Traditional Culture Encyclopedia - Weather forecast - Flood control measures in rainy season

Flood control measures in rainy season

The work plan is a rough work plan with strong guidance. Before putting forward the project, we need to prepare several work plans for our superiors' reference. What problems should be paid attention to when writing a work plan? The following is a complete collection of flood control measures in rainy season that I have compiled for you. Welcome to reading.

Flood control measures in rainy season 1

I. Organizational leadership

In order to strengthen the organization and leadership of the work, the bureau set up a leading group for flood control and typhoon prevention, with the director as the leader and deputy leader, and the heads of various departments and law enforcement brigades as members. There is an office under the leading group, and the director of the office is concurrently the chief of the law enforcement management section, who is specifically responsible for the daily work of wind and flood prevention. Implement the leadership responsibility system, strengthen leadership and supervision according to the daily inspection arrangements of team members, and do a good job in emergency rescue and disaster relief.

Second, the working principle

In accordance with the principle of "prevention first, safety first, rapid response and full rescue", and in accordance with the graded response mechanism and procedures for flood control and typhoon prevention, we will ensure strong organization, timely implementation of responsibilities, smooth information, and timely and effective organization and implementation of our flood control and typhoon prevention work.

Third, the division of responsibilities

(1) communication contact group. The office is responsible for scientifically arranging the personnel on duty, carefully recording the situation on duty, uploading and issuing it in time to ensure the smooth flow of information.

(2) Organizing and coordinating groups. The office is responsible for task arrangement, vehicle deployment, publicity and reporting, etc. , timely report to the superior development, and coordinate with relevant functional departments.

(3) hidden danger investigation team. Led by the Law Enforcement Management Section, the Law Enforcement Brigade will be organized to investigate potential safety hazards within the scope of management functions before the arrival of heavy rainfall and typhoon, do a good job of on-site collection and disposal of potential safety hazards, urge the facilities with potential safety hazards to be reinforced or dismantled, and make statistical evaluation of damaged scenes.

(4) Logistics Support Group. The office and financial equipment section are responsible for timely purchasing and deploying rain gear and other emergency materials needed for duty.

Fourth, the focus of work

Law enforcement brigade in accordance with the requirements of the work, the area to carry out dragnet investigation, focusing on the following work:

1. Inspection and reinforcement of outdoor advertisements and house numbers. Investigate the setting scenes of all outdoor advertisements and signboards in this area. If there is any abnormality, we should pay close attention to the safety scenes of large outdoor advertisements such as stations, docks, schools and traffic arteries, and do real-time monitoring. If any danger is found, it is necessary to inform the owner to dismantle or reinforce it in time, and at the same time do a good job of isolation and prevention around it; If it cannot be dismantled or reinforced in time, warning signs shall be set up to remind passing vehicles and pedestrians to take precautions.

2. Clean up software advertisements such as banners and arches. Notify the publishing and production units of banner advertisements and balloon arch advertisements to clean up and dismantle them themselves 12 hours before disaster prediction; If the disaster is not cleared by itself 6 hours before the arrival of the forecast disaster, it shall be cleaned up and cleared according to law.

3. Safety inspection of office buildings. Conduct a comprehensive inspection of the doors, windows and electricity consumption of the bureau office building and the office buildings of various brigades, and implement various preventive measures.

4. Other tasks assigned by the municipal party committee and municipal government. For tasks temporarily assigned by superiors, we must resolutely obey the arrangement and scheduling, and organize manpower and material resources to solve them in time.

5. Post-disaster work. After the disaster, urge the affected units and individuals to maintain and clean up the damaged facilities, timely check and evaluate the disaster situation, and report in writing to the Bureau of Typhoon Prevention and Flood Control Office.

Verb (abbreviation for verb) working system

(1) 24-hour duty system. During the period of flood control and typhoon prevention, it is necessary to formulate a detailed duty table, clarify the leaders and personnel on duty, and ensure that the leaders, personnel on duty and emergency forces are on duty 24 hours a day. The phones of global personnel should be turned on 24 hours a day, and the contact should be smooth. It is necessary to strengthen the acceptance of the urban management law enforcement platform and ensure the timely acceptance and disposal of assigned matters.

