Traditional Culture Encyclopedia - Weather forecast - Emergency plan for high temperature heatstroke prevention (general 6 articles)

Emergency plan for high temperature heatstroke prevention (general 6 articles)

? Emergency plan refers to the preparation of response measures in advance for possible disasters and accidents. In order to face the possible safety accidents in time, we will formulate the emergency plan in advance, and the emergency plan should be analyzed according to the actual situation. Will you learn from excellent emergency plans? The following is my emergency plan for high temperature heatstroke prevention (commonly used 6 items), which is for your reference only, and I hope to provide you with reference!

Emergency plan for high temperature heatstroke prevention (6 general articles) Part 1? 2

? 1, use:

? In midsummer, the sunshine intensity is strong and the hot weather continues. In order to do a good job in heatstroke prevention and cooling at the construction site in summer, ensure the health of construction workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high temperature weather, these measures are specially formulated.

? 2. Scope of application:

? This system is applicable to xx Project Department of xx Power Construction Company.

? 3. Specific provisions:

? (1) Seriously implement the responsibility system for heatstroke prevention and cooling.

? Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.

? (2) Reasonable arrangement of work and rest time.

? Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.

? (3) Strengthen the rotation rest at work.

? In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.

? (4) Ensure that there is enough drinking water supply at the site.

? Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be provided on site to effectively prevent heatstroke and avoid heatstroke.

? (5) Implement heatstroke prevention and cooling items.

? We should pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil and wind oil essence, and implement heatstroke prevention and cooling items for each worker.

? (6) Do a good job of fire prevention in summer.

? In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment according to regulations.

Emergency plan for high temperature heatstroke prevention (6 general remarks) Part II? three

? In midsummer, the temperature rises, and this method is specially formulated to do a good job of heatstroke prevention and cooling in the summer construction site, protect the health of employees, and prevent production safety accidents such as heatstroke caused by high temperature weather.

? First, the security department should go deep into the workshop, publicize the knowledge of heatstroke prevention and first aid, and improve the safety awareness of all employees.

? Two, the security department and the office should pay close attention to the weather forecast about high temperature weather.

? 1, and the maximum daily temperature is greater than or equal to 33 degrees Celsius. Start heatstroke prevention and cooling measures: ensure sufficient drinking water supply in the workshop. Designate a special person to be responsible for the cold storage of drinking water, and ensure the supply of ice water at least three times a day (but ice water cannot pass through ice).

? 2. When the highest temperature of the day is greater than or equal to 35 degrees Celsius, start high-temperature heatstroke prevention measures: shift work and rest work are taken in the workshop to shorten the continuous working hours of employees; In addition to ensuring adequate drinking water supply, the administrative department also needs to arrange the cooking of summer drinks, such as mung bean water, sour plum soup, ginger and salt tea, watermelon and so on. , and timely supplement salt water drinks.

? 3. If the maximum daily temperature is greater than or equal to 37 degrees Celsius, start the continuous high-temperature heatstroke prevention measures: the workshop work shall be rested in shifts, and the continuous working hours of employees shall not exceed the time stipulated by the state, and outdoor open-air operations shall not be arranged; The administrative department should not only ensure adequate drinking water supply, make summer drinks well, but also replenish salt water drinks in time.

? 3. The purchasing department shall cooperate with the office to implement heatstroke prevention and cooling items, such as Ren Dan, Huoxiang Zhengqi Water and Ten Drops of Water. The production equipment dept. shall, in combination with the actual production situation, formulate a heatstroke prevention and cooling drug plan, and timely purchase and distribute it to each team in the workshop.

? Four, check the workshop heatstroke prevention and cooling equipment. The production equipment department shall make statistics on the damaged fans, air conditioners and cooling equipment, and organize procurement or maintenance after reporting to the company for approval. Ensure the normal operation of heatstroke prevention and cooling equipment in the workshop.

? Five, do a good job of fire prevention in summer. In view of the hot weather in summer, lighting mosquito-repellent incense and using electrical appliances are prone to fire accidents, and fire prevention measures must be strengthened. The safety department shall regularly inspect the flammable places in the whole plant, deal with the problems immediately when they are found, and provide fire-fighting equipment as required.

