Traditional Culture Encyclopedia - Weather forecast - When will the north extension of Changsha Metro 1 Line be opened?

When will the north extension of Changsha Metro 1 Line be opened?

The north extension line of Changsha Metro 1 Line officially entered the stage of shield construction on February 22nd, 20021year. I believe many friends are very concerned about this operation. When will the north extension of 1 line be opened? Let's take a look at this problem with Bian Xiao!

1. When will the north extension line of Changsha Metro 1 be opened? The first phase of the North Extension Line runs from Cai Xia Road Station to Kaifu District Government Station, with a total length of 9.93km and five stations. It is expected to be completed by the end of April 2023. It will not carry passengers for trial operation from May to July 2023, and will be officially opened to traffic in September 2023, with a total construction period of 48 months. The second phase of the North Extension Line runs from Cai Xia Road Station to Dingzi Town, with a length of about 4.63km and two stations. It is still under planning.

2. The first phase station of the north extension line of 1 Line/the first phase project of the north extension line of KLOC-0/Line is located in Jinxia Group section, and the line starts from Jinpenqiu Station (formerly Cai Xia Road Station) and ends at Kaifu District Government Station (1 Line 1 originating station). The total length of the line is about 9.88km, with 5 stations, including 2 elevated stations and 3 underground stations.

3. 1 line introduces Changsha rail transit 1 line as the north-south backbone line of Changsha rail transit network, which not only improves Changsha rail transit network, but also shortens the distance from Changsha urban area to high-speed rail, airport, highway passenger transport and other transportation hubs, allowing subway, aviation, high-speed rail, highway passenger transport and maglev to form zero-distance docking, thus constructing Changsha highway, railway, aviation and rail transit. Rail Transit 1 and Line 2 form the "cross" of Changsha Metro, opening the "transfer era". Changsha citizens can quickly reach the north, south, east and west of the city, and Changsha really enters the "1 hour transfer life circle". The rail transit 1 line is connected in series with Wu Jialing, Wuyi Square, Huangxing Pedestrian Street, Dong Tang and other business districts to facilitate citizens' daily shopping and entertainment needs. At the same time, the subway 1 line passes through Hunan Provincial Government, Kaifu District Government, Tianxin District Government and other government departments for the convenience of citizens and friends.