Summary of safety production month activities in flood season

Summary of Work Safety Month in Flood Season (5 selected articles)

Inadvertently, an activity ended. There must be many experiences worth sharing in this activity. You can record these feelings in the activity summary. So what kind of activity summary is appropriate? The following is a summary (5 selected articles) of the activities of safety production month in flood season compiled by me. Welcome to share.

Summary of Work Safety Month in Flood Season 1 According to the Notice of China Aluminum Company on Strengthening Work Safety in Flood Season, in order to further strengthen the management of work safety in flood season, prevent all kinds of safety accidents and ensure the safety of people's lives and property, the company earnestly carried out and implemented the work of work safety in flood season, and now summarizes the work of work safety in flood season as follows:

First, strengthen leadership and attach great importance to safe production in flood season.

The leaders of the company attach great importance to the work of safe production in flood season, and put the work of safe production in flood season in an important position. In view of the situation of safe production in flood season of the project department, they specially studied and formulated specific plans. According to the requirement of "one post and two responsibilities", a leading group for production safety in flood season with the main person in charge of the project department as the member was established. In view of disastrous extreme weather conditions, early deployment, early arrangement, early action and early prevention are required to ensure the effective implementation of various work measures and safe production in flood season.

The second is to do a good job in the investigation of hidden dangers in key links in flood season.

(a) the project department to carry out a comprehensive safety inspection, to check out the hidden dangers to register one by one, to focus on monitoring the existing hidden dangers.

(2) At the same time, targeted protective measures should be taken to effectively prevent all kinds of accidents and property losses caused by geological disasters and extreme weather.

(3) Strengthen the disaster prevention and protection work on the construction site, especially grasp the drainage, sloping and supporting conditions of underground operations such as deep foundation pits, pipe trenches (troughs), as well as the foundation stability and windproof devices of hoisting machinery. In case of extreme weather such as thunderstorms and strong winds, aerial work should be stopped as required.

Third, improve the emergency plan and implement preventive measures.

Each project department further strengthens the overall situation consciousness and responsibility consciousness, attaches great importance to the preparation and improvement of various plans to deal with natural disasters, sets up an emergency rescue work leading group, and implements preventive measures. In the project department, planned learning activities were carried out. Combined with the actual situation of the project, the key parts of flood control are inspected, and the flood control tasks in the next stage are determined according to the problems found. At the same time, earnestly implement the preparation of flood control materials and the formation of rescue teams, clarify the main responsible persons, conduct rescue drills in a timely manner, and enhance the ability to deal with emergencies.

Four, strengthen publicity and education, improve the national safety awareness.

All project departments actively carry out publicity and education on production safety in flood season, and widely publicize the knowledge of production safety in summer flood season by setting up publicity columns, posting publicity slogans, and issuing "disaster prevention cards" and "hedge cards" to employees and subcontractors, strengthen the understanding of all kinds of disasters that are prone to occur in flood season, and effectively improve the awareness of flood prevention and disaster prevention and the self-help ability of disaster prevention and mitigation.

Five, strengthen the duty scheduling and emergency handling.

(1) Earnestly implement the 24-hour duty system and regular notification system, establish and improve the disaster quick report system, and ensure the smooth reporting channels of emergency information.

(two) timely contact with the meteorological department, closely grasp the rain, and carefully analyze the weather situation.

(3) When there is a flood, the main leaders are on duty in person, grasp the dynamics, take the lead, and make decisions and command in place. Major floods and dangerous situations shall be reported in time.

Six, strengthen the supervision and inspection of production safety in flood season.

Departments responsible for production safety supervision earnestly perform their duties, strengthen supervision and inspection, and do a good job in production safety inspection and supervision of important links such as project construction sites and crowded places.

Supervise and urge all project departments to implement various measures and requirements for flood control and emergency rescue, rationally allocate financial and material resources, solve contradictions and problems in flood control work in time, ensure that the responsibility goes to people, the measures are in place, and take scientific precautions, carefully organize all-round, multi-level, wide-ranging and large-scale pre-flood inspection, solve problems found in the inspection in time, and ensure the stability of the company's safety production situation in flood season.