(2) Emergency preparedness system. It is necessary to carry out pre-flood safety inspection in advance, register the problems and potential safety hazards found in the inspection, and urge relevant preventive measures to be taken in time. It is necessary to implement the submission of flood prevention and typhoon prevention information by special personnel, and collect, summarize and report flood prevention and typhoon prevention information at the first time. At all times, we must adhere to the contact with the urban flood control and typhoon prevention headquarters to ensure the smooth release and reporting of information.

(3) Job security system. During the period of flood control and typhoon prevention, all departments and brigades should organize personnel, materials, equipment and vehicles in time according to the work arrangement and under the unified command of the leading group to ensure that the guarantee is in place. If poor disposal causes serious consequences and adverse effects, it is necessary to inform and investigate the responsibility of the relevant responsible persons on a global scale.

(4) Emergency handling system. Flood control and typhoon prevention work should be prioritized and dealt with calmly. It is necessary to quickly implement the power of emergencies, deal with them at the first time, and eliminate dangerous situations in a timely and effective manner.

(5) Post-disaster assessment system. After the flood control and typhoon prevention, the relevant departments and brigades summarize the site during the flood control and typhoon prevention, and the relevant departments inspect the site where they performed their duties, and make a comprehensive and scientific evaluation and summary of the site where the flood control and typhoon prevention work was completed.

Flood control measures in rainy season II

Disasters, nip in the bud and ensure safety. In order to cope with sudden floods in summer and ensure the safety of life and property of campus, teachers and students, this plan is specially formulated.

I. Guiding ideology

Based on the principle of cherishing life and safety first, fully implement the requirements of county and city flood control work conferences, strictly grasp the weather and climate changes in flood season, and start this plan in time to ensure little or no loss when disasters come, providing a strong guarantee for the safety of teachers, students and schools.

Second, flood control measures

1. Pay close attention to the weather and climate change, master the weather forecast at any time, arrange the work, study and life of teachers and students reasonably, and be ready for emergencies at any time.

2. In case of rainstorm, the school should assign special personnel to guide students to and from school to prevent students from walking on their own. They must contact their parents before quitting. (Teachers in each class)

3, when the flood occurs, should immediately start the plan, command rescue commandos into the state of flood fighting and emergency rescue. (All male teachers)

4. In case of flood in the last class, the command group should reasonably guide the students to move to a safe place under unified command and take precautions against risks.

5. After the disaster, all teachers should focus on the safety of students and immediately enter the situation to ensure road traffic, communication, alarm, emergency rescue and maintenance.

Three. Leading group for flood control work

Team leader:

Deputy team leader:

Team members:

Responsibilities of the leading group for flood control work:

Responsible for inspecting and supervising the flood control work of the school; According to the water situation, study and formulate flood control plans; Command the flood prevention and rescue team to carry out emergency rescue; Responsible for reporting the disaster situation and handling situation to the superior; Coordinate relevant departments to do a good job in rescue work; Do a good job in dealing with the aftermath.

The leading group has an office, which is responsible for handling daily work. The office is located in the office of the Student Affairs Office, and the telephone number is _ _.

Four. Responsibilities of various functional departments

Command group:

Responsibilities: In case of regional flood disaster exceeding the standard, arrive at the scene at the first time, and start the flood control and flood fighting work plan under the unified arrangement of the county party committee and county government and the flood control headquarters of the Education Bureau.

Distribution group:

Responsibilities: Coordinate non-disaster schools to help disaster-stricken schools, organize relevant personnel to maintain school order, strengthen security, and protect teachers and students' safety and educational assets from loss.

Advisory group:

Responsibilities: Prepare for flood control in advance, postpone or advance the school leave time according to the flood situation, organize students to take refuge in safe places (classrooms on the second to fourth floors), and organize teachers or parents to escort students home when necessary.

Rescue team:

Responsibilities: Responsible for the rescue of injured patients, emergency medical treatment, sending them to hospital for emergency treatment and other tasks.

Equipment support team:

Responsibilities: Coordinate medical teams, prepare medical equipment and medicines, and participate in rescue at any time.

Drainage group:

Duties; Actively participate in and organize teachers to carry out drainage work and make good use of equipment and tools to drain water in time.