Emergency plan for high temperature heatstroke prevention (general 6 articles) Part III? Rehearsal Scheme of Emergency Plan for High Temperature Heatstroke Accident High temperature heatstroke is a common accident in the construction process of high temperature weather. Judging from the final injury degree of heatstroke victims, it is very likely to be rescued if the heatstroke victims are rescued in time and in the right way. The purpose of preparing the emergency plan for high temperature heatstroke accident is to try our best to rescue the heatstroke victims from the death line and reduce the casualties of the accident to a minimum.

? I. Scope of application of the plan This emergency plan is applicable to all employees involved in the production of this project. When someone has heatstroke in the workplace, they will take the responsibility of emergency rescue for others' heatstroke. If someone is found to have heatstroke in other places, he shall bear the obligation of emergency rescue for heatstroke of foreigners.

? Second, the drill situation simulated that when the project department poured column concrete, due to the continuous high temperature, a construction worker of the concrete team fell to the ground due to heatstroke.

? Third, the time of the exercise is set at XX, XX, XX.

? Iv. Planning organization and responsibilities:

? 1, high temperature heatstroke accident organization (commander in chief)

? Chief Commander: Xu Jian's main responsibilities:

? First, be fully responsible for on-site emergency work;

? B, decided to start the emergency plan;

? C, command emergency work.

? Deputy Commander: What does Ding Jinqing do? Main responsibilities:

? First, organize emergency work;

? B, coordinate the unified scheduling of all departments;

? C, responsible for investigation, monitoring and the determination of the first aid plan.

? On-site conductor: He Xuefeng, Song, etc. Main responsibilities:

? A, communicate and contact the drill personnel of various departments, and be responsible for the smooth flow of rescue lines and on-site alert;

? B, assist the commander-in-chief to do a good job in various logistics affairs and preparation of drill materials and other related matters;

? C, coordinate communication with local hospitals and public security, and be responsible for the collection and arrangement of drill data.

? 2. The responsibilities of each group:

? (1) Accident handling group: The main task is to determine the rescue plan and organize personnel and vehicles to rescue heatstroke victims;

? (2) Medical rescue team: The main task is to arrive at the scene of the accident in time to rescue the heatstroke victims, and decide to give first aid at the scene or the nearest hospital according to the injury to ensure the life safety of the wounded.

? (3) Alert Liaison Group: The main tasks are to upload and issue leadership instructions, clear traffic routes, communicate with the outside world to inform the scene of accidents, send people to meet at intersections, and record the whole process of drills.

? (4) Logistics Support Group: The main task is to obey the instructions of the leaders of the headquarters, arrange the dispatch of rescue drill vehicles and timely supply of emergency funds.

? Each group of personnel consists of an accident handling group: Xu Jianhe, the other medical rescue groups: Zhou Xiujuan, Jin Lingjuan, the alert liaison group: Zhao Yisheng, Zhu, and, and the logistics support group: Jin Jiyong and Wang. Exercise procedures:

? Simulated accident: Zhao simulated heatstroke of construction workers.

? 1, the accident happened at XX, and the construction worker fell to the ground with heatstroke.

? 3, in the process of disposal, 1, XX, XX concrete team found danger, immediately notify the project manager Xu Jian.

? 2. After receiving the accident report, the project manager of 2.XX Branch immediately started the emergency plan and reported the situation to relevant departments. He Gan, the person in charge of safety, called the emergency number "120" and arranged for the nearest hospital to prepare for rescue.

? 3. At XX, at XX, the field personnel carried the heatstroke employees to a cool and ventilated place to prevent secondary injuries and wait for the medical rescue team to rescue them.

? 4. At 4.XX, the on-site alert group immediately isolated the scene of the accident to protect the scene of the accident.

