Can you send me a weekly diary of the garden internship internship?

Sunday, June 16, the weather was sunny

After breakfast, I left the school amid farewells and blessings from teachers and classmates, and embarked on a journey to report to the company where I was applying. The rumble of the train could not hide my inner excitement. The scene at yesterday's grand graduation ceremony came to mind again. I was deeply moved by President Song's heartfelt speech. He said: "Your four years of college life are over. , has come to a successful conclusion. I sincerely congratulate you. Your four years of college life will become a beautiful memory in your life journey. Starting from tomorrow, you will go to work, which is a new starting point in your life journey. I wish you a safe journey. ”

The running train connects the end of my study life and the starting point of my work. I think life may be like a running train, which only keeps running. Only then can it have its strong vitality and its huge social value.

The weather was sunny on Monday, June 17th

The sun was shining brightly today, making the whole city look steamy and full of life. After I reported to the company in the morning, the company’s human resources department made an appointment for me to meet with the general manager in the afternoon.

At 2 o'clock in the afternoon, I arrived at the company's reception room on time. General Manager Chen and Director Wang of the Organization and Human Resources Department received me. General Manager Chen first expressed his welcome to me for applying to work in their company on behalf of the company. He briefly introduced the company's situation. General Manager Chen is very young. He introduced himself as a graduate with a bachelor's degree in industrial and civil construction. He is 35 years old and has been working in the company for 12 years, from assistant construction worker to construction worker to deputy general manager until he assumed the position of general manager last year. He finally asked for my opinion on work arrangements. I said that I wanted to work on the front line of grassroots construction. I was not afraid of hardship and wanted to get in touch with as much practical knowledge as possible. I also hoped to arrange for an old engineer to be my business mentor. General Manager Chen agreed very much with my request. He said that he originally wanted me to stay in the company and work in the company. Since I had this request, he agreed to arrange to work in the company's eighth project department. General Manager Chen also said: "In four years of college life, I should say that I have learned basic theoretical knowledge of the system, but I still lack practical knowledge. From the perspective of completeness of knowledge and talent training, it is good to work on the front line of construction first. , Only when theory and practice are well combined can we continue to grow our talents in practical work."

The weather was sunny on Wednesday, June 19th

After returning to the dormitory last night, I studied the drawings and kept looking at them. By about 11 o'clock, after going to bed, my mind was filled with drawings and fighting. This is a technical transformation and expansion project. The main content is to build a factory-owned thermal power station and alkali recovery project. There are 36 large and small unit projects. The main factory building integrates the boiler room, common power distribution room, and turbine room, and is connected with the coal gallery. , Chimney connection, complex structure and high difficulty, is the core part of the entire project. Among the construction projects, there are also bungalows with extremely simple structures, such as instrument repair workshops with brick masonry structures and dry coal sheds with steel structures. There are also multiple underground reinforced concrete pools and two 45m (high chimneys) one is reinforced concrete and the other is a brick chimney*. Engineer Zhao said that we must strive to win the bid for this project. I want to participate in the construction of this project after winning the bid. It will be an excellent opportunity for me to learn and exercise. After thinking about it, I became an intern construction worker wearing a safety helmet and work clothes, standing on a high scaffolding, conducting quality inspections. I looked into the distance happily, and suddenly a strong wind blew and the scaffolding shook a few times. After landing, I was thrown into the air. I screamed and woke up. It turned out to be a dream, and I felt cold sweat all over my back.

Friday, June 21, the weather was cloudy

In the morning, Engineer Zhao and I went to the paper mill site for a field inspection. Engineer Zhao said that before formulating the construction organization design (plan), one must go to the site for on-site inspection and must not take things for granted behind closed doors. Only after a detailed understanding of the specific conditions of the site can the prepared construction organization design (plan) be targeted and have good practical value. Before leaving, Engineer Zhao asked me to understand the following main contents:

1. On-site power supply conditions (lines, capacity, etc.);

2. On-site water supply and drainage conditions (lines, capacity, etc.) Capacity, etc.);

3. Smooth road conditions at the site;

4. Available buildings at the site;

5. There are existing underground pipelines at the site Situation;

6. Situation of urban measurement control points around the site, etc.

Engineer Zhao said that if it is an out-of-town construction site, you should also understand the local temperature, rainfall, wind power, wind direction and earthquake intensity, local resources, local transportation, local construction cooperating units and local construction administration during the construction period. Management documents related to the construction market from the competent authorities, etc.

