Emergency plan of property management company in heavy rain and rainy day
In order to ensure the owner's normal life, work order and safety of life and property, and ensure the normal operation of all equipment, all buildings, facilities and equipment will not be damaged during the summer flood control period.
Scope of application:
limits of jurisdiction
Supervise the implementation:
Department of Safety and Environment
Emergency procedures for flood control:
A, flood control organization procedures
1. Set up a flood control team before the flood season, with the manager of the Safety and Environmental Protection Department as the team leader, the supervisor of the Safety and Environmental Protection Department as the deputy team leader, and all members of the Safety and Environmental Protection Department;
2. In case of danger, the director of the Safety and Environmental Protection Department must immediately arrive at the scene to carry out emergency rescue work, and notify the branch leaders to be responsible for allocating material resources and manpower, and the engineering maintenance team will take effective measures according to the site conditions. The Safety and Environmental Protection Department is responsible for deploying personnel to cooperate with emergency rescue. In case of danger at night and on weekends, the district supervisor will be in charge of the command temporarily, and inform other flood control team members to rush to the scene in time.
Second, the engineering department in the flood season flood control measures
1. Set up a special storage room for flood control equipment, mainly including drainage pump, drainage hose, waterproof distribution box, woven bag, sand, shovel, etc.
2, before the arrival of the flood season, the head of the safety and environmental protection department, foreman, should carefully patrol.
(1) Whether the drainage ditch of the roof platform is unblocked, and cleaning up the garbage on the roof at the same time;
(2) Check whether the sewage pump in the underground sump is sensitive and effective, and set the control in the "automatic" position;
(3) Check whether there is sediment in rainwater wells, sewage wells and rainwater pipes inside and outside large residential areas, and clean them up to ensure smooth drainage;
(4) The maintenance team should check whether there is rain leakage in important computer rooms such as power distribution room and control room, and handle it in time if there is any.
(5) The person in charge of the Safety and Environmental Protection Department and the foreman mainly check the rainwater outlet, drainage pipe, underground garage, sewage pump, elevator pit and the problems recorded in the past.
(6) At the same time, strengthen the inspection and patrol of electrical equipment and facilities, including lightning protection network (needle) and cable trench, and solve problems in time when found.
Third, the dangerous situation handling procedures
1. If rainwater is poured into the underground garage, the head of the Safety and Environmental Protection Department and the foreman shall promptly notify the engineering personnel to start the sewage pump for drainage, and notify the owner to organize the vehicles to evacuate the garage and park in a safe place. At night and weekends, the manager of the Safety and Environmental Protection Department, on the one hand, organizes personnel to carry out emergency rescue, on the other hand, immediately informs other members of the flood control team of the Safety and Environmental Protection Department;
2. All the staff of the safety and environmental protection department of the residential area are under the command of the manager of the safety and environmental protection department, some personnel maintain order, and some personnel eliminate dangerous situations and rescue equipment;
3. The cleaning staff in residential areas should clean up the accumulated water everywhere;
4. After the dangerous situation occurs, the company office should conduct a comprehensive inspection, make statistics on the losses and material consumption caused by this flood, and replenish flood control materials in time to prepare for the next flood control;
5. The community leaders are responsible for recording the incident handling process in detail and reporting to the company leaders.
Emergency plan of property management company in stormy and rainy days 2 This emergency plan is formulated according to the notice and requirements issued by the property group company in order to do well the flood season prevention work of the company and all projects and ensure the property and personal safety of the company and the owners.
I. Organizational structure and responsibilities
(a), the establishment of a leading group for flood control
Group length:
Deputy team leader:
Members:
Responsibilities: responsible for the inspection and maintenance of drainage facilities and equipment of property management company and various projects to ensure that the drainage system is in good condition and effective; Strengthen patrol inspection of various projects, find leakage points in time, avoid short circuit and equipment damage caused by rain leakage, especially in high-rise rooms of various projects, and ensure normal power supply; Responsible for the maintenance of lightning protection facilities and equipment of various projects, and responsible for storing necessary flood control and disaster relief materials; In case of flood disaster, organize maintenance and rescue work in accordance with this flood control and disaster relief plan.