Contact group:

Responsibilities: In case of flood, the school should immediately report the disaster to the relevant departments and take effective measures on its own initiative.

Verb (abbreviation for verb) material and job security

1, schools should prepare enough shovels, woven bags, lighting tools, portable microphones, etc. And store them temporarily for use.

2, a comprehensive investigation of dangerous houses, toilets, dangerous walls, first of all, self-examination and rectification, at any time to accept the superior inspection, to eliminate hidden dangers in the bud, to ensure the safety of houses in flood season.

3. During the flood season, the school should strictly implement the 24-hour duty system during the flood season, establish a flood disaster reporting system and a recording system, and keep the telephone numbers of all the leaders of the Education Bureau and the main leaders of the directly affiliated schools in a normal state at any time, so as to facilitate the smooth transmission of floods.

Flood control measures in rainy season 3

First, raise awareness and earnestly strengthen the leadership of safety work in flood season.

At present, the rainy season is coming, and all coal mining enterprises should firmly establish the concept of "safety first, prevention first and comprehensive management". In order to further strengthen the leadership of coal mine safety production in flood season, the town government set up a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The main person in charge of each coal mine (legal representative, mine manager and main person in charge), especially the responsible comrades, should earnestly shoulder the leadership responsibility of safety production and seriously study and deploy the safety production work of this coal mine in flood season; It is necessary to fully implement the responsibility of the main person in charge of flood control safety production, establish and improve the responsibility system, and make the task clear and the responsibility to people; To have the concept of "preventing floods, saving disasters and seizing big risks", coal mining enterprises should set up special water prevention and control institutions or be equipped with hydrogeological professional and technical personnel, establish and improve the responsibility system and management system for mine water disaster prevention and control, and the main person in charge should organize the formulation of targeted mine water disaster prevention and control work plans and safety technical measures, and strictly organize their implementation, and it is strictly forbidden to organize production in violation of laws and regulations.

Two, highlight the key points, immediately carry out in-depth and detailed safety inspection in flood season.

On the one hand, in the safety inspection, all coal mining enterprises should highlight the "three defenses" of flood control, waterproof and drainage and lightning protection in rainy season, carefully find out all kinds of hidden dangers of accidents, and find out the problems and weak links in flood control work in time. For the hidden dangers and problems found in safety inspection, it is necessary to implement the responsibility system for hidden dangers rectification, and thoroughly investigate the hidden dangers of accidents in time according to the "four requirements" of determining the completion time of rectification, the person responsible for rectification, the funds and materials for rectification, and the safety measures for rectification, so as to nip in the bud and ensure that the coal mine will not be flooded or drowned; On the other hand, coal mines must engage in mining activities within the mining scope approved according to law, and leave enough coal pillars in accordance with regulations, and prohibit illegal cross-layer and cross-border mining, mining and destruction of security coal pillars, especially waterproof coal pillars. All coal mining enterprises should further find out the hydrogeological conditions around the mine (including the closed mine) and the small coal mines within the mine, and earnestly implement the provisions of "exploring before digging (mine) in case of doubt" in their work, and strictly prohibit illegal command and illegal operation; On the other hand, all coal mines should strengthen the management of waste hills, investigate and manage all kinds of hidden dangers, formulate practical and effective preventive measures, implement regulatory responsibilities, arrange special personnel to monitor waste hills, and immediately start emergency plans in case of danger, and immediately notify surrounding residents to evacuate dangerous areas to ensure safety.

Third, strengthen measures to ensure the safety of coal mines in flood season.

(a) all coal mines should conscientiously implement the relevant provisions on water prevention and control, improve the responsibility system for water prevention and control, and implement water prevention and control measures in accordance with the principles of graded management, graded responsibility and who manages who is responsible. Investigate, observe and monitor the water accumulated in goaf and small coal mines around the mine, and master the first-hand information. In places where mine hydrogeology and old kilns (small kilns) are not clear, it is resolutely forbidden to exploit mining faces with possible water seepage; All coal mines should formulate emergency plans for mine water prevention and flood control, replenish reserve waterproof and drainage equipment and materials, ensure that mine drainage equipment and facilities are in good condition, and earnestly implement the "five implementations" of leadership, organization, team, plans and materials.