? 5. At XX, at XX, the on-site rescue team immediately carried the first-aid medicine box to practice the scene and quickly judged the condition. Artificial first aid was used at the scene, and the forehead and sweat of heatstroke patients were gently wiped with cold towels. And unbutton the coat of heatstroke patients to achieve good ventilation effect.

? 6, XX XX point with cool ventilation drugs into the nostrils of heatstroke, so that its ventilation is smooth. Patients with mild heatstroke should be given an appropriate amount of cold and salty drinks and take corresponding drugs. Patients with moderate heatstroke were taken to the hospital immediately.

? 7. At XX, people suffering from heatstroke wake up slowly at XX.

? 8. In XX, the drill ends in XX. No one was injured this time, but the rescue process is the most important.

? 9. In XX, what did the deputy commander of XX do to report the drill to the general commander Xu Jian, who made a simple summary of the drill.

? An ambulance, a stretcher bed and a medicine box. Precautions 1. The alert liaison group should carefully record the exercise time, report time, personnel injuries and on-site personnel.

? 2. On the day of the drill, the logistics support team must ensure that all drill personnel and materials are transported to the drill site before 10, and emergency funds and logistics-related materials are arranged in place.

? Rescuers should arrive at the scene in the shortest time. After the rescuers arrive at the scene of the accident, they should obey the command of the headquarters and carry out first aid work. After the rescue, evacuate all personnel from the scene of the accident and to a safe area.

? 4. Commander-in-Chief Xu Jian summarized the drill and announced that after the drill, all the drill personnel left the drill site to restore the construction order.

? Through this drill, all our construction workers will be more clear about the rescue procedures of the emergency rescue plan. In order to deal with emergencies, the orderly implementation of emergency plans was ensured, time was gained for rescue, and the purpose of drills was achieved.

Article 4 of the emergency plan for high temperature heatstroke prevention (general article 6)? I. Purpose

? In order to follow the principle of "giving priority to ensuring the safety of personnel and preventing the spread of accidents" when heatstroke accidents occur during construction; Unified command, graded responsibility, regional priority, self-help and social assistance "principle. In order to control the accident, effectively rescue the wounded, reduce accident losses and prevent the accident from expanding, this rescue plan is specially formulated.

? Second, the project overview

? Renhuai city Guojiu New Town Resettlement House Group II 1 Bid 1# Residential Building, with 2 floors underground and 3 1+ jumps above ground, with a total height of 99. 75m, with a building area of 400 12m2. It is a first-class building with a first-class fire resistance. Buildings on the ground are residential, plus or minus 0. 000 elevation relative elevation is 899. 700 meters. The structural transfer floor is on the first floor, the superstructure is a complex high-rise structure, and there are two garages underground. The structural form is frame-shear wall structure. The site is basically flat, the roads are smooth, and large vehicles can be connected. Water and electricity are connected to the site by the construction unit. The main contractors of each party are as follows:

? Employer: renhuai city Urban Development Investment Management Co., Ltd.

? Survey unit: Guizhou Ding Sheng Geotechnical Engineering Survey Co., Ltd.

? Designer: Guizhou Architectural Design and Research Institute Co., Ltd.

? Supervision unit: Guizhou Architectural Design and Research Institute Co., Ltd.

? Construction unit: Guizhou Construction Engineering Group Co., Ltd.

? Third, the basis of preparation

? 1, Law of People's Republic of China (PRC) on Work Safety.

? 2. Regulations on Safety Production License for Construction Projects.

? Measures for the supervision and administration of production safety in residential projects.

? 4. Regulations on reporting, investigation and handling of production safety accidents.

? Four, emergency rescue accident scope and accident characteristics

? Scope of accident practice: prevention of heatstroke safety accidents.

? Characteristics of the accident: heatstroke is a sudden safety incident. Generally, summer is a period of high incidence, or it is a high temperature place with poor ventilation. Symptoms such as chest tightness, dizziness, thirst, poor breathing and fatigue usually appear before heatstroke.

? Five, emergency plan organization

? The establishment of major accident emergency rescue leading group, responsible for the implementation of emergency plans.

