Traditional Culture Encyclopedia - Weather forecast - How to deal with the pollution caused by coal gangue accumulation?
How to deal with the pollution caused by coal gangue accumulation?
General situation of Dong Qing coal mine field, gangue stock and collapse influence range
Brief introduction of Dong Qing coal mine
Dongqing Mine is located at the junction of Suixi County and Guoyang County in Anhui Province, and its administrative division belongs to Suixi County (see figure 1- 1). The mine has good resource conditions, abundant reserves and superior construction conditions. It is a pair of large mines of 10 pair encouraged by the state in the overall planning of Huaibei mining area.
Large modern mine. Dong Qing Mine adopts three levels of mining, one is -620m, the other is -920m, and the third level is-1200m. Mine design service life is 68.7 years.
Figure 1- 1 Geographical Location of Dong Qing Coal Mine
Dong Qing Coal Mine and Coal Preparation Plant are invested and constructed by Huaibei Mining Group Co., Ltd., and Dong Qing Coal Mine is a new coal resource development project with a designed raw coal production capacity of1.8mt/a; The supporting Kengkou Coal Preparation Plant is a newly-built raw coal washing and processing project, and the designed raw coal preparation capacity is1.8mt/a/a. 。
1.2 general situation of gangue hill reserves and annual output of gangue
Since the establishment of Youdong Coal Mine in 2004, the gangue produced by mining has not been effectively treated. At present, the total amount of coal gangue in Dong Qing is large, the height of coal gangue hill is high, and the area of coal gangue hill is increasing year by year (see table 1- 1 and figure 1). These unfavorable factors may cause secondary disasters such as spontaneous combustion and collapse of waste hills. In addition, according to the statistics of driving footage and pre-production of gangue in recent years from 20 12 to 20 16 released by the group company (see table 2), the average annual output of coal roadway and rock roadway in our mine is about 458,000 tons. In addition, according to 20% of the annual output, the fully mechanized mining output of Dongqing Mine is180,000 tons/year. This further aggravates the seriousness and urgency of waste rock treatment in our mine.
1.3 Overview of the influence range of collapse
After the mining of the whole mine field in Dong Qing Coal Mine, the subsidence area is 54.20km2, of which the accumulated water area (subsidence more than 2m) is 20.32 km2, and the maximum subsidence depth is10.8m. According to the maximum predicted value of surface deformation, the horizontal tensile deformation caused by coal mining in Dong Qing Coal Mine is small, and generally discontinuous deformation such as cracks will not occur. See table 1-3 for the maximum subsidence value, maximum dip angle value, maximum curvature value, maximum horizontal movement value and maximum horizontal deformation value of the surface after mining in the first mining area and the whole mine field.
2. Analysis of advanced regeneration methods
1 Advance reclamation, also known as pre-discharge gangue filling reclamation technology, is to take out the topsoil and pile it around the area where the surface subsidence is expected above the goaf during the well construction and the initial stage of production. According to the expected subsidence contour map, the gangue is discharged in advance and filled to a predetermined height. When the settlement is consistent with the surface elevation, the topsoil around the pile is pushed to the gangue layer to form arable land, thus realizing the goal of harmless treatment and disposal of gangue.
Concrete construction process and effect analysis of advanced reclamation in 82 mining area
2. 1. 182 Introduction of the first mining area
The No.82 mining area in Dongqing Mine reaches the -585m contour line in the north, the fault f 1 1 in the east, the faults f6 and fs96 in the west and the faults FS11and fs98 in the south, with an area of about1./kloc. The ground is flat, there is no big river passing by, but artificial ditches are vertical and horizontal. The villages on the ground include Luo Zhuang, Chenyoufang, Liucaiyuan, Xinzhuang and Lixiao Temple. In the process of mining, the ground may form a subsidence area (see Table 2- 1). According to the underground comparison chart, the total recoverable thickness of fully mechanized mining faces in No.726, No.728, No.828, No.2 and No.3 in No.82 mining area is about 7.5-8.5m Through mining subsidence technology, the average subsidence depth of No.82 goaf is 5. 17m, and the estimated reclamation elevation is about 5-6m.
