The emergency plan should form a complete document system. Usually, a complete enterprise-level emergency plan consists of four parts: the overall plan, program documents, instructions and records. Next, I will bring you the flood control plan for the rainstorm in 2022. I hope you like it!

Flood control plan for rainstorm in 2022 1

1, use

Respond to possible special natural disasters, ensure the normal treatment of urban sewage and ensure the safety of the company's property and personnel.

2. Scope of application

This scheme is suitable for the control process of sewage treatment during rainstorm and flood.

3. Responsibility

In order to strengthen the leadership of flood control emergency work, a leading group for flood control emergency work in the factory was established.

4, the flood season on duty

According to the warning level of rainstorm and flood, different administrative duty systems are arranged, and all relevant departments arrange emergency repair personnel to prepare for flood control and flood fighting. Those who are absent without reason will be held accountable. The leading group for flood control and emergency work should do a good job in logistics support according to different duty arrangements.

During flood control and flood fighting, in order to ensure the smooth flow of information, relevant leaders and responsible persons must keep their mobile phones on for 24 hours.

During flood control and flood fighting, the specific duty arrangements are as follows:

In case of blue warning, be on duty according to the normal management system of our factory;

In case of yellow warning, in addition to the normal personnel on duty, the process laboratory department should have one person on duty on rest days and at night;

In the case of orange warning, except the normal personnel on duty on rest days and at night, the operation and maintenance personnel are on duty 1 person, and the flood control and flood fighting team is in place;

During the red warning period, all members of the flood control emergency team were on duty, and the flood control and flood fighting teams were in place.

5, management regulations

5. 1 preparation stage

5. 1.65438+

5. 1.2 Before the rainstorm and flood season come, the emergency repair personnel should repair and maintain all emergency repair equipment to make it in a good standby state.

5. 1.3 Before the arrival of rainstorm and flood, the equipment use department shall inspect the sewage treatment facilities under its jurisdiction to ensure that they are in good condition and have inspection records to check.

5. 1.4 it is necessary to know the weather change trend in time through the forecast of the meteorological station, and implement the flood control plan in time according to the requirements of the superior.

5. 1.5 Before the arrival of rainstorm and flood, all departments should close doors and windows and check whether there are potential safety hazards in indoor hanging objects and fixtures.

5. 1.6 Reserve necessary flood control and disaster relief materials and allocate them reasonably according to the principle of graded responsibility. Reserve a certain amount of emergency materials in key parts of flood control and flood control for emergency use.

5. 1.7 communication preparation, make full use of the internal telephone network and social communication public network in the factory to ensure that the flood control and flood fighting communication system is intact and smooth, and the command and dispatch instructions are transmitted in time.

5.2 Process control

5.2. 1 When there is a large amount of water in flood season and the water level of the collecting well is high, start all pumps to run.

5.2.2 The process laboratory adjusts the process operation plan in flood season according to the actual situation; Adjust the operation conditions in time during flood season, treat as much sewage as possible and reduce the discharge when the water quantity is large and the influent quality is weak, so as to ensure that the total effluent reaches the discharge standard.

5.2.3 During the flood season, the operation team will strengthen the inspection and monitoring of key equipment and parts such as inlet and outlet pumps, inlet and outlet gates of reaction tanks, power transformation and distribution stations, and keep records of equipment operation; When faults and other abnormal conditions are found, they should report to the equipment department or notify the leading group for flood control in time. Strengthen on-site inspection, especially structures, to prevent falling objects in windy weather.

5.2.4 Before the flood season, the machine maintenance class will arrange the inspection and maintenance of key production and operation equipment and substations, and do a good job of rain protection for outdoor equipment. And timely check the grounding situation of machinery and equipment in the whole plant, and timely rectify the facilities with potential safety hazards.

5.2.5 According to the weather forecast, organize operators to check all the equipment in advance to ensure that it is in good condition, and organize forces to dredge the rainwater pipes in the factory area to ensure smooth flow; Timely and effective release of early warning information.

