Village rainstorm emergency plans

2021 Township Heavy Rain Emergency Plan Sample (Selected 5 Articles)

In the ordinary study, work, and life, it is inevitable that some accidents will occur. In order to avoid things getting worse, If the situation develops in a bad direction, it is necessary to prepare detailed emergency plans in advance. How should we write an emergency plan? The following are the 2021 township rainstorm emergency response plan examples (selected 5 articles) that I have collected for you. I hope it will be helpful to you.

Township Emergency Plan for Rainstorm 1

In order to ensure that when a destructive rainstorm occurs in the mineral processing plant, all emergency work can be carried out efficiently and orderly to minimize casualties and Property losses, according to the State Council's "Regulations on Heavy Rainstorms in Damaged Areas" and combined with the actual work of our factory selection, this specially prepared plan

1. Composition of emergency agencies

1. Leading group

p>

The work of preventing heavy rain disasters in the selection plant is organized and implemented under the leadership of the superior leadership group for heavy rain disaster prevention and reduction. The leading group for rainstorm prevention and disaster reduction in the plant selection is headed by the factory director, with the deputy director and section chiefs as team members, and the dispatching department in the plant selection as the headquarters.

2. Main Responsibilities

( 1) Strengthen leadership, improve organization, strengthen work responsibilities, strengthen familiarity and understanding of destructive heavy rains and heavy rain disaster reduction work, and improve the formulation of various emergency plans and the implementation of various measures

(2) Make full use of various channels to carry out publicity and education on earthquake disaster knowledge, organize and guide the popularization and education of full-length earthquake prevention and earthquake resistance knowledge, extensively carry out self-rescue and mutual rescue training in earthquake disasters, and continuously improve the awareness and basic skills of earthquake prevention and resistance among employees.

(3) Seriously do a good job in material support, actively prepare in strict accordance with the requirements of the plan, implement food and drinking water, anti-freeze and rain, emergency equipment and other materials, and strengthen management to always maintain good combat readiness

p>

(4) After the destructive heavy rain occurs, take all necessary means and organize all forces to comprehensively carry out disaster reduction work to minimize the losses caused by the disaster

(5) Schedule all active efforts factors, quickly restore production order, and fully guarantee the stability of production and employees' lives

2. Earthquake emergency response

1. After receiving the heavy rain or impending rain warning (warning) from superiors , the leading group immediately entered a war-ready state, issued relevant news and warnings in accordance with the law, and was fully responsible for various earthquake relief work. All relevant organizations are ready to carry out rain prevention and disaster reduction tasks at any time

2. Organize relevant personnel to conduct comprehensive inspections of their buildings, block and close dangerous places, and stop various large-scale activities

3. Strengthen the management of flammable and explosive items, toxic and harmful chemicals, strengthen the protection of important equipment and places in large boilers, power transmission rooms and hangars, and ensure the smooth progress of earthquake relief and disaster reduction:

4. Increase the Promote and educate employees, and do a good job in stabilizing the ideological stability of employees

5. Strengthen various types of duty duties, maintain smooth communication, timely grasp the situation at the grassroots level, and make every effort to maintain the order of factory production and life

6 , Implement various material preparations according to the plan

3. Post-earthquake emergency operations

1. Regardless of whether there is a forecast or warning, after destructive heavy rains occur in the area or adjacent areas, , the leading group immediately went to the local command post, and all rescue and disaster relief teams must assemble in the unit and be on standby within one hour after the earthquake

2. The leading group, under the unified organization and command of the superior, quickly organized plant selection rescue and disaster relief< /p>

(1) Quickly issue an emergency alarm (continuous rapid bells and shouts) and organize the evacuation of all personnel still stranded in various buildings:

Employees in each section of A The organization of the chief and deputy section chiefs enters the rain shelter

(2) Quickly close and cut off the bookstore (except the emergency lighting system) to prevent other disasters after the heavy rain

(3) Quickly carry out On-site rescue work with rescue personnel is the main content, and the injured persons are promptly transferred and sent to the attached rescue station for rescue

(4) Strengthen the protection of important facilities and important items.

3. Actively carry out ideological propaganda and education work among employees, eliminate panic, stabilize people's hearts, quickly restore normal order, and make every effort to maintain social security and stability

4. Quickly understand and master The disaster situation of the processing plant shall be summarized and reported to the company office in a timely manner

4. Others

1. After entering the emergency state of heavy rain, the processing plant headquarters will issue various orders and instructions through various methods , The earthquake prevention and disaster reduction leading group will convey various orders and instructions through telephone calls, dictation, etc.