In the afternoon, Engineer Zhao presided over a technical work meeting to discuss the key points of the paper mill bidding project construction organization design and preparation, and requested relevant personnel of the project department to provide opinions and suggestions. Everyone put forward their own opinions from various aspects such as progress, quality, safety, cost, etc., and I was very inspired by it. My last speech was to put forward three suggestions based on the design drawings and the on-site conditions I learned in the morning.

First, it is recommended that the construction progress network diagram of this project be prepared with the main factory building as the main line.

In order to facilitate the roof truss fabrication and roof hoisting work of the boiler room and turbine room, it is recommended that the floors in the two workshops be constructed after the roof hoisting is completed. This can greatly speed up the construction progress of the main factory building.

Second, there are not many original buildings available on site. If all temporary buildings are built, the cost will be higher. It is recommended that two simple-structured bungalows—the brick-concrete structure instrument maintenance workshop and the steel-structured dry coal shed be rushed to be built when construction starts (the steel columns and steel roof trusses of the dry coal shed are prefabricated in advance at the comprehensive factory) as the construction site Office space, tool space and building site mixing station space to save the cost of setting up temporary facilities.

Thirdly, this project has many unit projects. It is recommended to set up a centralized mixing and supply station for mortar and concrete in the dry coal shed. This will not only facilitate the quality control of mortar and concrete, but also facilitate civilized construction on site. It can also reduce waste and reduce costs.

In his final summary, Engineer Zhao affirmed the three suggestions I made and decided to adopt them. He also praised me for considering the problem carefully.

Saturday, June 22, the weather was cloudy

Without rest in the morning, Engineer Zhao took me to an under-construction construction site in the project department to inspect the work. This is a dormitory project. As soon as he arrived at the gate, Engineer Zhao praised the safety warning sign hanging at the gate: Please wear a safety helmet when entering the construction site. Among them, the word "wear well" is written in red paint, which is particularly eye-catching. Next to it is a picture of a head wearing a helmet, with both hands tying the straps of the helmet. Captain Wang, the person in charge of the construction site, said that this was proposed in response to some people's carelessness in wearing safety helmets. Although there is only one more word "good", its safety requirements have been deepened a lot.

Captain Wang accompanied us upstairs and downstairs to look around. The top brick wall is being laid today, and the aluminum window frames on the exterior walls and the wooden door frames on the interior walls are being installed. After the inspection, Engineer Zhao discovered two problems and asked them to correct them immediately. I really admire Engineer Zhao’s construction experience. Captain Wang said he has a sharp eye. Although the matter is small, it does affect the quality of construction. It is recorded as follows.

1. The bottom of a few aluminum alloy window frames is close to the brick wall. The reserved gap is too small, as shown in Figure 1. After the window sill is plastered, the plastered surface is higher than the bottom surface of the window frame, which can easily cause cracks between the window sill and the window frame, causing water seepage on the window sill and dampness on the wall when it rains in the future. The correct method is shown in the figure. As shown in Figure 2, the window frame is 20~30mm higher than the window sill brick wall. After the window sill is plastered, it is better to be 10mm lower than the bottom of the window frame, so that rainwater can flow outward smoothly and eliminate the common quality problem of cracks and water seepage at the window sill. .

2. The top and sides of a few wooden door frames are too close to the brick wall, as shown in Figure 3. After plastering in the future, the plaster layer will cover the door frame too much, which will affect the appearance. Correct. The method is shown in Figure 4. There should be a gap of 10~15mm between the wooden door frame and the brick wall. After the plastering is completed, it will be more beautiful to cover the door frame with 5~8mm of plaster.