VII. Existing Problems and Next Steps

(1) Although the company has made some achievements in flood control, there are still some weak links: some employees still have paralyzed thoughts and luck, weak flood control awareness and lack of flood control experience.

(II) In the next step, the company will seriously sum up its experience and shortcomings and focus on the following aspects:

(1) Prepare for the autumn flood season. Customer service should be lax, actively prepare for flood control, implement flood control materials, pay attention to the changes of sunny and rainy days in time, and do relevant response work in time.

(2) Further revise and improve the flood prevention plan. Combined with flood control work, on the basis of summarizing relevant experiences and lessons, the emergency plan for flood control is further revised and improved to improve its operability and practicability.

(3) Do a good job in the construction of rescue teams. It is necessary to continue to strengthen the training and exercise of flood control commandos in the project department, actively carry out flood control drills, effectively improve the actual combat ability of flood control, and ensure that the key time can be drawn, topped and won.

By carrying out the work of safety production in flood season, the company concentrated on comprehensively investigating the major hidden dangers existing in the construction, and established a long-term mechanism for safety production management to ensure the people in flood season.

The safety of people's lives and property has improved the company's ability to deal with major problems in flood season, ensured the company's safe production situation in flood season, and stabilized the overall situation of the company's safe production work throughout the year.

Since August, affected by the strong typhoon, the flood control safety situation in Baodugu Scenic Area is very severe. In order to further strengthen the management of safety production in flood season, prevent all kinds of safety accidents and ensure the safety of scenic spots in flood season, the scenic spots put forward five measures to do a good job in safety production in flood season.

First, strengthen leadership and conscientiously implement the responsibility system for production safety.

The scenic spot will hold a special meeting immediately after receiving the notice from the group. In view of the safety situation of scenic spots in flood season, a leading group for flood season safety production was established, with Yan as the team leader, Wang Yong as the deputy team leader and relevant responsible persons as members. It has achieved early preparation, early arrangement and early deployment, defined the objectives and tasks, and ensured the effective implementation of various work measures.

The second is to investigate and eliminate risks, highlight key points and prevent all kinds of accidents.

Since the beginning of August, the scenic spot has conducted a comprehensive inspection of the hidden dangers of geological disasters and various tourist routes, reinforced the hidden dangers one by one, and focused on monitoring the existing hidden dangers. First, according to the frequent occurrence of geological disasters in scenic spots, organize personnel to conduct a major inspection and implement the responsibility system of "keeping an eye on hidden dangers of geological disasters". The responsibility lies with people, closely monitor the hidden danger points of geological disasters, and set up warning lines in dangerous areas to ensure that tourists can evacuate in time and report dangerous situations in time. The second is to set warning signs and warning lines for hidden danger sections such as slope collapse, subgrade collapse, road collapse and mountain collapse to remind tourists and vehicles to pay attention to safety.

Third, improve the plan and implement measures.

According to the characteristics of scenic spots in flood season, the emergency plan for geological disasters was revised. Set up a leading group for emergency rescue work and clarify the relevant responsible persons. The whole scenic spot has carried out planned learning activities. Combined with the actual situation of the scenic spot, the key parts of flood control were inspected and the flood control measures for the next stage were determined. Conscientiously implement the formation of flood control materials and rescue teams, clarify the main person in charge, carry out rescue drills in a timely manner, and enhance the ability to deal with emergencies.

Fourth, strengthen publicity and education to improve the safety awareness of tourists.

Widely publicize the safety knowledge in summer flood season, strengthen tourists' understanding of various disasters that are easy to cause in flood season, and effectively improve tourists' awareness of flood control and disaster prevention and their ability to save themselves.

Five, strengthen the duty scheduling work.