2. 1.2 specific construction process
Specific implementation stage: 1. According to the information provided by the survey and design unit of the production technology department, select the advanced reclamation area (first select the old village site area in the subsidence area); 2. First, the topsoil should be stripped about 1m, and the topsoil, subsoil and other stratum materials suitable for plant growth should be stored and utilized in a protective way, which can be used as soil for soil reconstruction in the reclamation of subsided land in priority; 3. Take measures to prevent leakage, and collect and discharge the water in the backfilling area of the gangue hill (2. Use geotextiles (multifunctional products with six functions of drainage, filtration, isolation, reinforcement, seepage prevention and protection) to prevent surface water and groundwater from leaching; 4. Transport the gangue to the backfill area, fill it evenly and tamp it by layers until the stacking height reaches the set height. 3. Introduce microorganisms into coal gangue waste to promote the generation of plants and rhizobia, thus promoting the rapid growth of plants and accelerating the weathering of solid waste into soil. After being fully exploited and stabilized, the advanced backfill area will be covered with soil (considering the factors such as soil tillage layer, crop species, soil erosion, etc., the thickness of the overlying soil on the reclaimed soil is greater than 600mm) and transformed into cultivated land supplementary land. Strive to form a "balance of occupation and compensation" situation of cultivated land-coal mining subsidence-comprehensive management-formation of new cultivated land-comprehensive utilization.
2.2 Solutions to problems left over from advanced reclamation projects.
Because the subsidence speed of the mined-out subsidence area is relatively slow, it will inevitably lead to the situation that the pre-discharged gangue is higher than the ground for a certain height in two or three years. In case of rainy weather, a large amount of gangue dripping water may pollute the surrounding farmland; If the accumulated gangue is not effectively reinforced, it may also lead to secondary geological disasters. In order to solve these problems, we can repair the drainage ditch around in time, solve the problem of wastewater discharge and reduce the impact on agricultural production activities. In the process of backfilling, in addition to strengthening the accumulated gangue, measures such as planting plants and covering the dam surface and slope should be taken to prevent dust, landslide and soil erosion. After the land subsidence is stabilized, this area will be leveled and repaired on a large scale, and it will become permanently available arable land.
3. Benefit analysis of early land reclamation
3. 1 Economic benefit
The coal produced by this mine was transported to the pre-subsidence area in time, which not only solved the problem of coal gangue stacking and land occupation, but also completed most of the subsequent land reclamation projects. On the other hand, the cost of land acquisition is generally several times more than the cost of reclamation, so reclaiming land in this way is not only conducive to the sustainable development of local agriculture, but also gives priority to solving the major problem of global coal gangue disposal, and at the same time saves a considerable amount of land acquisition costs for enterprises and greatly reduces the production cost of raw coal; And after the completion of land reclamation, the relevant state functional departments give subsidies and rewards to enterprises according to the scale and quality of reclamation, which shows that advanced reclamation not only solves the problem of gangue disposal, but also brings good economic benefits to enterprises.
3.2 Environmental and ecological benefits
The environmental benefits of advanced reclamation are obvious. If no advance reclamation is carried out, on the one hand, the abandoned mountain will occupy and pollute the land, on the other hand, the ground in the subsidence area will be broken due to cracks and landslides, and the soil erosion will be more serious, and the ecological environment of the mining area will suffer serious damage. Therefore, the reclamation of coal mine subsidence areas and waste hills under unified planning is essentially the most important part of the comprehensive environmental control project in mining areas. The application of coal gangue in the filling treatment of subsidence area not only makes the land resources destroyed by mining be reused, but also disposes of coal gangue, which not only beautifies the environment, but also restores the natural ecology of the mining area, and receives the dual benefits of resource development and environmental protection.
3.3 Analysis of social benefits
(1) has obviously improved the ecological environment of the mining area, reduced soil erosion and atmospheric dust caused by coal gangue accumulation, and provided a good ecological environment and living space for people engaged in production, management and life in the mining area.
(2) After land reclamation and improvement, the coal mining subsidence area has been transformed into nursery planting land, economic forest land and breeding pond, which has improved the land utilization level and the economic benefits are higher than the original cultivated land and grassland.
4. Conclusion
Whether on the theoretical basis or in the specific implementation process, the feasibility of the advanced reclamation scheme is worthy of recognition, which is of positive significance to solve the problem of coal gangue treatment in new mines. At the same time, the economic benefits, social benefits and ecological benefits after reclamation are unified.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:Comfortable copy of sunbathing by the window in winter (40 articles)
- Next article:Which is more accurate, rainbow weather or ink weather?
- Related articles
- This week's plan and weather are translated in English composition tape.
- Detailed data collection of satellite TV Chinese channel
- What is the process of website optimization? Please be more specific. What kind of work can be done appropriately?
- Is it appropriate to go to Vietnam in May? The main reason is the weather. It seems that the rainy season is coming in May. I don't know if it will rain every day, so I'm in a bad mood.
- The development course of Tissot
- The weather next Tuesday
- Is Grain Rain the last solar term in spring?
- Where is the dream-making unparalleled Zhuangniu?
- Weekly four-level weather: rainstorm
- What's the weather like in Moscow in September?