June 23. Thunderstorm on Sunday

I was about to take a rest after lunch when I suddenly received a call from Engineer Zhao, saying that the weather forecast was for thunderstorms in the afternoon, with wind force of level 6 or level 7 and gust level of level 8. We went to the construction site separately to check. To implement relevant quality and safety measures, I was asked to go to the dormitory construction site I went to yesterday morning. Engineer Zhao said on the phone that in our construction industry, we must pay great attention to weather changes, changes in temperature, wind, rain, and rain. Snow, frost, etc. may have an impact on the construction quality and production safety. Engineer Zhao reminded me to pay attention to the following aspects when I went to the construction site:

1. The top brick wall just built yesterday was damaged by the cornice ring beam. Before the concrete is poured, windproof and stable measures should be taken;

2. Check whether the derrick wind rope anchorage is secure;

3. Check the rainproof measures for electrical equipment such as motors on the construction site Whether it is intact;

4. Check whether there are scattered wooden boards and bricks on the scaffolding to prevent them from being blown down by strong winds and injuring people;

5. Check whether the roof of the cement warehouse at the construction site is leaking and whether the ground is Elevate?

6. Check whether the porous roof slabs are stacked for use and whether the storage site is solid to prevent the soil from sinking after rain and the floor slabs from collapsing and breaking;

10. Pay attention to the construction site on duty The personnel will conduct a comprehensive inspection after the thunderstorm passes and report the situation to the project management department by phone in a timely manner

Pearls and Necklaces

Monday, June 24, turned cloudy

A few days ago, Engineer Zhao suggested that I prepare a notebook to record at any time some bits of business knowledge I encountered from books, newspapers, magazines, during visits and study, or in daily work. This will help me accumulate knowledge and improve my technical level. It will be of great help. Engineer Zhao said that this was a summary of his own decades of experience. He also made a wonderful metaphor. He said that although the bits and pieces of information he usually collected were just words, he regarded them as bits and pieces. Pearls. A single pearl may not show much value, but if there are many pearls strung together to form a necklace, it becomes a work of art, which has a certain value. He said that he had written many influential technical papers, and these usually inconspicuous bits of information played a big role.

I am grateful to Engineer Zhao for his sincere help. I wrote two sentences on the title page of my notebook by the great Chinese mathematician Mr. Hua Luogeng: Genius lies in diligence, and knowledge lies in accumulation

The weather is sunny on Tuesday, June 25

The paper mill project is undergoing bidding today, and the team is led by Manager Qian of the project department. I was also placed in the bidding team. This is my first time to participate in a bidding activity. Maybe the leader wants me to see the world and receive training.

Today *** there were five bidders. As a result of the bid opening, our company’s quotation ranked second, which was similar to the first bid. However, only our company has the shortest construction period. The owner of this project is most concerned about the construction period. At this point, our company is very competitive.

Based on past bidding experience, the bid evaluation committee is likely to decide the winning bidder among the first bidder in terms of quotation and first bidder in construction period through the defense. After the bid opening, Manager Qian immediately held a bidding team meeting and required full preparation for the defense. The quotation was prepared by Xiao Li from the company's budget department, and the construction period was prepared by me. Manager Qian repeatedly reminded me to speak calmly, orderly, and when necessary. Confidence to win.

As expected, near noon, the bid evaluation committee notified us of a reply. The question to us was: "The total construction period of your bid is only 75% of the national construction period quota. Please state the reason for the advance. and measures." Upon hearing this question, Manager Qian gave me a steady look, expressing both hope and encouragement. Due to preparation in advance, I focused on introducing the construction plan and construction steps of the main factory building, and reasonably handled the construction sequence of roof trusses, roof hoisting and indoor floors of the boiler room and turbine room. The jury's conclusion to our defense was that the construction plan was carefully considered, the construction arrangements were reasonable, and it was feasible to shorten the construction period.

Finally, when the host of the bid evaluation announced that our company was the winning bidder, my heart was so excited that I wanted to jump out of my chest. Manager Qian shook my hand vigorously. This was a response to my proposal for the construction of the main factory building. The plan and today’s defense performance are definitely appreciated.

In the evening, Manager Qian treated the bidding team members to a delicious meal.