.
(three) the original homestead use area is greater than the resettlement homestead use area, according to the residential land price, property owner cost accounting.
(4) collective office buildings, public service facilities and other non-residential buildings and their appendages, which involve non-government investment, shall be compensated according to the standard of Document No.383 and shall not be resettled.
The moving cost and transition cost of intransitive verbs.
(1) The moving expenses shall be calculated according to the legal construction area of the house to be expropriated, and according to the load-bearing area if there is real estate license, and the maximum without real estate license shall not exceed 260 square meters. 30 yuan per square meter of residential housing, the total amount is less than 2000 yuan, calculated at 2000 yuan. Pay the moving fee twice in one lump sum.
(two) during the transition period, the monthly temporary transition fee is calculated according to the legal construction area of the expropriated residential house per square meter per household in 30 yuan. If the monthly total amount is less than 1.500 yuan, it shall be calculated as per household 1.500 yuan.
The transition period of demolition is 36 months, and the transition fee is calculated on a monthly basis from the date of signing the compensation agreement for demolition and resettlement, and paid after the original house demolition is accepted.
Involving public facilities or public housing, enterprise housing and other houses, compensation will be made according to the compensation standard of Document No.383, and there is no transitional resettlement fee.
Seven, the demolition incentive fee
(a) incentive fees for residential demolition.
1. Signing reward: 300 yuan/m2 will be awarded before July 28th; 200 yuan/m2 for signing the agreement before July 29th; If the agreement is signed before July 3 1, the reward will be 100 yuan/square meter. Award area certified housing (real estate license) is calculated and issued according to the area contained in the certificate; Unlicensed houses are issued according to the measured area, with a maximum of 260m2. If the agreement is not signed within the time limit, no reward will be given.
2. Vacancy reward: 30,000 yuan will be awarded to each household for the courtyard that has been demolished before August 25th; The courtyard demolished before August 28 will be given a vacant reward of 20,000 yuan for each building; Every courtyard that has been demolished before August 3 1 will be given a vacant reward of 1 ten thousand yuan; Fails to complete the demolition, no reward.
(2) Non-residential relocation and incentive fee.
1. Relocation and relocation reward: after the relocation and relocation is completed before August 3 1, 20% of the total compensation for buildings (structures) will be given relocation and relocation compensation reward; If it is not cleared within the time limit, it will not be rewarded.
2. Award for signing an agreement: 200 yuan/m2 will be awarded by signing a compensation agreement before July 28th; Sign the compensation agreement before July 29th, and reward 100 yuan/m2; If the compensation agreement is signed before July 3 1, 50 yuan will be awarded/m2; If the agreement is not signed within the time limit, no reward will be given.
Eight. Submit information
When signing the demolition compensation and resettlement agreement, the resettled person shall truthfully submit the following valid certification materials, and be responsible for the authenticity and legality of the submitted materials:
1. Original collective construction land use certificate (recovered original) and original real estate license (recovered original) and other documents.
2. Original and photocopy of the household registration book (copy of the first page [stamped with the official seal of the Provincial Public Security Department], copy of the index table of the permanent population registration card, and copy of the permanent population card);
3. Original and photocopy of marriage certificate (divorce certificate);
4. Original and photocopy of ID card.
Nine. any other business
(a) the demolition of houses involves disputes over property rights and debts, which shall be settled by the parties themselves through consultation within the relocation period; If it is not resolved within the relocation period, the local villagers' committee will put forward opinions, and the compensation fee will be temporarily managed by the office and the village.
(two) cold storage, central air conditioning by the assessment unit to assess the transfer costs. For rooftop photovoltaic power generation projects that have been completed and put into operation before the announcement of freezing, the evaluation unit should adopt a new replacement method to evaluate compensation.
(3) If there are septic tanks in the villagers' courtyard, it is difficult to excavate and determine the measurement area. When the house demolition equipment comes into the site for demolition, the office will organize relevant villagers, surveyors and property owners to conduct on-site measurement and confirmation, and make compensation according to the policy.
(four) all kinds of illegal construction, planting and planting without compensation.
- Previous article:A detailed introduction to Ningxia region
- Next article:Tourist attractions in Jiangmen What are the tourist attractions in Jiangmen?
- Related articles
- The latest news of the opening of the Three Gorges Waterfall Tourist Bus (Three Gorges Waterfall Bus)
- Chiang Mai Travel Guide Free Travel Guide
- Honeymoon to Hainan, please give some suggestions and recommendations for play and accommodation, thank you very much!
- 4~5 days self-help tour in Italy (self-driving)
- Self-driving tour of tourist attractions around Shenyang
- Wan Fenglin travel guide
- Introduction to Hahajin Xi
- Top Ten Tourist Attractions in Juxian County of Rizhao
- Give a speech on the theme of "civilized tourism, start with me".
- What does cloud tourism mean?