(two), set up four working groups under the command of the leading group for flood control.
1, establish a flood control and emergency rescue team.
Team leader: Members:
Responsibilities: Carry out flood control and emergency rescue work under the command of the leading group for flood control, and each project manager shall organize emergency rescue to conduct a comprehensive inspection of each management area, determine the cause of the accident in the stagnant water area, formulate local emergency measures and organize handling.
2. Set up an equipment support team.
Team leader: Members:
Responsibilities: Under the command of the leading group for flood control, implement flood control and emergency rescue (water pump drainage). According to the actual situation of the project, each project reasonably organizes the use of drainage pumps and other equipment to drain the areas with serious water accumulation, so as to ensure the normal management of each management area.
3. Leader of logistics support team: members:
Responsibilities: Under the command of the leading group for flood control, carry out emergency communication, statistics and logistics support. In the event of a flood, do a good job of information transmission and logistics support within the company, and after the flood, make a statistical summary of the losses caused by the flood.
4. Leader of emergency rescue team: Members:
Responsibilities: Carry out flood control and disaster relief work under the command of the leading group for flood control. When the project is in serious danger, rescue will be dispatched in time.
Second, the flood control materials:
Rain boots, raincoats, shovels, woven bags, flashlights, iron wires, drainage pumps, wire reels, etc. , and designate a person to be responsible for ensuring that flood control materials can be collected 24 hours a day.
Third, the project manager is responsible for flood control in various regions; Strengthen flood prevention awareness training, check the key parts in place, report the danger to the department or company leaders in time, and take active measures to avoid the danger from expanding.
Four, all flood control communication tools must be kept open for 24 hours during the flood control period.
5. In case of heavy rain above moderate rain, the project manager must be on duty; In case of rainstorm, a full-time duty system shall be implemented.
Six, when the office on duty receives the notice of flood control, it shall promptly notify the leaders on duty and all flood control personnel.
Seven, each project on duty after receiving the owner for help information, should promptly notify the leaders on duty and the main members of the project flood control quickly to the scene to check the situation, timely disposal; When there is a large area of water in the management area, personnel should be quickly organized to rush to the scene, and relevant equipment such as pumps should be mobilized to dredge and drain, and at the same time, the company leaders should be reported.
Eight, the usual office back office and customer service of each project should pay close attention to the weather changes, timely notify the relevant weather anomalies, and at the same time do a good job of signing the bill on duty during the flood control period, and record the major floods.
Nine, flood control materials should strengthen management, after the flood season to warehousing, for future use.
Emergency plan of property management company in stormy days 3 I. Purpose:
In order to establish and improve the early warning and emergency response system for public emergencies in property management, and to ensure that the property company can effectively and orderly do a good job in flood control and disaster relief in the event of major floods, this plan is formulated in accordance with the requirements of the higher authorities and company leaders, combined with the actual situation of our company, in order to implement the emergency rescue and disaster relief work and ensure the safe flood season this year.
Second, the guiding ideology
Conscientiously implement the spirit of the national, city and county flood control work conference, adhere to Scientific Outlook on Development's and people-oriented ideas, actively defend against flood disasters, implement the working policy of "safety first, prevention first, standing by and doing all-out rescue", and build a harmonious society; Unified leadership, careful deployment, coordinated action, hierarchical management, clear division of labor, scientific scheduling, further strengthen flood control responsibility, earnestly grasp all aspects of flood control work, improve and implement various flood control plans, strengthen flood monitoring and early warning and forecasting, improve the comprehensive ability of flood control and waterlogging prevention, and minimize the losses caused by flood disasters to families and companies.
Three. primary mission
1, implement the responsibility system. Conscientiously implement the flood control responsibility system with the project manager responsibility system as the main content, improve the rules and regulations, clarify the job responsibilities, and implement the responsibilities to people.
2, organize the formulation and implementation of flood control emergency plan. Combined with the actual situation of various departments and projects, fully foresee possible problems, and scientifically and reasonably formulate emergency plans for flood control and flood fighting.
3, all departments and projects of flood control materials in place, do enough flood control materials, do a fixed position, the specialist is responsible for the management.