A 24-hour duty system has been formulated, and a disaster quick report system has been established and improved to ensure the smooth reporting channels of emergency information. Contact with the superior leading units and meteorological departments in time, closely grasp the rain conditions, and carefully analyze the weather changes. When there is a big flood, the main leaders are on duty in person, mastering the dynamics, commanding from the front, making decisions and commanding in place. Major floods and dangerous situations shall be reported in time.

Through the above measures, various measures for safe production in the flood season in the scenic spot have been well implemented, and cadres and workers in the scenic spot are actively promoting the smooth development of all work in the scenic spot with a good attitude and solid work style.

3. Monthly summary of production safety in flood season According to the requirements of the county's Notice on Rapidly Carrying out Large-scale Inspection of Production Safety in Flood Season (Fenganfa 20XX), our company carefully organized members to carry out self-inspection and self-correction of production safety, and now the relevant inspection work is reported as follows:

First, seriously carry out self-inspection work in flood season.

After receiving the notice, our company made a work plan to carry out a major inspection, quickly deployed and implemented related work, and organized company members to convey the spirit of the superior documents to the construction team; It is emphasized that we should fully understand the importance of self-examination and self-correction from a political perspective, ensure that this major inspection is implemented, improve the company's leading group for safety production, and promote various inspections according to the work plan. The company organizes members and construction team members to conduct self-inspection and rectification of safety production in flood season, and the safety section chief personally leads the team to check the implementation of rectification one by one according to the inspection evaluation table and the rectification measures table.

The second is to strengthen safety supervision in flood season.

In order to eliminate hidden dangers in production safety, our company has improved the responsibility system with the company manager as the first responsible person and the specific responsible persons of all construction teams and departments, and incorporated the performance of safety supervision into one of the important contents of performance appraisal. So as to urge the relevant personnel in charge of safety production in all departments to go deep into all aspects of safety supervision, find hidden dangers, analyze and deal with all kinds of faults in time, and eliminate hidden dangers in the bud.

Third, self-examination and rectification

1, key points of flood control safety inspection in building construction

According to the requirements of the Notice, our company will carry out dragnet investigation on key construction projects, major infrastructure construction projects, large-scale real estate development projects and deep foundation pit construction projects, and rectify hidden dangers in time. According to the characteristics of rainy season construction, our company will earnestly strengthen the site safety management, strictly implement various safety measures such as electric shock prevention, collapse prevention and falling prevention, and strengthen the maintenance and drainage of foundation projects, especially focusing on preventing the collapse and collapse of deep foundation pit slopes to ensure foolproof.

2, the flood season electricity safety inspection focus

Our company earnestly implements the requirements of the higher authorities, implements the "one post and two responsibilities" and the responsibility system for production safety, and strictly implements the relevant provisions of the safety power supply and distribution management system. Strengthen the safety management of electricity consumption to ensure the safety of electricity consumption. All kinds of electrical equipment in use must have reliable grounding or zero protection. When using mobile electric tools and electrical equipment in wet or harsh environment, isolation transformers or leakage protectors must be used, and regular inspections should be conducted to ensure sensitivity and reliability, to prevent electric shock accidents, and the preliminary inspection is qualified.

3. Implement occupational health protection measures in flood season.

It is necessary to implement practical and reliable harmful gas poisoning measures and emergency plans, strictly implement safety precautions in flood season, and strictly formulate flood control plans to ensure safety in flood season.

4. Rectification situation

(1), our company trained the construction team and became familiar with all kinds of jobs and equipment operation, which improved the team's business ability and ensured the safety in production.

(2) Equipment safety: A comprehensive inspection and maintenance were carried out to ensure the safety of the equipment.

(3) Fire safety: Some fire facilities have been added and replaced, and fire safety warning signs have been added.

(4) Power supply system: Check the power supply system to improve the safety factor of distribution.

Fourth, comprehensive dispatching and strengthening supervision.

Strengthen the supervision and inspection of the implementation of safety production in flood season, go deep into the front line, strengthen the safety inspection on the construction site, supervise and guide the construction team to further implement the responsibility system for safety production in flood season, do a good job in safety production in flood season, and eliminate hidden dangers of accidents in time. For dereliction of duty, neglect of management, responsibility is not implemented, resulting in accidents, should be severely dealt with according to law.