5.2.6 In case of sudden rain, all posts should close the doors and windows to prevent rainwater from flowing in and affecting the equipment operation. The production operation team will increase the number of pumps and reduce the water level of the collecting well until it is full. When going out to patrol, be sure to work in pairs and pay attention to anti-skid. Substation personnel on duty should check whether the lightning protection device works in time; Factory maintenance team members and vehicles should be on call and ready to deal with unexpected accidents at any time.

5.2.7 If the instantaneous flow is too high and the structures are overloaded, you should immediately contact the superior department, and with the consent of the superior department, open the override valve of the primary sedimentation tank to discharge the sewage urgently, so as to ensure the normal operation of the structures and process production of the whole plant.

5.3 Emergency

5.3. 1 If the power outage process fails to operate normally, the personnel on duty should immediately report to the relevant leaders, and stick to their posts and wait for instructions from the leaders.

5.3.2 When rainstorm and flood cause property losses and casualties, the personnel on duty shall immediately report to the relevant leaders and carry out relevant rescue work within their functions and powers.

5.4 Flood control and later flood control

5.4. 1 After the rainstorm and flood, the laboratory personnel should increase the frequency of water quality inspection in and out of the laboratory.

5.4.2 Repair the damage of equipment and facilities caused by rainstorm and flood, and ensure the normal operation of all equipment;

6. Rescue and disaster relief

After the occurrence of a major danger, the leading group for flood control and emergency work should quickly monitor and track according to the nature of the incident, and immediately contact the relevant departments.

The leading group for flood control and emergency work should immediately put forward an emergency treatment plan according to the specific circumstances of the incident for the company or the higher authorities or the local government to direct and make decisions.

The leading group for flood control and emergency work should quickly mobilize the resources and strength of the department and provide technical support; Organize flood control and thunderstorm resistance personnel to quickly carry out on-site disposal or rescue work.

When dealing with major dangers, it is necessary to have unified command, division of responsibilities, carry out their duties, unite and cooperate, respond quickly, deal with them efficiently, and minimize losses.

7, safety protection and medical rescue

The leading group for flood control and emergency work should attach great importance to the safety of emergency personnel, and mobilize and reserve necessary protective equipment, disinfection drugs, standby power supply and necessary equipment for rescuing the wounded. So that it can be used at any time.

The entry and exit of rescue personnel shall be decided by the leading group for flood control and emergency work as appropriate. Before emergency personnel enter the threatened site, they should take protective measures to ensure their own safety.

The leading group for flood control and emergency work shall, according to the instructions of the local government and the higher-level leading institutions, issue a notice in time to prevent people and animals from entering dangerous areas.

8. Mobilization and participation of social forces

After the disaster occurs, the leading group for flood control emergency work can report to the local government for approval according to the nature and degree of harm of the incident, and implement emergency control on key areas and key parts to prevent the further expansion of the situation and its harm; When necessary, the local people's government can widely mobilize social forces to actively participate in handling emergencies.

9. The emergency is over

When the disaster situation is effectively controlled, the leading group for flood control and emergency work can announce the end of emergency response according to the actual situation.

Materials, equipment, means of transport, etc. In accordance with the provisions of the relevant emergency, it shall return to its original place in time after the end of the emergency. After the emergency disposal, it is necessary to restore the normal life, production and work order in time, repair the infrastructure damaged by water, and minimize the losses and impacts caused by emergencies.

Response Plan for Storm Flood Control in 2022 II

Defending against bad weather is the focus of school safety work. In order to effectively protect the life and property safety of teachers and students in our school during the rainstorm, hail, lightning and other weather, ensure that the ideas, preventive plans and responsibilities are in place, and minimize the possible losses caused by the arrival of rainstorm, hail and lightning, this plan is formulated according to the requirements of Siqu Town Education Management Middle School and the actual situation of our school.

I. Scope of application of this scheme

Abnormal weather such as rainstorm, hail, thunder and lightning.

Second, the work objectives

Pay attention to the weather forecast. Before predicting the arrival of rainstorm, hail and lightning that affect our town, we should implement an effective prevention plan in combination with the requirements of our superiors. The primary goal is to ensure the safety of personnel and minimize the possible losses caused by the arrival of rainstorm, hail and lightning.