? 1, emergency rescue command group:

? 1) An emergency team is composed of the project leader and the safety officer. Comrade Huang Xianchao, the project leader, served as the leader of the emergency team.

? Members: Li Xiaohong, Xie Jianbo, Sean, Cao Qing, Wang Xi and Feng Yu.

? The specific division of labor is as follows:

? (2) Li Xiaohong: Be responsible for understanding the accident situation and organizing on-site rescue.

? (3) Xie Jianbo: Responsible for strengthening the ventilation and heat dissipation at the rescue site in time.

? (4) Sean: Responsible for contacting the hospital immediately, explaining the accident location and situation in detail, and sending someone to meet at the intersection.

? (5) Cao Qing: Responsible for the dispatch of materials and vehicles on site.

? (6) Wang Xi and Feng Yu: Logistics services.

? Our company has a sufficient number of emergency equipment and medicines in all engineering projects and stations.

? In case of heatstroke accident in this unit or nearby units, the leader of the emergency rescue command group should unconditionally obey the arrangement of the emergency rescue command group and immediately join the ranks of emergency rescue.

? 2, emergency rescue headquarters responsibilities

? The National Wine New Town Project Department of our company is responsible for the command, arrangement, implementation and supervision of the emergency rescue of heatstroke accident within the construction scope of this project. Carry out the instructions of the state, industry and superiors, report the accident to the superiors in time, and direct and coordinate the emergency rescue work and the aftermath. Participate in the investigation and handling of accidents in accordance with the relevant regulations of the state, industry and superiors.

? 3, emergency rescue command group consists of departments.

? Emergency rescue office, security team, accident rescue team, medical rescue team, logistics support team, after-care team, accident investigation and handling team and other eight professional disposal teams.

? The responsibility of each professional group of intransitive verbs

? 1, emergency rescue office (person in charge: Li Xiaohong)

? Tel: XXXXXXXXXX

? Main responsibilities: responsible for the daily management of the "pre-plan" and taking collective responsibility for major accidents. Report and inform all members of the command group to rush to the scene of the accident immediately. When carrying out emergency rescue tasks, coordinate with other disposal groups, mobilize rescue teams according to the orders of the team leader, and deliver mechanical materials in time to carry out emergency rescue work.

Article 5 of the emergency plan for high temperature heatstroke prevention (general article 6)? nine

? District Construction Management Committee (Construction Transportation Committee), Housing Security Housing Authority, and all relevant units:

? In order to effectively do a good job in heatstroke prevention and cooling in the housing and urban and rural construction management industries in this Municipality, and to ensure the health of employees, the normal life of citizens and the safe operation of the city, according to the Emergency Notice of the General Office of the Shanghai Municipal People's Government on Doing a Good Job in heatstroke prevention and cooling (Hu Fu Ban Ming Dian [20xx] No.2, hereinafter referred to as the Emergency Notice), the relevant matters are hereby notified as follows:

? First, strengthen leadership and make careful arrangements.

? Leading cadres at all levels should attach great importance to it, strengthen organization and leadership, take the lead in caring about the production and life of employees who stick to their posts, and especially pay more attention to law enforcement duty personnel and outdoor workers at the grassroots level. All units should adhere to the people-oriented, formulate effective prevention and control measures for high-temperature heatstroke in combination with the actual situation, and effectively protect the health rights and interests of workers: strengthen publicity and education on safety production during high temperature, enhance employees' awareness of safety precautions in high-temperature weather operations, abide by operating procedures, correctly use high-temperature protective articles and personal protective articles, and strive to ensure the production safety of the housing construction industry in this city during high temperature.

? The second is to clarify responsibilities and implement safeguard measures.