2. In the emergency operations for earthquake relief and disaster reduction, we must cooperate closely, obey the command, ensure the smooth flow of government orders and the implementation of various tasks in the township emergency plan for rainstorm prevention 2

1. Purpose

Before the natural disasters of typhoons and rains come, make various emergency preparations in advance, quickly and effectively control the situation and handle it properly, so as to minimize the losses that may be caused by typhoons and rains.

2. Organizational structure

(1) Typhoon and rainstorm prevention leading group:

Commander-in-chief: xxx.

Deputy Commander: xx.

Members: xx.

(Members of the above-mentioned leadership group are not allowed to take leave under normal circumstances. If they ask for leave under special circumstances, the commander-in-chief will arrange for other personnel to take up the duties)

There is a rescue team:

(2) Typhoon and rain prevention working group:

1. Equipment and supplies group:

Team leader: xx.

Team members: xx.

2. Security Team:

Team Leader: Security Captain.

Team members: all security team members.

3. Comprehensive information group:

Team leader: xx.

Team members: xx.

3. Responsibilities

(1) Responsibilities of the typhoon and rain prevention leading group:

1. Responsible for the organization, coordination and supervision of typhoon and rain prevention work , inspection and other comprehensive work.

2. Commander-in-Chief xxx is responsible for overall work; Deputy Commander-in-Chief xxx assists the Commander-in-Chief in typhoon prevention work.

(2) Responsibilities of each typhoon and rain prevention working group:

1. Equipment and materials group:

⑴ Responsible for implementing the company’s on-site buildings and Reinforcement, protection, drainage and waterlogging prevention of equipment and facilities.

⑵ Responsible for evacuation and transfer of equipment in open air and low-lying areas.

⑶ Responsible for the normal operation inspection of electrical equipment and facilities to ensure safety.

⑷Before the rainy season every year, be responsible for checking whether the surrounding drainage ditches are smooth and whether the transparent tiles have exceeded their service life and whether they are aging. Check whether the wind balloon is secure.

2. Security Team:

⑴ Responsible for the safety and security work in the factory area, and do a good job in emergency rescue work at fixed posts and patrol posts.

⑵ Responsible for the preparation of necessary emergency supplies.

⑶ Responsible for assisting in typhoon and rainstorm evacuation inspections.

⑷Responsible for handling the detected safety hazards.

⑸ Responsible for the rescue work of personnel during rescue work.

3. Comprehensive information group:

⑴ Immediately report to the company after receiving the typhoon storm notice from superiors or relevant units through news, TV, radio, newspapers, Internet, meteorological stations, etc. leadership and general command, and communicated to all departments.

⑵ Organize a meeting of members of the typhoon prevention headquarters. Members of the headquarters should arrive at the meeting site within 10 minutes. The commander-in-chief will arrange to implement emergency measures to combat typhoon storms and activate corresponding emergency plans.

⑶ Notify relevant departments, and the person in charge of the relevant department will notify overseas warehouse personnel to take precautions.

⑷ Responsible for collecting the latest typhoon and rain warning information in a timely manner, paying attention to the latest developments of typhoons, and reporting to the general (deputy) commander.

⑸ Responsible for the coordination, inspection and supervision of administrative and logistical matters.

⑹ Responsible for arranging food and accommodation for evacuees and staff.

⑺An emergency vehicle responsible for personnel rescue.

⑻ Contact the medical rescue agency to coordinate and arrange medical personnel.

⑼Responsible for the inventory of people, property and property after the typhoon.

⑽ Responsible for assisting the Finance Department in settling insurance claims.

IV. Typhoon Warning Levels

According to the typhoon warning level classification of the Zhuhai Meteorological Bureau, tropical cyclone warning signals are divided into four levels from low to high according to the threat and severity of the tropical cyclone. Level:

Level IV (general, the warning signal is white) Level III (serious, the warning signal is yellow)

Level II (serious, the warning signal is orange)

Level I (extremely serious, early warning signal is red)

5. Emergency response

One emergency response corresponds to the early warning level, and the emergency response is divided into IV from low to high. , III, II, and I levels.

2. Emergency response can be activated and canceled:

The activation time, which level to activate and the cancellation time are determined by the headquarters. The deputy commander-in-chief, based on the movement direction of the typhoon and the forecast data of the local meteorological station, agreed and then reported it to the company leader for approval.

Three emergency response actions:

Level I emergency response is the most effective. Emergency response, followed by level II, level III, and level IV is the lowest level response. The actions of each level of emergency response include all the contents of low-level response.