4, each project do someone on duty 24 hours a day, and there is a leadership shift, the project manager responsibility system. Ensure the smooth flow of information and properly handle emergencies.
Four, leadership and command and rescue and disaster relief agencies
1, set up a flood control working group.
Conductor: xxx
Deputy commanders: xx, xx, xxx
Members: xx, etc.
2. Establish the company's flood prevention and rescue commando.
Each project will set up its own rescue commando team, with each project manager (or order maintenance supervisor) as the captain.
Verb (abbreviation for verb) main responsibility
1, flood control work leading group responsibilities
(1) Quickly receive and convey instructions from flood control departments and superior leaders on flood control and disaster relief.
(2) deploy and direct the implementation of flood control and flood relief operations. In case of danger, all emergency commandos are under the command of the leading group for flood control.
(3) to master the basic situation of flood control and flood fighting work in each unit, understand the water situation and report it in time.
(4) Perform other tasks assigned by superiors.
2, flood control and emergency commandos responsibilities
(1) Receiving and reporting flood control and disaster relief.
(2) directly participate in flood control and disaster relief operations.
(3) Coordinate the resettlement and transportation of affected households.
(4) Complete other tasks assigned by the company's leading group for flood control.
Preparation of intransitive verbs (refer to the actual situation of each project)
1. Check and clean the drainage pipes on the ground and roof in advance, clean septic tanks and sewage wells, and check the interface between the drainage supervisor and the municipal pipe network to ensure smooth flow.
2. Check the sewage pump to ensure that the sewage pump in important positions (generator room, pump room and power distribution room) can run automatically.
3. Repair the standby generator and control circuit to ensure the safety and reliability of emergency power supply.
4. Check the flashlight in good condition, and check the emergency lighting in the computer room.
5. Check the lightning protection system of the community.
6. Check the facade of the external wall, notify the residents, arrange the balcony and roof garden, and clean up the high-altitude bent frame and canopy.
7. Prune the dead branches of big trees and branches with serious pests in the community.
8. Determine the evacuation route and location of vehicles and personnel in case of emergency.
9. The project has a special person to watch the local weather forecast regularly every day, and report important information to the project leader in time.
Seven. Key locations, equipment and facilities of the project (refer to the actual situation of each project)
1. Focus on monitoring the equipment and facilities (basement, elevator shaft) below the horizontal elevation of the computer room and residential area.
2. Public electrical equipment such as office computers, monitoring hosts and road braking equipment.
Eight, material preparation (each project with reference to the actual situation)
1. Prepare spare water pump, bucket, broom and towel.
2. Prepare necessary rain gear, such as umbrella, rain boots and raincoat.
3. Emergency lighting such as flashlights and emergency lights.
4. Emergency communication such as walkie-talkie.
5, medical care: tourniquet, anti-inflammatory drugs, iodine, band-aid.
6. Safety belts, safety ropes, shovels and other emergency tools and materials.
7. Prepare the necessary funds.
8. Emergency support vehicles.
Nine, emergency measures after the flood
1, general flood emergency
(1) Strengthen communication with county flood control departments and strengthen flood monitoring and forecasting.
(2) According to the actual situation of each unit of our company, put forward flood control requirements for all departments and projects, and evacuate residents in an organized manner.
(3) Take measures to ensure smooth communication of flood control system.
(4) Supervise the preparations for emergency rescue and disaster relief, and check the implementation.
(5) According to the flood trend of flood control departments, strengthen flood prevention publicity and education for residents, quell rumors, stabilize people's hearts, and maintain normal production and living order.
2, major flood emergency
(1) After receiving the emergency notice of major flood from the superior leaders, the flood control and disaster relief commandos of various projects involved in the flood quickly concentrated, so how can they quickly put themselves into the flood control and emergency rescue work?
(2) Organize forces to do a good job in the evacuation and resettlement of residents and take favorable measures to ensure the basic living conditions of residents as much as possible.
(3) Organize relevant personnel to maintain public order and prevent people from making trouble.
(4) Understand the disaster situation, do a good job in propaganda, quell rumors and misinformation, and maintain social stability.
Specific' emergency measures shall be implemented in accordance with emergency work plan for flood control project with reference to above-mentioned process and in combination with actual situation project.