(two) to strengthen publicity and education, improve public safety awareness. All coal mines should increase the propaganda of coal mine safety production in flood season, widely publicize and popularize the basic safety knowledge of flood control and flood fighting in coal mines, effectively improve the ideological consciousness of flood control and disaster prevention of coal mining enterprises and workers, improve the self-help ability of cadres, workers and the public in disaster prevention and mitigation, and earnestly ensure that they are always on the alert, foolproof and safely spend the flood season.

(three) the development of rainstorm weather early warning evacuation plan, strengthen the work on duty during the flood season. First, coal mines should strengthen contact with meteorological departments and competent departments, establish a coal mine safety forecasting system in flood season, and be responsible for regularly releasing meteorological information by using meteorological public service telephones, newspapers, radio, TV mobile phone messages and other media, focusing on heavy rainfall and floods, and providing early warning levels. Where there is heavy precipitation and rainstorm, the staff should be informed immediately. Second, all coal mines should improve the flood control duty system, implement 24-hour duty, collect and report the flood control work in time, and immediately start the flood control work plan once receiving the notice of major flood, so as to ensure that the flood control instructions are communicated to every employee in the first time. Third, coal mining enterprises should ensure the smooth flow of water information and dispatching instructions, and it is strictly forbidden to arrange workers to work under the well in rainstorm weather. Once there is a major danger, they must immediately evacuate the underground workers; Coal mine leaders should stick to their posts, adhere to the system of cadres on duty day and night during the flood season, keep abreast of the dynamics of rain and water conditions, and strive to handle and report important situations to the town government in time in front of the headquarters.

The town government will supervise and supervise the safety work of coal mines in flood season from time to time. For those who report late, fail to report or conceal, informed criticism will be given, and the major situation will be dealt with in time, resulting in serious consequences, and the relevant leaders and personnel will be investigated for responsibility according to law.

In addition, each coal mine should draw inferences from others, carefully analyze the situation and work characteristics of coal mine safety production, find out all kinds of hidden dangers and problems, put forward targeted disposal opinions, highlight the key points of coal mine safety work such as "one ventilation and three prevention", roof management, electromechanical transportation, etc., and take practical and effective measures to resolutely curb coal mine safety accidents and ensure coal mine safety production in accordance with the overall deployment of the municipal government's coal mine safety special rectification work.

Flood control measures in rainy season 4

In order to standardize and institutionalize the flood control work in our school, effectively prevent unnecessary losses caused by natural disasters such as typhoons, floods and rainstorms, and ensure the life safety of all teachers and students and the safety of national property, the Emergency Plan for School Flood Control Work is formulated.

I. Organizational structure

leave out

Second, the main responsibilities

1, Responsibilities of the leader of the leading group:

(1) Do a good job in daily flood control and information transmission.

(2) When receiving a major flood forecast, it is necessary to issue a defense notice in time, and all members of the leading group will enter a state of war. The team leader should be in the town to direct and deploy flood control and disaster prevention work, and at the same time decisively decide to stop all education and teaching activities according to the flood development situation. The school will be on duty 24 hours a day to send relevant information in time.

(3) Organize and direct the whole school to do a good job in flood control and typhoon resistance, and minimize the losses caused by natural disasters.

(4) In case of typhoon danger and flood disaster, information reporting, logistics support, post-disaster self-help and restoration of education and teaching order as soon as possible should be done in time to prevent post-disaster epidemic.

2, leading group office responsibilities:

(1) Assist the team leader in daily flood control and information transmission.

(2) Keep in touch with the town central primary school every day during the flood season, understand the flood information and tasks of the superiors, and timely reflect and report the flood control work of our school.

(3) Prepare necessary flood control tools and materials.

(4) In case of typhoon danger and flood disaster, it is necessary to assist the team leader in reporting information, logistical support and self-help after the disaster, and restore the order of education and teaching as soon as possible to prevent the outbreak of the epidemic after the disaster.

Three. Emergency work procedure

1. According to the flood notice of the meteorological department, it was quickly communicated to all teachers and students, and the patrol and prevention of natural disasters were effectively done.