1. Level IV emergency response (wind preparedness state):

1.1 To initiate a Level IV emergency response, the required personnel (must be male) are in place:

1.1 .1 The headquarters should designate one member of the headquarters to be on duty;

1.1.2 Arrange one person each for patrol inspection in the warehouse and carton workshop;

1.2 Material preparation:

< p> 1.2.1 The security department receives raincoats, flashlights, and water shoes to protect against typhoons and heavy rains from the warehouse.

1.2.2 The equipment department prepares an elevated ladder, a herringbone staircase, a forklift, 40KG of iron wire, 20KG of plastic rope,

a pair of large and small pliers, an impact drill, and weatherproof deployment In the cardboard warehouse.

1.2.3 The warehouse prepares special colored striped cloth to protect against typhoon and rainstorms.

1.3 Response actions:

When activating the IV emergency response plan, members of the typhoon prevention headquarters, male managers and supervisors of each department must live in the company, and their mobile phones must be turned on around the clock. After receiving a call or message notification, you should arrive at the scene within 10 minutes.

1.3.1 Equipment Department.

First, check and carry out windproof reinforcement work in the factory area.

Second, complete the windproof reinforcement project reported by other departments.

Third, before the typhoon comes, assist the administrative department to fix trees and tree shades when necessary.

1.3.2 Ministry of Transport.

First, check whether the typhoon protection cable is loose and reinforce it.

Second, does the product have a rain cover?

Third, check and clean the paper sheets, plastic bags, and stretch films of the old and new shipping platforms.

1.3.3 Administration Department.

First, check whether the doors and windows of the canteen and dormitory are firm and closed, and whether the glass is loose or broken.

Second, check whether the typhoon-proof cables in canteens and dormitories are loose.

Third, whether the greening industry pruned the greening trees and supported and fixed the trees. Check the factory area for saplings that are easily blown down by wind and reinforce them.

Fourth, security checks the factory area for potential safety hazards.

Fifth, check whether the green tree shade shed is tightened and reinforced with iron wire to ensure that there are no safety hazards.

1.3.4 Warehousing Department.

First, check whether the rolling shutter door can be closed, whether it is derailed, and whether it is broken.

Second, check whether the glass window is firm and whether the glass is loose or cracked.

Third, check whether the wall is loose.

Fourth, check whether the columns and beams are loose.

Fifth, check whether the rain cover is complete.

1.3.5 Quality Department.

Prepare the angle iron, rope and tape for binding the glass door. The inside and outside sides were fixed with angle irons, the door seams were sealed with tape, and the transportation department was notified to park a large truck at the entrance to block the wind.

1.3.6 Cartons, cardboard, and auxiliary workshops.

First, check whether the rolling shutter door can be closed, whether there is derailment, and whether there is any breakage.

Second, check whether the glass window is broken.

Third, move the product 2 meters away from the window.

2. Level III emergency response (windproof and rainproof state).

2.1 To initiate a Level III emergency response, personnel should be in place (must be male).

2.1.1 The chief and deputy commander-in-chief of the headquarters are on duty; the director of the transportation department and the director of the warehousing department are on duty.

2.1.2 There are 5 members of the rescue team. Township Emergency Plan for Rainstorm Prevention 3

In order to further carry out emergency response work for natural disasters such as high temperature seasons, heavy rainfall, rain and snow, and prevent major losses to the lives and property of the needy elderly and staff in nursing homes, special Develop this emergency plan.

1. Emergency organization structure

1. Extreme weather emergency working group

Team leader:

Deputy team leader:

Team members: Responsibilities of each team leader and team members:

(1) Carry out daily inspections, implement the safety production responsibility system, and guard against extreme weather (high temperature, heavy rainfall, rain and snow) impact.

(2) Once extreme weather (high temperature, heavy rainfall, rain and snow) causes large-scale power outages and other accidents, relevant emergency work should be done in a timely manner and power supply should be restored as soon as possible.

(3) Decide whether to activate the emergency plan based on the impact of extreme weather (high temperature, heavy rainfall, rain and snow).

(4) Report the disaster situation to superiors in a timely manner and take effective measures to actively respond.

(5) Request external support when necessary.

(6) All members should perform their duties and responsibilities under the unified command of the team leader, and work together to prevent extreme weather.

2. Extreme Weather Emergency Rescue Team

Captain:

Team members:

(1) Normally strengthen the power distribution room and fire protection system , circuit system, water and electricity room safety inspection.

(2) When extreme weather (high temperature, heavy rainfall, rain and snow) simultaneously triggers a disaster, organize personnel to carry out rescue operations.