Five, strict system, strengthen emergency duty.

Pay close attention to the weather changes, and prevent and respond to various production safety accidents caused by natural disasters such as heavy rainfall in advance. Ensure that once an accident occurs, the emergency plan can be started immediately to truly achieve orderly, powerful and effective rescue; The 24-hour duty system in flood season was strictly implemented on site, and the company went to the site to conduct spot checks on the situation from time to time.

Summary of Work Safety Month Activities in Flood Season 4 In order to do a good job in the investigation and rectification of potential safety hazards in flood season, prevent all kinds of accidents and ensure the safety and smoothness of the North Approach Road in flood season, according to the requirements of the Notice of Shanxi Provincial Highway Bureau on Carrying out Work Safety Inspection Activities in Flood Season, our office set up an inspection team for the remediation of potential safety hazards in flood control roads, and conducted a comprehensive and detailed inspection of the management and maintenance sections. The implementation of flood control measures and the remediation of potential safety hazards in the north approach road, bridge and slope protection projects were mainly inspected, flood control preparations for key parts and construction plans in flood season were made, and feasible flood control implementation plans were formulated. Flood control work is summarized as follows:

I. Guiding ideology and basic objectives

The guiding ideology of flood control is to implement the policy of "safety first, constant vigilance, prevention first and all-out rescue". Strengthen the awareness of flood control responsibility, base on flood control and flood fighting, plan and arrange as early as possible, focus on flood control, pay close attention to weak links, and earnestly do a good job in various flood control preparations.

The basic goal of flood control is: on the basis of ensuring the safety and quality of construction, to promote the orderly and smooth progress of various projects, to ensure the safety of flood control and to avoid engineering safety and construction safety accidents.

Second, the working mechanism

1, strengthen the consciousness of flood control responsibility, and clarify the responsibility and scope of flood control. During flood control, flood control, highway maintenance and engineering construction should be arranged, inspected and evaluated in the same way, and on the premise of ensuring flood control safety, the on-site construction should be promoted in an orderly manner.

2. For projects involving flood control and flood fighting, our department has focused on strengthening the preparation of flood control and flood fighting plans, and formulated a practical flood control and flood fighting duty system to ensure smooth communication during flood season and handle emergency affairs at any time. Flood control personnel on duty and contact telephone number shall be submitted to the Provincial Bureau in writing.

3, flood control personnel on duty to fill in the flood control duty log, and carefully record the actual situation, processing results, etc. In case of major problems, report to relevant parties in time.

Third, give full play to the guiding role of meteorological departments.

Pay special attention to the meteorological and hydrological information released by the Central Meteorological Observatory and the Pinglu County Meteorological Observatory where the project is located, respond to the information released by the meteorological department in time, and implement various preventive measures.

Fourth, implement emergency rescue drills.

Actively organize and summarize emergency rescue drills to meet the needs of flood control. At the same time, in view of the shortcomings in the exercise, good suggestions are put forward and corrected, and the flood prevention plan is revised and improved to lay a solid foundation for safe flood prevention.

Five, formulate and improve the flood control work plan and measures.

1, set up flood control organizations, carry out their duties, set up flood control duty and inspection system before and after rain in the construction area, set up flood control and emergency rescue teams, and carry out relevant knowledge education and training.

2. Formulate and implement the construction progress, construction measures and construction material reserves of major flood control projects.

3. Strengthen the safety monitoring of unstable components.

4, according to the design requirements to complete the flood control project construction.

Six, the implementation of logistics support measures

1, do a good job in emergency storage of flood control engineering materials. The reserve of various flood control materials was inspected, and rectification was required within a time limit to ensure project safety and flood control.

2, to seriously organize the publicity and education activities of heatstroke prevention and first aid knowledge, do a good job in drinking water, food hygiene and heatstroke prevention, epidemic prevention and poisoning prevention. , and designate a special person to be responsible for the implementation of tracking measures to ensure the personal safety of workers.