Third, organization

Set up the leader of the leading group for preventing bad weather:

Deputy team leader:

Members:

Four. Work arrangement and scheme during the period of defending against bad weather

(1) pre-inspection work

1. The person in charge of the school committee should regularly organize personnel to carry out strict and meticulous inspection on the work in charge, leaving no dead ends and fixing problems in time. Every class should do a good job of class investigation every day, keep abreast of the living conditions of students' families, especially those living in remote areas, keep in touch with parents, and educate students to improve their awareness of disaster prevention.

2. The telephone number of the school office, the telephone number of the members of the school committee and the telephone number of the class teacher should be kept open; The logistics department should comprehensively inspect the school's electricity facilities and lines to ensure the safety of electricity use;

The academic affairs office should organize professionals to inspect the doors, windows and hanging objects of the school teaching building and comprehensive building to eliminate hidden dangers in time; The Youth League Committee should dredge and clean up the sewage, light and dark ditches and sludge sundries on the flat roof of the whole school to ensure smooth drainage;

Teachers should check the hanging objects of their bedroom doors and windows to eliminate hidden dangers in time; Boarding students should check the hanging objects of the doors and windows of the students' dormitory to eliminate hidden dangers in time; Teacher An Xiangyang should check the hanging objects on the doors and windows of the canteen to eliminate hidden dangers in time. Security personnel should check the hanging objects in the doors and windows of the school gate and the guard room, and eliminate hidden dangers in time when found; The Political and Educational Affairs Office should investigate and supervise the school walls and landslide-prone areas.

3. Once each shift is in danger, it is necessary to evacuate to a safe area in an organized and rapid manner according to the escape drill route. Regularly educate students in class to prevent bad weather, and enhance their awareness of prevention and self-help and self-care ability.

4. In order to prevent the coming of rainstorm, hail and thunder, all teachers are members of the disaster relief and rescue team, defending against bad weather and being on standby at any time, ready to deal with emergencies at any time.

(2), duty, reporting system

When rainstorm, hail and lightning come, all duty rooms and patrols must ensure that the personnel on duty are on duty 24 hours a day. School leaders and personnel on duty should ensure smooth communication and keep communication tools smooth.

When the disaster happens, school leaders, patrol personnel and personnel on duty should grasp the disaster situation in time, report the details to their superiors in the shortest time and truthfully report the losses caused by the disaster.

(3), logistics support work

Do a good job of storing all kinds of goods before the arrival of rainstorm, hail and lightning. Spare rain gear, flashlight and other urgently needed items, and provide logistical support. And establish contact with Siqu town health center, safety supervision department and other units to ensure timely rescue.

Verb (abbreviation for verb) emergency action

1. Before the arrival of rainstorm, hail and lightning, the school guard room and dormitory began to implement the 24-hour duty system, and all members of the leading group turned on their computers 24 hours a day to pay close attention to the movements of rainstorm, hail and lightning. Check the doors and windows, awnings, facilities, wire and electrical equipment, school construction sites and other facilities in dangerous areas, eliminate dangerous situations, and reinforce and dismantle facilities that may have accidents.

2. Stop all outdoor activities of the school as soon as rainstorm, hail and thunder arrive.

3. When rainstorm, hail and thunder come, organize students in dangerous environment to move urgently, pay attention to safety, move things outside the classroom into the classroom, and close all the doors and windows of the school. Prevent the wire from being scratched, causing short circuit and causing fire or electric shock to indoor personnel. At the same time, it is also necessary to prevent accidents such as lightning strikes.

4. After the rainstorm, hail and lightning come, all school personnel are not allowed to go out to avoid accidents.

5, after the rainstorm, hail, lightning, should be timely rescue the wounded, the school fully committed to disaster relief and self-help, and timely report the disaster to the higher authorities. Ensure the normal teaching order in the school.