X. Summary and reporting of information
According to their respective responsibilities, the Project Flood Control Headquarters is responsible for collecting, sorting out and studying the analysis and summary of possible flood control information in this area, and reporting the situation to the company's competent leaders in a timely manner according to the principles of early discovery, early reporting and early disposal. Any individual has the right and obligation to report all kinds of flood control emergencies and possible hidden dangers to the company office, and has the right to report the negligence and improper handling of relevant departments. The submission and processing of flood control information shall follow the following principles:
1. Important information should be reported immediately. For information that is difficult to accurately grasp due to objective reasons, we should report the basic situation in time, and at the same time quickly understand the situation and add details.
2, general information according to the project management authority, submitted to the flood control responsible person of each project.
3. The company's flood control working group shall report immediately after receiving reports on major floods, work, insurance and disasters.
XI。 others
When encountering major, urgent and unexpected events or situations involving residents' normal work, operation and life order, cooperate with the customer service centers of various projects to verbally inform nearby customers and do a good job of appeasing and explaining customers.
Emergency Plan of Property Management Company in Rainstorm 4 According to the Flood Control Law of People's Republic of China (PRC) and the specific requirements of the higher authorities such as enterprises, districts and streets of a group holding company, combined with the actual situation of our enterprise, in order to ensure that all measures are put in place and all work is carried out smoothly, the Emergency Plan for Flood Control and Emergency Rescue of Enterprises is specially formulated. Details are as follows:
I. Guiding ideology
Based on the principle of "unity and cooperation, local interests subordinate to the overall interests", we should carefully analyze the actual situation with a scientific attitude, take flood control as the main response to sudden disaster weather, earnestly do all the preparations for flood control and drainage, take effective measures to avoid rain leakage, backward flow and flood in rainy season, avoid and reduce economic losses, ensure the normal operation of production and operation in flood season, and formulate feasible flood control plans to ensure the safety of life and property of enterprises and employees.
Second, the flood control work command system
Flood control work strictly implements the hierarchical responsibility system under the leadership of the chief executive, and compacts the responsibilities at different levels. During the flood control period, the top leaders of each workshop department personally took the lead, and at the same time, in order to carry out the flood control work in an orderly manner, the enterprise set up the flood control work headquarters. Members are as follows:
General Manager: Secretary of the Party Committee and Deputy Director of the General Manager: Deputy Secretary of the Party Committee and Chairman of the Trade Union of the Group Enterprise.
Members: leaders in charge of enterprises and heads of departments.
Contact: xxx
Duty phone:
Company office:
General department:
Night shift:
Duty room:
Third, set up an emergency rescue team.
In flood season, in order to prevent disasters and accidents from affecting production and operation, according to the requirements of a group (holding) limited enterprise and the district and street flood control headquarters, we set up an emergency rescue team mainly composed of security team and fire brigade. The emergency rescue team obeys the leadership of the enterprise flood control headquarters and enters the flood control battle at any time to deal with flood emergencies.
Fourth, build a flood fighting and emergency rescue team.
1. In order to prepare for flood control and drainage, we set up a 200-person rescue team with militia and young and middle-aged workers as the main body according to the requirements of the higher flood control headquarters. In case of severe flood, obey the unified mobilization of the district flood control headquarters and make good preparations for flood fighting and emergency rescue of dikes.
2. During the flood control period, in order to do a good job of emergency rescue and drainage within the enterprise, an emergency rescue team of 100 people was formed by the employees of the enterprise, and all emergency rescue work was mobilized by the enterprise flood control headquarters.
5. Prepare for flood control, rain leakage and backflow prevention.
In order to survive the flood season safely and ensure that the property of the enterprise is not damaged, all workshops and departments should strengthen flood control, and ensure that there are not less than two employees on the job when forecasting rainstorm and rainstorm. At the same time, in order to ensure the safety of workshops, warehouses and key parts that need to be harmed in flood season, especially to prevent all kinds of bacteria from infecting food through underground drainage, workshops and departments should do a good job in rain and leakage prevention and inspection of underground drainage pipes in the factory before flood season, and do a good job in backflow prevention inspection of all warehouse parts. When problems are found, the competent department should solve them in time. Anti-reflux measures should be taken in low-lying areas to ensure safety in flood season, so that no light rain leaks and no heavy rain falls.