Seven, increase the intensity of flood control safety inspection, the implementation of various flood control measures, to carry out special inspections of high temperature safety production in summer.

During the flood season, our bureau has always combined daily highway maintenance, construction safety management and flood control, organized a joint inspection team for safety and flood control, inspected the construction safety and flood control work of maintenance centers and construction teams, completed the construction of flood control projects according to time requirements, and held special meetings to review and coordinate flood control measures at important parts.

At the same time, the project department has been focusing on the characteristics that construction workers are prone to fatigue, heatstroke and accidents in summer, combining with special rectification work, and seriously carrying out safety production inspections to nip in the bud. Actively carry out self-examination and self-correction, focusing on preventing heatstroke, electric shock, lightning strike, falling from a height, food poisoning and fire.

Summary of Safe Production in Flood Season 5 According to the Notice of the General Office of the Water Resources Department of the Autonomous Region on Doing Well the Work of Safe Production in Water Conservancy during the May 1 Golden Week and the Flood Season and the spirit of the Second Quarter Safety Production Conference of the Water Resources Department of the Autonomous Region, combined with the actual situation of our office, the management office organized a safety inspection team to conduct a safety inspection on all units of our office from April 23 to 24, 20xx. Mainly check whether the reservoir engineering buildings, reservoir engineering facilities, power station equipment, vehicles, ships, power lines, wireless communication equipment, power lines and electrical appliances in public places (offices, production areas, living areas, restaurants) are in good condition. ) is safe in operation and production; Whether the public security is stable, and whether the preventive work such as fire prevention, theft prevention, gas protection and explosion prevention is put in place. The management office puts forward rectification and preventive measures in time to ensure the stability, safety production, safety management and safety work of our employees. The relevant self-inspection situation is reported as follows:

I. Work safety in production

(1) Overall safety in production.

The leaders of the management office attach great importance to safety in production and put it on the important agenda. At the beginning of the year, the safety production leading group of the management office was adjusted, with the director of the management office as the leader, other members of the leading group as the deputy leader, and the top leaders of all units as the team members. Deputy Secretary of the Party Committee of the Management Office is in charge of the security work of the Management Office, and the division of responsibilities among security officers of each unit is clear. Establish and improve the safety production management system and emergency plan, and check and assess the safety of the whole institute from time to time. Ensure that the target management of safety work is in place, the organization is sound, the responsibility system for safety production is fully implemented, the leadership is in place, and the responsibility is implemented to people.

(2) Improve the system and standardize management.

Rules and regulations on production safety, Emergency Plan for Production Safety Accidents in XX Reservoir Management Office, Management System for Hazardous Chemicals, Management System for Water Traffic Safety, and Rectification Account for Hidden Dangers of Safety Accidents in XX Reservoir Management Office have been established and strictly managed and implemented.

(3) The safety facilities are basically complete and running normally.

After inspection, the reservoir engineering buildings, reservoir engineering facilities, power station equipment, vehicles, ships, power supply lines, wireless communication equipment, power lines in public places (office areas, production areas, living areas, restaurants), electrical appliances, etc. ) and other facilities are basically complete, intact and operating normally.

(four) fire prevention, theft prevention and duty work in festivals and flood seasons are fully implemented.

Each directly affiliated unit has emphasized and implemented fire prevention, theft prevention, safe car use and electricity consumption item by item according to the requirements of the Work Plan for Safety Production Inspection of XX Water Resources Department. They made comprehensive arrangements for duty during festivals and flood seasons, and adhered to the system of 24-hour duty and leadership to ensure the safety of water conservancy production during festivals and flood seasons.

(5) Traffic safety.

At present, there are 4 flood-control assault boats, 4 tin boats,1/kloc-0 cars and buses in our bureau, all of which have implemented safe driving measures. In accordance with the requirements of "Regulations on Vehicle Management in XX Reservoir Management Office" and "Responsibility System for Target Management", strengthen the inspection and management of daily vehicle condition and vehicle capacity to ensure the safe driving of vehicles.