6. In case of rainstorm, hail and thunder, teachers should organize students to move in a dangerous environment, pay attention to safety and close all doors and windows in the classroom. Prevent the wire from being scratched, causing short circuit and causing fire or electric shock to indoor personnel. At the same time, it is necessary to prevent accidents such as lightning strikes, postpone classes in time, and ensure the safety of students.

Dealing with bad weather is a comprehensive and arduous task, and all relevant personnel must cooperate with each other, support each other and do their jobs well. Check the work within the scope of duties, obey the command of the leading group for preventing bad weather at any time, and be on call. Qi Xin will work together and cooperate with each other to do a good job in disaster relief.

2022 Storm Flood Control Response Plan 3

I. Purpose

In order to establish and improve the early warning and emergency response system for public emergencies in property management, and to ensure that the property company can effectively and orderly do a good job in flood control and disaster relief in the event of major floods, this plan is formulated in accordance with the requirements of the higher authorities and company leaders, combined with the actual situation of our company, in order to implement the emergency rescue and disaster relief work and ensure the safe flood season this year.

Second, the guiding ideology

Conscientiously implement the spirit of the national, city and county flood control work conference, actively defend against flood disasters, implement the working principle of "safety first, prevention first, standing by and doing all-out rescue", and build a harmonious society; Unified leadership, careful deployment, coordinated action, hierarchical management, clear division of labor, scientific scheduling, further strengthen flood control responsibility, earnestly grasp all aspects of flood control work, improve and implement various flood control plans, strengthen flood monitoring and early warning and forecasting, improve the comprehensive ability of flood control and waterlogging prevention, and minimize the losses caused by flood disasters to families and companies.

Three. primary mission

1, implement the responsibility system. Conscientiously implement the flood control responsibility system with the project manager responsibility system as the main content, improve the rules and regulations, clarify the job responsibilities, and implement the responsibilities to people.

2, organize the formulation and implementation of flood control emergency plan. Combined with the actual situation of various departments and projects, fully foresee possible problems, and scientifically and reasonably formulate emergency plans for flood control and flood fighting.

3, all departments and projects of flood control materials in place, do enough flood control materials, do a fixed position, the specialist is responsible for the management.

4, each project do someone on duty 24 hours a day, and there is a leadership shift, the project manager responsibility system. Ensure the smooth flow of information and properly handle emergencies.

Four, leadership and command and rescue and disaster relief agencies

1, set up a flood control working group.

Conductor:

Deputy commander:

Members:

2. Establish the company's flood prevention and rescue commando.

Each project will set up its own rescue commando team, with each project manager (or order maintenance supervisor) as the captain.

Verb (abbreviation for verb) main responsibility

1, flood control work leading group responsibilities

(1) Quickly receive and convey instructions from flood control departments and superior leaders on flood control and disaster relief.

(2) deploy and direct the implementation of flood control and flood relief operations. In case of danger, all emergency commandos are under the command of the leading group for flood control.

(3) to master the basic situation of flood control and flood fighting work in each unit, understand the water situation and report it in time.

(4) Perform other tasks assigned by superiors.

2, flood control and emergency commandos responsibilities

(1) Receiving and reporting flood control and disaster relief.

(2) directly participate in flood control and disaster relief operations.

(3) Coordinate the resettlement and transportation of affected households.

(4) Complete other tasks assigned by the company's leading group for flood control.

Preparation of intransitive verbs (refer to the actual situation of each project)

1, check and clean the ground and roof drains in advance, clean septic tanks and sewage wells, and check the interface between the drainage supervisor and the municipal pipe network to ensure smooth flow.

2. Check the sewage pump to ensure that the sewage pump in important positions (generator room, pump room and power distribution room) can run automatically.

3. Repair the standby generator and control circuit to ensure the safety and reliability of emergency power supply.

4, check the flashlight in good condition, check the equipment room emergency lighting.

5. Check the lightning protection system of the community.

6. Check the facade of the external wall, notify the residents, arrange the balcony and roof garden, and clean up the high-altitude bent frame and canopy.

7. Prune the dead branches of big trees and branches with serious pests in the community.

8. Determine the evacuation route and location of emergency vehicles and personnel.

9, the project fixed personnel, regularly watch the local weather forecast every day, and timely report important information to the project leader.