Six, do a good job in the preparation of flood control materials
In order to do a good job in this year's flood control and drainage work, and to be prepared, all relevant departments should do a good job in the management, repair and maintenance of flood control facilities, flood control tools, drainage pipes, flood control soil, flood control gates, waterproof glue plugs, communication lines, vehicles on duty and other materials, and maintain a good state of combat readiness. At present, our company has flood control tools: 50 shovels, 50 shoulder poles, 3 drainage pumps and 18 baskets.
Seven, strict flood control duty system
In order to ensure the safety in flood season, enterprise leaders and managers are arranged to be on duty in flood season. There should be a special person on duty for the key parts that need to be injured, and the workshop leaders and the heads of relevant departments should be on duty. Especially in case of moderate or heavy rain, the leaders of workshops and departments must be on duty in order to find and solve problems in time.
Eight, the responsibilities of various departments in flood control work
Flood control work should implement the principles of "who leads, who is responsible" and "who is on duty, who is responsible", establish the overall concept, and do all the preparations for flood control. To this end, formulate relevant job responsibilities:
Actively organize and arrange production in flood season, do a good job in preventing rainwater leakage and sewage backflow, keep abreast of weather changes in flood season, and assist in organizing drainage and emergency rescue in combination with production practice. In case of rain forecast or sudden rain at night, the leaders of all workshops and departments and key flood control departments must immediately take up their posts, check the rainwater leakage of their workshops and departments, and obey the arrangement of enterprises.
Emergency Plan for Rainstorm and Rainy Days of Property Management Company 5 In order to effectively defend against catastrophic floods, standardize flood control procedures, effectively protect people's lives and property, and minimize disaster losses, this plan is formulated in accordance with the provisions of the Flood Control Law of People's Republic of China (PRC) and the Flood Control Regulations of People's Republic of China (PRC), and in combination with the actual situation of flood control work of this project.
I. Flood control and emergency rescue organizations
1, the commander-in-chief at the scene of the accident shall be the project manager xx;
2. The assistant manager xx is responsible for the wounded rescue team, and the construction teams are composed of workers.
3. The construction team leader xx is responsible for the material rescue team, and each team of the construction team is composed of construction personnel.
4. The security guidance group consists of logistics personnel and construction personnel of each shift of the construction team.
5. The emergency material supply team consists of Zeng Dehe, director of materials, as the team leader, and the construction personnel of each construction team.
6, logistics supply group is composed of project department office staff;
7. The on-site temporary medical team consists of on-site medical personnel and team members of the construction team;
8. The daily office of the leading group for flood control and emergency rescue is the office of the project department.
Second, the project intends to emergency organization functions and responsibilities
1, the duties of the commander-in-chief at the scene of the accident:
A. command and coordinate all accident site operations;
B, on-site accident assessment;
C, ensure the field personnel and the public to implement emergency actions;
D, control emergencies;
E, on-site emergency action command;
F, do a good job in the transformed emergency rescue site command handover and emergency rescue assistance;
G, do a good job in fire control, medical care, traffic control, emergency rescue and disaster relief and other public departments.
2, the functions and responsibilities of the wounded rescue team:
A, guide the field staff to evacuate from the safe passage;
B, rescue the injured to safety.
3. Functions and responsibilities of the material rescue team:
A, rush to transport the transferable materials at the site;
B, transfer items that may cause new hazards to safety.
4. Functions and responsibilities of the Security and Steering Group:
A. Effectively isolate the inside and outside of the site and keep the on-site emergency rescue channel unblocked;
B, residents outside the evacuation area to evacuate the danger zone.
5. Functions and responsibilities of the emergency supplies team:
A, quickly allocate emergency supplies and equipment to the scene of the accident;
B, provide and check the emergency personnel's equipment and safety equipment;
C, timely provide follow-up emergency supplies.
6. Functions and responsibilities of Logistics Supply Group:
First, quickly organize the items that must be supplied by logistics;
Timely delivery of logistics materials to emergency personnel.