(3) Report the consequences of extreme weather (high temperature, heavy rainfall, rain and snow) to the natural disaster emergency team in a timely manner.

(4) Summarize the emergency response work experience afterwards.

(5) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), promptly organize the transfer of the elderly in the hospital to a safe area to ensure the safety of the elderly in the hospital.

2. Emergency Procedures

1. Emergency Procedures for Nursing Homes

(1) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), emergency response procedures should be carried out quickly Take appropriate emergency measures.

(2) Timely report to the leader of the natural disaster emergency working group (notify the general leader at night), and report specific disasters (such as lightning strikes and fires, lightning strikes and power outages) caused by natural disasters (high temperature, heavy rainfall, rain and snow) , equipment failure caused by lightning strikes, floods, etc.).

(3) If during normal working hours, if time permits, the office should notify various departments by phone and other forms to actively organize responses and try to avoid unsafe incidents.

(4) If time is urgent, the leader of the natural disaster emergency working group should be reported immediately (notify the general leader at night), explain the details, issue notices to various departments, and promptly arrange for the nursing team to properly arrange for the elderly to do Do a good job in avoiding risks. In the event of a strong thunderstorm, all teams should be reminded to cut off the power supply of electrical equipment to prevent lightning strikes from damaging the equipment.

(5) If extreme weather causes floods, personnel should be organized immediately to fight the floods.

2. Emergency procedures for each team

(1) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), each team should, if permitted, turn off all electricity The power supply to the equipment must be cut off first and then put into use after the weather returns to normal.

(2) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), immediately prepare for fire prevention, flood prevention, and power outage prevention.

(3) In the event of a power outage caused by a sudden natural disaster (high temperature, heavy rainfall, rain or snow), each team should be notified immediately to turn on emergency lighting, activate backup power in a timely manner, and promptly notify the electrician or person on duty Actively cooperate with disposal.

(4) Strengthen inspections of the elderly’s rooms, comfort the residents, and pay attention to fire prevention, flood prevention, and electric shock prevention.

3. Safeguard Measures

1. The office strengthens self-examination and self-correction of safety hazards in the hospital, and solves problems immediately if they are found.

2. Safety officers implement a 24-hour duty system to ensure that they are on call 24 hours a day.

3. The service room is regularly equipped with emergency lights, flashlights and other lighting supplies, which should be inspected regularly and kept in good condition.

4. The clinic should strengthen daily management, keep emergency calls open, and be equipped with sufficient treatment drugs.

5. The office should organize emergency response drills for extreme weather (high temperature, heavy rainfall, rain and snow). Through the drill, everyone will be familiar with the emergency response procedures for extreme weather (high temperature, heavy rainfall, rain and snow). , to ensure the safety of life and property of all personnel in the nursing home. Township Emergency Plan for Rainstorm Prevention 4

In order to prevent heavy rains, thunderstorms and other severe weather, prevent possible flood disasters, and ensure the personal safety of teachers and students and campus property, this emergency response plan is specially formulated based on the actual situation of our school. .

1. Guiding ideology

Prevent accidents, ensure personnel safety, and reduce property losses.

2. Scope of application

Heavy rain, thunder and lightning, strong wind and other severe weather.

3. Preparation work

1. Before the heavy rain comes, carefully check the condition of the school building to see if the roof is leaking and the walls are exposed to rain. Clean the sewer pipes, ditches and other drainage facilities. Problems are repaired promptly.

2. Educate teachers and students on safety knowledge against heavy rain, lightning and floods, so as to prepare for rainy days.

3. Check the surrounding environment of the school to prevent accidents in the school caused by external reasons.

4. Check circuit equipment to prevent accidents caused by water splashing.

5. The division of labor is in place and personnel and responsibilities are implemented.

6. Check the water and river embankment area around our school, formulate flood prevention arrangements, and prepare personnel and equipment;

7. Determine evacuation routes and resettlement locations in emergency situations , organize teachers and students to carry out self-rescue, mutual rescue, and escape drills.

4. Emergency measures

1. Pay attention to the weather forecast. In case of severe weather or entering the flood season, each school must be on duty 24 hours a day, and all personnel should keep communications open 24 hours a day so that they can be on duty in an emergency. Ability to deploy various personnel in a timely manner under certain circumstances.

2. During heavy rain periods, school duty personnel and patrol personnel should frequently patrol throughout the school. If any danger is discovered, they should immediately report to the leader on duty and initiate emergency procedures.