2. According to the development of the flood situation, decisively decide to stop all education and teaching activities and do a good job in the evacuation of teachers and students in time. Students don't leave school at school, and students don't go to school at home to ensure the safety of students.

3, start the emergency plan for flood control and flood fighting, leading group leader in command, the deputy head in front of the command, leading group members actively cooperate, and organize relevant faculty to actively participate in flood fighting and Taiwan resistance. Focus on the protection of school computer rooms, laboratories, libraries, archives, sports equipment rooms and other equipment. When the situation is particularly urgent, the school should organize a rescue team to stand by and transfer the equipment and books that are vulnerable to floods and rains in time.

4. The leader shall arrange the on-the-job personnel on duty for 24 hours, and the cell phone and school duty phone of the leader of the leading group, the deputy leader in charge, the leader of the leading group and the personnel on duty shall be turned on all day to ensure smooth communication. Report to the central primary school in time if there is any abnormality.

5, should pay close attention to the dynamics of the disaster, the disaster relief, the leading group office should promptly report to the town center primary school disaster losses. At the same time, the office of the leading group organized personnel to clean up the post-disaster campus. For the flooded campus, please ask the town health center for epidemic prevention and disinfection in time. For severely damaged school doors and windows, roofs, fences, billboards, bicycle sheds, sports facilities, etc. , to timely put forward rectification plan to the central primary school, take the time to implement the maintenance work, as soon as possible to restore normal education and teaching work.

6. After the disaster relief, the office of the leading group should keep abreast of the disaster situation of all teachers and students' families, take various active and effective measures, give appropriate condolences and help to the families of teachers and students affected by the disaster, and ensure that no one drops out of school because of the family disaster. At the same time, the leading group should summarize and analyze in time, find out the causes of disaster losses, learn lessons, modify the plan, and make all preparations for the next flood control work.

Flood control measures in rainy season 5

In order to ensure the normal production, work order and safety of life and property, and make the facilities of the company spend the summer flood season safely:

I. Leading Group for Flood Control

Team leader: _ _

Deputy Team Leader: _ _

Member: _ _

Emergency rescue team: all staff of the company have the responsibility and obligation to participate in flood fighting and rescue to protect the property safety of the company.

Second, the flood control organization procedures

In case of danger, the company office is responsible for on-site command, and the heads of government departments and Chinese and western medicine workshops carefully deploy their own personnel to cooperate with the rescue. In case of danger at night or on rest days, the personnel on duty shall be temporarily in charge of the command, and notify other flood control team members to rush to the scene in time.

Three, the engineering department in flood season flood control measures

1, flood control equipment In the past, flood control equipment mainly consisted of woven bags, sand and shovels.

2. The key part of the company: the gates of all the factories of the company.

3. Danger: (1) The inward water at the entrance of the company is not so good. (2) The drainage pipeline is blocked, and the water level in the plant area rises.

4, before the arrival of the flood season, the office staff should carefully check the key parts of the factory.

(1) Whether the drainage ditch on the roof platform is clear, and clean up the garbage on the roof.

(2) Check whether there is sediment in the sewage well and drain pipe, and remove it to ensure smooth drainage.

(3) Check the transformer room and other important computer rooms for rain leakage, and handle it in time if any.

IV. Hazard handling procedures

1. If the factory is in danger, sandbags should be quickly used to block the doors at key positions to protect the company's property.

2. After the dangerous situation occurs, it is necessary to conduct a comprehensive inspection, count the losses and material consumption caused by this flood, and replenish flood control materials in time to prepare for the next flood control.

3. The event handling process should be recorded in detail, and the office should report to the company leaders and superior departments.

Encyclopedia of flood control measures in rainy season;

★ Model essay on flood control and disaster relief work report

★ Summary of flood fighting and emergency rescue of fire forces: 5 articles.

★ Summary report on safety production in flood season

★ Latest summary of reservoir flood control work

★ Summary of the latest flood control work

★ Summary of flood control work: 5 books selected.

★ The latest summary of personal flood control work is 5 articles.

★ Model essay on flood control and disaster relief work report

★ 2022 Propaganda Slogan for Flood Control and Disaster Reduction

★ There are 20,205 summary reports on flood control and drought relief.