7. Functions and responsibilities of the temporary medical team on site:
A, simple rescue and dressing work for the injured;
B, timely transfer seriously injured personnel to medical institutions for medical treatment.
Third, on-duty scheduling
The project department shall set up a corresponding leading group office for emergency rescue of flood accidents, and arrange personnel to be on duty 24 hours during the flood season.
Immediately after the dangerous situation occurs, report to the emergency commander-in-chief and report to the leaders of the enterprise headquarters.
Fourth, emergency preparedness.
1. Under the leadership of the leading group for flood control and emergency rescue, the project department office is responsible for organizing all construction teams to formulate corresponding emergency plans and make good preparations.
2. The office is responsible for the collection, tracking and transmission of weather forecast information, and urges all departments to implement the personnel on duty during the flood season and make records.
3. All personnel of the leading group for flood control and emergency rescue of the Project Department shall hold a meeting immediately after receiving the relevant emergency warning notice issued by each team of the Construction Team of the Project Department according to their positions, organize disaster preparedness and urge to take various emergency measures. On-site inspection should be strengthened, and emergency equipment and materials should be provided.
4. The office organizes each team of the construction team to formulate emergency plan measures for flood accident treatment.
5. Each construction team shall take emergency measures according to the flood control area, keep the drainage system on the construction site unblocked, reinforce the temporary power lines, and ensure smooth communication.
6. Dangerous goods should be stored with obvious signs to prevent them from being disturbed, mixed and lost by floods, causing accidents, and corresponding emergency measures should be formulated when necessary.
7. The leading group for flood control and emergency rescue of the project department organizes the implementation and inspection of emergency plans, and the office urges all departments to make inspections and records.
Verb (abbreviation for verb) emergency response
1. The office of the project department is responsible for contacting flood control emergency matters and organizing each team of the construction team to implement the emergency plan.
2, the construction team should actively cooperate with the office work, and according to the emergency plan.
3. When a major accident occurs in flood control, the leading group for flood control and emergency rescue shall immediately report to the relevant government departments, request assistance and guidance, and report to the enterprise leaders in time. At the same time, according to the characteristics of disasters and accidents, all rescuers should be organized to implement effective emergency measures, and strive to minimize or eliminate losses and unfavorable factors in a short time.
4. When a general accident occurs, all departments should handle the incident according to emergency measures, evacuate personnel and materials in time, control and prevent the incident from expanding, and strive to minimize losses or unfavorable factors.
When it is confirmed that a flood control accident has occurred, the person in charge of the site shall order it to report to the duty room, and organize all site construction personnel to place and protect the construction machinery, and all site construction personnel shall evacuate under the leadership of the team leader. If it is too late for the trapped construction workers to evacuate, they should choose higher ground to avoid the flood, protect themselves and wait for rescue.
Sixth, organize emergency rescue.
1, the project department shall organize each team of the construction team to count the personnel in time, confirm whether there are trapped personnel, assemble and stand by, and shall not go out without permission;
2. The project department organizes emergency rescue commandos, which are composed of capable workers of each shift of the construction team, and are responsible for installing sand bags and adjusting the direction of water flow;
3, equipped with sufficient lighting, life-saving equipment, organized by the project department good physical quality, high water workers to carry out search and rescue activities;
4. In case of flood, if the equipment cannot be evacuated to a safe place, it should be powered off, reinforced and properly protected to prevent unnecessary damage to the equipment.
5, busboy get ready, and contact the designated hospital in advance according to the flood situation.
- Previous article:Autumn is coming, and the weather is getting cold.
- Next article:From Wuxi to Changzhou Dinosaur Park
- Related articles
- On how to do a good job in educational practice for normal students.
- Fujian Yu Huadong's tour guide words
- Talk about the frosted circle of friends.
- What anecdotes and allusions does Liu Guo, the author of Academy?
- What are the specific details of Huaihua Hongjiang Ancient Mall? A few days is usually enough. What about the surrounding accommodation, inn and other details? Can I live in the ancient shopping mall?
- Has there been any rainstorm in Wuhu in the last three days?
- What month is the hottest in Shandong?
- What idioms describe the weather?
- Road trip Route from Shiyan to Laojun Mountain in Shaanxi Province
- When will the typhoon come to Guangdong?