3. In severe thunder and lightning weather, school personnel and distance education equipment must be protected from lightning.

4. Once danger occurs in the school building, students should be quickly organized to evacuate and move to safe areas in an orderly manner. Teachers must first ensure the personal safety of students.

5. Timely deliver information and report the situation to relevant departments and parents through campus radio, telephone, school newsletter and other media and communication tools.

6. Pay attention to the road conditions of students going to and from school. If the roads are damaged or there are safety hazards and students cannot go home, the school should properly accommodate the students and contact parents in time.

7. In accordance with the requirements of superior leadership, organize personnel in a timely manner and implement various preparatory measures.

5. Work Requirements

1. We must attach great importance to the ideological aspect, and in the spirit of being responsible for the cause of the party and the people, we must overcome paralysis, laxity, and carelessness, and conscientiously do a good job in all aspects. Prepare.

2. The work must be well implemented and the division of labor and responsibilities must be clear.

3. The organization must be coordinated and effective to ensure the smooth flow of government orders. Township Emergency Plan for Rainstorm Prevention 5

1. Purpose

In order to ensure the personal safety of employees, the company’s property safety, and defense plans, countermeasures and measures are formulated in advance for various typhoons. When there are typhoons and heavy rains, the company's emergency leadership team's safety work is commanded, decided and dispatched according to the plan, and wind prevention, rain prevention rescue and disaster relief are strengthened. The initiative and predictability of typhoon and rainstorm prevention work can enable more reasonable and scientific command, thereby reducing the economic losses caused by typhoon storms and rainstorms. This plan is applicable to abnormal weather such as typhoons, heavy rains, lightning, strong winds, etc. According to the guiding ideology of the "XX City Special Natural Disaster Rescue Emergency Plan" and the actual situation of the company, this plan is specially formulated.

2. Organizational Structure and Responsibilities

1. Typhoon and Heavy Rain Prevention Leading Group:

Commander-in-Chief: xx.

Deputy Commander: xx.

Team members: xx.

(The above-mentioned leadership group members are composed of all staff of the General Affairs Department and heads of various departments. If there are any adjustments to the work location, the plan to prevent typhoons and rainstorms will begin.

The person in charge of the position will Automatically assigned, no need to change files

2. Responsibilities:

xxx (responsible for task allocation of various departments)

xxx (responsible for information contact)

xxx (responsible for the inspection and protection of mechanical equipment in the manufacturing department workshop)

xxx (responsible for the safety of company buildings)

xxx (responsible for coordinating the work of various departments)

xxx (responsible for employee safety)

Safety team leader (responsible for surrounding environment monitoring)

3. Plan start:

Received the typhoon rain from Zhuhai Meteorological Observatory Early warning signal, this plan is officially launched

3. Procedures

1. Report:

When the personnel and general affairs department receives typhoon information from the meteorological department or superior. and heavy rain, they should report to the general manager for the first time (when the general manager does not report to the deputy general manager), and the general manager convenes a meeting for the safety emergency response leadership group to initiate the safety emergency plan

 2. Organization. and implementation:

(1) After the emergency plan is launched, the safety emergency leadership team should go to the front line to supervise the implementation of relevant work.

(2) The competent department should evacuate employee safety. The area is arranged in accordance with the company's requirements and the company's unified arrangements to avoid casualties. Employees who cannot go to the company will find ways to notify them to stay in a safe place.

(3) After the company decides to resign, it will be determined by the general manager. The personnel of the General Affairs Department are responsible for the return transportation arrangements of the employees.

(4) If the company is detained for special reasons, the personnel of the General Affairs Department should make arrangements for the employees, and the company should ensure the safety of the employees.

(5) Pay close attention to the progress of typhoons and heavy rains, maintain smooth communication 24 hours a day, and report and convey disaster situations in a timely manner so that all types of personnel can be deployed in an emergency to minimize losses.

< p> (6) When a disaster occurs, the company should arrange 24-hour on-duty personnel to deal with emergencies.

(7) After the disaster occurs, it should promptly summarize and report the disaster to relevant departments and business partners. Impact on the company. Organize losses and notify insurance companies in a timely manner

3. Before the arrival of typhoons, heavy rains and other abnormal weather:

(1) Strengthen inspections to eliminate safety hazards.

(2) Close doors and windows, remove or reinforce fallen objects such as window sills and roofs.

4. Staff dormitory No. 1 is supervised by Tan xx;

< p> 5. Dormitory building No. 2 is supervised by Huang xx;

6. The office building (including the canteen) is managed by civilian staff;

7. The workshop is supervised by xx.

;