Seven. Key locations, equipment and facilities of the project (refer to the actual situation of each project)

1. Focus on monitoring the equipment and facilities (basement, elevator shaft) below the horizontal elevation of the computer room and residential area.

2, office computers and monitoring host, road brake equipment and other public electrical equipment.

Eight, material preparation (each project with reference to the actual situation)

1. Prepare spare water pump, bucket, broom and towel.

2. Prepare necessary rain gear, such as umbrella, rain boots and raincoat.

3. Emergency lighting such as flashlights and emergency lights.

4. Emergency communication such as walkie-talkie.

5, medical care: tourniquet, anti-inflammatory drugs, iodine, band-aid.

6. Safety belts, safety ropes, shovels and other emergency tools and materials.

7. Prepare the necessary funds.

8. Emergency support vehicles.

Nine, emergency measures after the flood

1, general flood emergency

(1) Strengthen communication with county flood control departments and strengthen flood monitoring and forecasting.

(2) According to the actual situation of each unit of our company, put forward flood control requirements for all departments and projects, and evacuate residents in an organized manner.

(3) Take measures to ensure smooth communication of flood control system.

(4) Supervise the preparations for emergency rescue and disaster relief, and check the implementation.

(5) According to the flood trend of flood control departments, strengthen flood prevention publicity and education for residents, quell rumors, stabilize people's hearts, and maintain normal production and living order.

2, major flood emergency

(1) After receiving the emergency notice of the major flood from the superior leaders, the flood control and disaster relief commandos of various projects involved in the flood quickly concentrated and put them into the flood control and emergency rescue work.

(2) Organize forces to do a good job in the evacuation and resettlement of residents and take favorable measures to ensure the basic living conditions of residents as much as possible.

(3) Organize relevant personnel to maintain public order and prevent people from making trouble.

(4) Understand the disaster situation, do a good job in propaganda, quell rumors and misinformation, and maintain social stability.

Specific emergency measures shall be implemented according to the above-mentioned process, combined with the actual situation of the project, and in accordance with the flood control emergency work plan of the project.

X. Summary and reporting of information

According to their respective responsibilities, the Project Flood Control Headquarters is responsible for collecting, sorting out and studying the analysis and summary of possible flood control information in this area, and reporting the situation to the company's competent leaders in a timely manner according to the principles of early discovery, early reporting and early disposal. Any individual has the right and obligation to report all kinds of flood control emergencies and possible hidden dangers to the company office, and has the right to report the negligence and improper handling of relevant departments. The submission and processing of flood control information shall follow the following principles:

1. Important information should be reported immediately. For information that is difficult to accurately grasp due to objective reasons, we should report the basic situation in time, and at the same time quickly understand the situation and add details.

2, general information according to the project management authority, submitted to the flood control responsible person of each project.

3. The company's flood control working group shall report immediately after receiving reports on major floods, work, insurance and disasters.

XI。 others

When encountering major, urgent and unexpected events or situations involving residents' normal work, operation and life order, cooperate with the customer service centers of various projects to verbally inform nearby customers and do a good job of appeasing and explaining customers.

Response Plan for Storm Flood Control in 2022 4

According to the actual situation of our hotel, this plan is specially formulated for flood control in the rainy season of 20__ _:

First, the overall goal of flood control work:

In accordance with the working principle of "safety first, constant vigilance, prevention first and all-out rescue", the responsibility system for flood control is earnestly implemented to ensure the safety of hotel personnel and property and the normal work of the hotel.

Second, the working principle

The principle of "unified management, unified coordination, unified deployment, rapid response, scientific response and graded implementation" is implemented in the flood control and emergency rescue work of hotels.

Three. Organizational structure and responsibilities

1, the hotel set up a leading group for flood control and emergency rescue:

Team leader:

Responsibilities: Responsible for flood control and emergency rescue, and issuing instructions to start the hotel flood control plan.

deputy group leader

Responsibilities: Responsible for the implementation of the hotel plan and the organization, coordination and command of the hotel flood control.