(6) public security issues.

The safety production inspection team specially requested XX Hotel to strengthen food hygiene and safety to prevent food poisoning. At the same time, strengthen the management of environmental sanitation, fire prevention and theft prevention in public places such as XX Hotel and XX Guest House to ensure safety and no accidents.

Second, strengthen the awareness and education of production safety.

Safety in production is not only the responsibility of leaders, but also the responsibility of every employee. Through colorful, colorful and various forms of safety production publicity activities, our department has achieved the goal of entertaining and becoming a household name.

(1) Organizing to subscribe to safety publicity materials, hanging safety production slogans and posting safety production wall charts in production and business premises, construction sites and places where workers gather. If the unit has a liability accident, the year-end target management assessment will be rejected by one vote.

(2) Organize and carry out discipline-abiding education activities, hold classes on safety production rules and regulations and operating procedures, explain safety production rules and regulations and operating procedures to employees in a targeted manner according to different objects, and use internal typical cases to carry out safety production warning education.

(three) to publish a column on the bulletin board of production safety, praise the typical cases of production safety, and announce the rectification measures and handling of potential safety hazards.

(4) For potential safety hazards found in the inspection, all stations of our institute are required to implement rectification measures in time and report them to the management office after rectification. At the same time, the work spirit of fire prevention, theft prevention and strengthening safety prevention will be conveyed to every employee, and the awareness of safety first and nip in the bud will be established.

Three, hidden dangers found in production safety inspection and corrective measures.

No major safety hazards were found during the inspection, but there are still some safety hazards:

Since 20xx, cracks have appeared on the concrete pavement at the left and right ends of the dam crest and the middle section of the main dam of xx Reservoir, with a total length of 45 meters, which has seriously affected the dam operation safety. Due to the obstruction of nearby villagers, it has been impossible to bury heavy truck limit piles at both ends of the dam. In order to ensure the safe operation of the dam, the management office is currently coordinating with the XX district government to complete this work in the first half of 20xx. It is suggested that the relevant departments of the Water Resources Department come forward to coordinate with the XXXX district government, strive for the strong support of the XX district government, do a good job in the ideological work of the surrounding people, and set up heavy truck limit piles at both ends of the main dam of XX reservoir as soon as possible.

(2) The reinforcement of the back slope of 2)XX Reservoir Power Station is not completed, which brings potential safety hazards to the power station. The personnel on duty in XX management office are required to strengthen the regular observation of slopes and mountains, especially in heavy rain, to prevent landslides and threaten the safety of power stations and personnel.

(3) The displacement of the heavy truck limit pile buried at the left end of Peicha Dam in 3)XX Reservoir affects the dam safety; The external slope of the dam crest 12m-long mortar masonry shoulder inclines due to heavy rolling by vehicles; The concrete cover plate and nozzle cover of piezometric tube are seriously damaged, and the blockage of * * * 8 piezometric tubes cannot be observed. XX reservoir management office is required to reset the heavy truck limit pile at the left end of Peicha dam before May 10, and reinforce the pile foundation; The Engineering Management Section is required to contact relevant units to be responsible for cleaning the silt piezometer of Peicha Dam before May 10.

(4) Due to the serious wear and tear of the generator set in XX Power Station and the aging of the lines, there are many potential safety hazards, and the personnel on duty in XX Power Station are required to strengthen the safe operation and safe dispatch to ensure that no production safety accidents occur.

Fourth, ensure smooth communication and strengthen patrol work on duty.

Leading cadres at or above the middle level are required to maintain smooth communication, with special emphasis on strengthening the duty and inspection during the "May 1" Golden Week and flood season, strictly implementing the leadership shift system, timely grasping the safety production situation, conscientiously implementing the safety accident reporting system, and timely reporting accidents and abnormal situations according to regulations and properly handling them. Actively solve problems for employees, resolve conflicts in time, ensure safety and stability, and strive to make employees spend a safe, peaceful and happy festival to ensure production safety, social order, public security stability and reservoir safety in flood season.

;