? All construction enterprises should reasonably arrange and adjust the work and rest time in high temperature weather. In addition to emergency repair, we must strictly abide by the relevant provisions of the Notice of the General Office of the State Administration of Work Safety on Doing a Good Job in Summer Heatstroke Prevention and Cooling (No.[20xx] 1 17 of the General Office of Work Safety): if night construction is really necessary, it shall be implemented. Prohibit construction from disturbing people: do a good job in food hygiene and epidemic prevention at the construction site, strictly implement the food hygiene system, strengthen the hygiene management of food and drinking water, and avoid poisoning incidents caused by food deterioration. Necessary salty refreshing drinks and heatstroke prevention and cooling drugs should be provided in high temperature season. When legal infectious diseases and food poisoning occur at the scene, they should report to the relevant competent departments in time and take measures. Summer is the high incidence period of electric shock accidents and fire accidents, so it is necessary to strengthen the inspection of the safety protection facilities for fire prevention and electricity consumption on the construction site, and find and rectify them in time.

? All property service enterprises should strengthen the inspection of public parts in the property service area, pay attention to the safety of electricity consumption, and try their best to eliminate the hidden dangers of fire safety: they should implement the heatstroke prevention and cooling measures at the outdoor work site of the property, reasonably arrange the working hours of outdoor workers, implement rotation work, and appropriately reduce the labor intensity; They should remind owners and property users to pay attention to electricity safety, prevent heatstroke and cool down, and avoid accidents.

? Third, strengthen supervision and do a good job in emergency support

? Management departments at all levels should take heatstroke prevention and cooling as an important part of summer supervision, and strengthen the inspection of the implementation of heatstroke prevention and cooling measures in construction sites, gas facilities and equipment, and property communities. Building management and housing management departments and units in all districts should strengthen the duty force, implement the duty and information reporting system, prepare for emergency rescue, and ensure that personnel, measures and responsibilities are in place. In case of anomalies and emergencies, it is necessary to promptly organize forces to properly handle them and report them quickly according to regulations.

Article 6 of the emergency plan for high temperature heatstroke prevention (general article 6)? three

? In order to further strengthen the implementation of emergency plan safeguard measures, improve the ability of the project department to deal with production safety accidents and emergencies, and educate employees how to deal with emergencies correctly, accurately and quickly, all departments are specially organized to carry out emergency drills for continuous beams and hanging baskets. The exercise plan is as follows:

? First, the exercise time:

? XX, xx, xx, xx p.m.

? Second, the purpose of the exercise:

? 1, to prevent high-temperature heatstroke accidents in the field during high-temperature construction.

? 2. Respond quickly after the heatstroke accident and start the emergency plan procedure to minimize the deterioration of heatstroke and casualties.

? Third, the exercise plan:

? (A) the background of the emergency plan exercise

? During the construction of No.8 subgrade side ditch, a worker suffered from heatstroke while cleaning the garbage in the cable trough in the ditch.

? (2) exercise leading group:

? Leader of emergency rescue team: xxx.

? Team members: emergency team members, xx team leader and team leader.

? (3) Division of exercise and rescue:

? 1 emergency rescue team: led by team leader xx, assisted by xx, and composed of members of relevant departments and collaboration groups. Organize emergency rescue.

? Logistics support group: Sun, director of the office, is responsible for the basic first aid work of personnel in emergency rescue.

? External Liaison Group: Secretaries xx and xx are responsible for external liaison, contacting the green channel of xx People's Hospital, and providing timely rescue for heatstroke patients.

? (4) Exercise procedures and personnel responsibilities:

? 1, drill procedure: notify the emergency team to rush to the site-primary rescue on site, and carry the wounded to a flat and cool place for preliminary cooling treatment; At the same time, xx called the green channel ambulance to open a green rescue channel-xx immediately organized a team to maintain order at the scene-after the rescuers arrived, xx was responsible for cooperating with the rescuers to rescue the heatstroke victims, and assisted in carrying rescue vehicles to accompany them to the hospital-finally, the manager XX made a summary, and the safety director XX explained the common sense of preventing high-temperature heatstroke, self-help and mutual rescue, and matters needing attention-the drill was over.

? 2. Peng Pengguang, the leader of the emergency leading group, is the highest person in charge of emergency rescue work. During the rescue process, he urged the office, finance department and machinery department to be equipped with corresponding emergency materials and equipment. In case of heatstroke, he quickly started the emergency plan and commanded the rescue in an all-round way.