Members:

Responsibilities: Cooperate with the deputy team leader to be responsible for flood control and emergency rescue work of various departments.

Under the disaster relief team, material supply team:

Disaster relief and rescue team:

Captain: Zhang Xiaoqi.

Captain: Li Hongsheng.

Team members:

Material supply team

Captain:

Team members:

2. Hotel flood telephone 24-hour small duty system:

Duty phone:

Work of the personnel on duty: according to the manager's duty table of the month.

Fourth, the hotel basement rescue personnel evacuation plan.

(1) During the flood season, all units should strengthen patrol on duty, and the personnel on duty must stick to their posts, do their duty and keep communication open for 24 hours. If there is any danger such as rainstorm or water accumulation in the basement, they should immediately report to the hotel flood control headquarters and organize disaster relief teams to rescue them.

(2) The disaster relief team must be ready to participate in flood control and disaster relief work at any time.

(3) When there is water leakage in the basement and it tends to expand, the staff dormitory must be evacuated immediately. The evacuation passage is directly connected to the second and third floors of the restaurant through the stairs at the entrance of the staff restaurant. The key to the evacuation passage is held by Director Xu and the manager on duty respectively. When the hotel personnel evacuation plan is started, the manager on duty should open the evacuation passage at the first time to ensure the safety of employees to evacuate from the disaster area.

(4) The manager on duty must do a good job in strict management of the key to the safe evacuation passage, and make a careful handover.

(5) When evacuating employees, the manager on duty shall ensure that the evacuation is carried out safely and orderly, and there shall be no confusion. Male employees are always ready to voluntarily assist in emergency rescue while ensuring personal safety.

(6) The hotel shall organize at least one flood control exercise.

Verb (abbreviation of verb) and other problems that should be paid attention to

(1) Ensure that employees' living rooms are watertight and free from water accumulation.

(2) Pay special attention to environmental sanitation and insist on daily fly killing and disinfection.

(3) Do a good job in distributing medicines for heatstroke prevention and cooling, and arrange your own time reasonably to ensure that no epidemic, food poisoning and heatstroke will occur.

(4) The emergency plan for hotel flood control should be supplemented and revised in time according to the requirements of superiors.

Response Plan for Storm Flood Control in 2022 5

I. Organizational structure and responsibilities

The hotel set up the emergency headquarters for flood prevention and typhoon prevention. When the typhoon comes, all members of the headquarters must immediately do a good job in flood prevention and typhoon prevention and hotel duty. The organization is as follows:

Commander in chief:

Deputy commander:

Member unit:

Second, the typhoon prevention program

(1) Pre-typhoon self-inspection preparation

1. Front hall: collect decorations such as banners, lanterns and POP bulletin boards at the door; Put a typhoon information bulletin board in the lobby or elevator entrance, and prepare a typhoon reminder card to the housekeeping department for distribution into the room; Prepare umbrellas and rain gear. Every employee at the front desk should know the typhoon information, answer the guests' inquiries in time, and prepare the emergency lighting at the front desk. The lobby assistant should set up a post in the lobby, do a good job of customer inquiry, pay attention to the situation at the door and lobby and report in time to ensure the normal business order of the lobby.

2. Housekeeping Department, Catering Department and Finance Department: Check and close the doors and windows of all rooms, boxes, walkways and corridors; Do a good job of typhoon prevention for guests, and inform housekeeping department to equip rooms with typhoon warning signs; Prepare emergency lighting;

3. Operator: responsible for understanding the typhoon situation and reporting to hotel leaders and relevant departments in time; Prepare emergency lighting and walkie-talkies, check whether the standby power supply of the switchboard works normally, provide emergency service for power failure under the guidance of the department manager, and do a good job in guest inquiry service.

4. All departments should prepare for the loss of linen 1 day in advance in case of emergency.

5. The Engineering Department will conduct a comprehensive inspection of the hotel periphery, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes and wooden stakes. And temporarily dismantle the unstable store. Check the important parts such as the underground electrical room, strengthen the hotel door, and cut off the circuit that may cause fire due to short circuit. The pool should be filled with water to ensure the normal supply of water, electricity and gas in the hotel, and sufficient sandbags should be prepared.

