Traditional Culture Encyclopedia - Weather forecast - Safety inspection in flood season in work briefing
Safety inspection in flood season in work briefing
Safety inspection in flood season Since Chapter 1 of work briefing entered the flood season, the Highway Bureau of XX County has started the flood control plan for trunk roads in view of the continuous heavy rainfall, and has been on duty day and night, with endless holidays. The leaders are on duty at the front line, and the safety hidden danger investigation and rectification team, composed of departments such as road administration, maintenance, engineering and safety, will complete more than 80 bridges and 1.200 culverts by bridge on the 556.683 km highway, and carry out the special safety rectification action of "one road, one bridge, one culvert and one file, one risk and one policy".
In line with the principle of "strictness, delicacy and practicality", with the 305 provincial highway, 25/kloc-0 provincial highway and 346 national highway with frequent accidents and serious water damage as the key investigation objects, the investigation work plan of specific sections was studied and formulated, and the base number of dangerous sections was comprehensively found out, and files were filed one by one. Put forward targeted and easy-to-operate remediation measures point by point to ensure the effectiveness of the investigation and remediation work. The key points of this investigation and rectification include:
First, sections with sharp bends, steep slopes and poor sight distance;
Second, sections prone to geological disasters such as landslides and landslides; Third, bridges, culverts, safety facilities, highway reconstruction projects and disaster prevention projects that have already started. In view of the hidden dangers such as bridges, pavements, safety facilities and geological disasters found in the investigation, on the one hand, the bureau took the three major improvements of "division of responsibilities for safety supervision, list of safety hidden dangers and supervision of major safety hidden dangers" as the starting point, established a long-term mechanism for hidden dangers investigation, tracking and rectification, and improved the hidden danger investigation account and investigation and rectification files.
On the other hand, it is necessary to make overall plans, adjust measures to local conditions, and take different rectification measures according to different hidden dangers or diseases. Start an emergency plan for four or five dangerous bridges, arrange special personnel to guard them 24 hours a day, and ensure the safe and smooth roads by quickly arranging inspection and maintenance, setting warning signs, implementing traffic control, and strengthening the unloading of insurance.
Safety inspection in flood season from June 26th to 28th in work briefing, XX County Safety Supervision Bureau, together with the township safety supervision station where the non-coal mines are located, conducted a three-day special safety inspection for all non-coal mines in the county during flood season, requiring enterprise leaders to strengthen safety production from four aspects.
Strengthen ideological understanding
All enterprises are required to fully understand that it is the top priority of non-coal mines to do a good job in safe production in flood season, make unified arrangements, improve various flood control management systems, implement flood control safety responsibilities and preventive measures, and ensure clear tasks, responsibilities to people and measures in place.
Strengthen publicity and education
Mining enterprises are required to carry out mine safety knowledge education, especially the "three defenses" safety publicity and education in flood season. Through targeted publicity and popularization of mine rainy season safety knowledge, enterprise managers and employees are familiar with safety knowledge in production and life, enhance safety awareness and prevent safety accidents.
Strengthen safety inspection
All enterprises are required to comprehensively carry out the investigation and management of safety hazards in non-coal mines in flood season, and in accordance with the requirements of "inspection before rain, inspection in rain and verification after rain", especially intensify the investigation of key parts and key links such as stope slopes, staff quarters and electrical equipment.
Strengthen emergency duty
All enterprises are required to strictly implement the 24-hour duty system for personnel on duty during flood season. The main person in charge of the enterprise and the safety management personnel should keep the communication smooth, ensure the timely detection of dangerous situations, timely treatment, timely reporting and timely and effective disposal, and strictly implement the work system of evacuating people in extreme weather.
In order to draw lessons from the mountain collapse accident in XX County, Sichuan Province, and do a good job in safety production in flood season, on the morning of June 24th, Yi, deputy director of the Municipal Transportation Bureau, Pan Yongjun, chief engineer and deputy researcher led responsible comrades of relevant departments to conduct safety inspection in flood season on Daye Tuannao temporary passenger station, reservoir, Yangxin Village ferry and related roads and bridges.
This inspection * * * found 14 security risks and problems. In view of the existing security risks and problems, the Municipal Transportation Bureau issued a notice of assignment to the relevant responsible units, ordering them to promptly urge rectification. Those that can be rectified immediately shall be rectified immediately. If it is difficult to complete the rectification at one time, it is necessary to formulate a rectification plan and implement measures, responsibilities, funds, time limits and plans.