6. The comprehensive office is responsible for conveying typhoon information to all employees of all departments, and arranging the heads of all departments to stay in the store for duty.

7. The security department informs the dormitory security guards to be diligent, and cooperates with the engineering department to check whether the sewers and ditches in key parts such as the periphery and roof of the hotel are unobstructed, and prepare lighting appliances, rain boots and raincoats, helmets, flashlights and emergency lights.

(II) Re-inspection: The heads of the General Office, Engineering Department and Security Department shall re-inspect the preparations of all departments according to the above provisions.

(3) When the wind is strong, emergency procedures should be started:

1. The heads of the security department and the engineering department should stay in the hotel, deal with sudden dangers at any time, and ensure that there are enough manpower and material resources to do emergency maintenance and remedial work.

2. If there is water seepage in guest rooms, boxes, linen, drinks and food warehouses, subordinate departments should immediately transfer the contents of the rooms to a safe place, and the engineering department should do a good job of plugging and drainage.

3. The rainwater at the front door may flow backward into the lobby, and the security department and the engineering department will pile sandbags at the door to prevent the inflow. PA class is responsible for sending additional personnel to clean up the accumulated water.

4. Rain from the back door may flow back into the employee elevator. The security department and the engineering department will pile sandbags at the back door to prevent the inflow. The security guard at the back door post is responsible for removing stagnant water. If the rainwater has flowed backward into the elevator, the engineering department should immediately control the elevator to the floor above 1F, and it is forbidden to let the elevator run to-1f-2f.

5. When the wind is strong, the front door and back door should be reinforced with wooden plugs and boards to prevent the glass door from being damaged by the wind. When strengthening, some glass doors should be kept open properly to reduce the wind resistance to the glass doors. The front door glass should be the responsibility of the bellboy and the foreman of the security department. The rear door glass is guarded by the security guard at the rear door post.

6. When the wind is strong, the porter of the past security guard should pay attention to falling objects and guide the guests to park their vehicles in the underground garage. They should wear safety helmets when necessary. The desk lamp and flowerpot placed at the front desk should be put away in the front hall to avoid being blown down by the wind.

7, if there is water in the elevator, the engineering department should immediately start the drainage system, eliminate water, so as to avoid if the wind is strong and the passenger elevator can't run, the dining room screen should be pushed to the elevator.

8. In case of power failure, the Engineering Department will immediately contact the Property Office to generate electricity and restore lighting. The security department maintains the security order of the hotel during the power failure. In case of power failure, the restaurant manager is responsible for taking care of the cashier in place, and the cashier at the front desk is the responsibility of Qianmen Gang and Security Department 02 or 0 1. The assistant manager of the lobby, 0 1 02, should provide elevator service, ask if there are any detained guests and do a good job of comforting them. Floor staff and department managers should be dispersed to all floors and restaurants to explain and appease the guests.

9. When the drainage ditch is blocked, the Engineering Department and the Security Department will send someone to dredge it. Dredging personnel should pay attention to their own safety and must wear safety helmets. If necessary, you should wear a safety rope, and two people should cooperate with each other in tandem. Pay attention to whether the electrical equipment on the roof equipment floor has leakage.

10, when the wind is particularly strong, the office should be responsible for informing the dormitory staff not to go out, and the staff living outside the store should arrange to stay in the hotel. The heads of offices and departments should discourage off-duty personnel from leaving the hotel, and the office should make accommodation arrangements for stranded personnel.

1 1. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of various departments in time. If airports, highways and bridges are closed, they should report to the front hall in time, and the front hall should inform hotel guests in time.

12. The executive general manager of the hotel, the manager of the engineering department and the manager of the security department should stay in the hotel to make emergency preparations. Whether other department managers stay in the hotel or not shall be subject to the hotel arrangement, and if they leave the hotel, they shall be reported to the hotel administrative director for approval.

(four) after the typhoon caused hotel losses, all departments should summarize and report the losses within two days.