Especially for highway bridges with hidden dangers, all responsible units are required to strengthen the inspection of hidden danger sections and set up relevant warning signs and simple protective facilities before the rectification of related hidden dangers. In case of extreme weather such as strong wind and rainstorm, road officials should be arranged to be on duty at the scene to divert traffic and avoid traffic accidents.
It is easy to ask the transportation industry management department to seriously learn from the lessons of the mountain collapse accident in XX County, Sichuan Province, attach great importance to the work of safety in production during the flood season, draw inferences from other countries, quickly and comprehensively carry out the investigation and treatment of national and provincial trunk lines, roads leading to tourist areas (scenic spots), rural roads, mountain roads, projects under construction and urban waterways, strengthen inspection and monitoring, and strictly implement safety precautions. At the same time, it is necessary to strengthen the duty on duty during the flood season, strictly implement the system of leading cadres on duty and 24-hour duty, and report the danger in a timely and accurate manner according to regulations.
In order to implement the spirit of the city's flood control work conference and do a good job in preventing potential safety hazards caused by heavy rainfall, our bureau attaches great importance to strengthening environmental supervision during the flood season, putting the resettlement of the affected people in the first place in all work, and acting early and implementing it quickly.
The first is to strengthen environmental supervision in flood season.
On June 19, Yuan Ren led ten cadres and workers to lichuan county to guide flood control and disaster relief and environmental supervision during flood season. More than 200,000 poultry died in a large-scale farm in Zhuokou Town, lichuan county due to flash floods. On-site guidance was given to deal with the dead chickens after the disaster, and the harmless landfill address was determined to prevent environmental pollution accidents. In view of this post-disaster event, the lichuan county ceramic enterprises with potential safety hazards were investigated by analogy. During the investigation, the surrounding water environment pollution caused by excessive sewage discharge of Jiangxi Wuyi Ceramic Co., Ltd. was treated, and it was ordered to immediately stop production and rectify, and pollution control measures were implemented to ensure the water environment safety in flood season. Start the environmental monitoring emergency plan in time, carry out emergency monitoring on the water quality of drinking water sources and flood-stricken areas in various places, and provide water quality monitoring reports in time, which laid a solid foundation for ensuring the safety of drinking water quality and doing a good job in water environmental protection in flood-stricken areas.
The second is to strictly deploy the resettlement work for the affected people.
At 9: 00 p.m. on June 2 1 day, Yuan Renmin, the director of the school, immediately led 16 cadres and workers to the Xiaoqiao temporary headquarters for flood control and disaster relief to accept the task. According to the arrangement, our bureau is responsible for the resettlement of ten small affected people in Linchuan. Our bureau immediately contacted President Linchuan and the leaders of Linchuan District Civil Affairs Bureau, and rushed to the resettlement sites of ten small affected people in Linchuan for coordinated deployment until dawn. At 7: 20 on the 22nd, members of the leading group of the Bureau and heads of various departments held a meeting in Linchuan Shixiao to mobilize and deploy the resettlement work for the affected people, implement the responsible leadership, arrange the personnel on duty, and deploy matters related to the resettlement of the affected people.
June 23rd is the day when the affected people are resettled. At 8: 00 a.m., Yuan Renmin, director of the Bureau, and Zou Degui, secretary of the Party Committee of the Bureau, held a coordination meeting of the heads of health, defense, public security and other departments in Linchuan to clarify the work responsibilities of each unit. All the cadres of the Municipal Environmental Protection Bureau are dispatched, and the members of the bureau leadership team take the lead and are on duty 24 hours a day. By 8 o'clock in the evening, 47 classrooms were arranged and temporary bathrooms were installed to provide bathing services for the affected people. Through us, we will convey the concern of the party and the government for the victims to the masses and do our best to do all kinds of services.
- Related articles
- Did you describe the beauty of mountains and water? Please tell me.
- How about getting married on a rainy day?
- The best tourist route for six-day tour in Qinghai
- Lu Xun's personal profile and his articles.
- What is the reason for unexplained pain in the knee joint? How to alleviate it?
- Is Guangzhou Changlong Water Park open in rainy days?
- The omen of sunny weather in Tomb-Sweeping Day
- Hometown of Mudan Heze, Shandong Province
- The weather forecast often says that it rained กมกม mm somewhere. What does this millimeter of rainfall mean?
- Komori's Island Resources What islands can share all the resources?