Traditional Culture Encyclopedia - Weather forecast - House demolition agreement
House demolition agreement
In our daily life, the frequency of using agreements is on the rise, and signing agreements can solve or prevent unnecessary disputes. So is it really difficult to write an agreement? The following are six agreements on house demolition that I collected for you, which are for reference only and I hope to help you.
House Demolition Agreement 1 Party A: xx
Party b: xx
According to the demolition of the third dangerous building in Dazu County People's Hospital, Party A and Party B voluntarily reach the following agreement on the principles of equality, voluntariness, openness and fairness:
1. Party A will hand over the third house in the hospital to Party B for demolition.
2. The total building area is ㎡, and the demolition is RMB per square meter. Note: If the area excavated by Party A's excavator is deducted from the total area.
Three. In the process of house demolition, Party B shall be responsible for all safety accidents and any intentional damage to Party A's materials.
Four. Payment method: pay 80% according to the progress of the project, and note that Party B will dismantle the ground beam of the house.
Verb (abbreviation of verb) matters not covered shall be negotiated separately.
This agreement is made in duplicate, one for each party, and shall come into effect after being signed or sealed.
Party a: xx
Party b: xx
Year, month and day: xxx
Part II of House Demolition Agreement Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
Party A entrusts Party B to demolish the dangerous building of Grade D in xx Primary School, and through friendly negotiation, both parties sign this agreement, with the specific terms as follows:
First, the scope of demolition:
1. Tear down the kitchen and living room.
2. Building structure: civil structure
3. Demolition scope: the door wall, partition wall and back wall of the house are demolished to be consistent with the partition wall of the playground, and all the house garbage is removed.
2. Demolition time: August 2, 20xx1August 24,.
Third, the quality requirements:
1, more than 0.00 meters, the demolition site is flat, and there is no house garbage.
2. After the construction is completed, Party B shall repair the reserved back wall and cover the back wall and the playground partition with brick caps.
Four. Settlement method: the timber, doors and windows obtained from demolition shall be owned by Party B through negotiation between both parties, and Party A shall pay Party B 200 yuan in cash.
Verb (abbreviation of verb) Responsibilities and obligations of both parties: Party A is responsible for directing house demolition, reaching the boundary, dredging and perfecting, and formulating the site and garbage disposal methods.
During the demolition of intransitive verbs, Party B shall carry out the construction in strict accordance with the construction specifications, and earnestly implement the safety specifications and regulations. Do a good job in on-site safety management, the responsibility lies with people, obey the arrangement of Party A, carry out the construction in strict accordance with Party A's requirements, and report any problems to Party A in time during the construction process and solve them through negotiation.
7. In case of any safety accident during the construction period, all responsibilities shall be borne by Party B. During the construction period, Party B must ensure that the surrounding roads, water and electricity are unblocked and the water and electricity facilities of the school are in good condition. Party B shall take full responsibility for safety accidents.
Eight, Party B must complete the demolition of buildings and accessories within the scope of demolition and site cleaning within four days after this agreement comes into effect. Be responsible for a fine of RMB Wu Bai Yuan for each day of delay (except for force majeure and natural factors).
Nine. Matters not covered in this agreement shall be settled by both parties through consultation.
X this agreement is made in triplicate, with each party holding one copy.
XI。 Both parties voluntarily sign this agreement, without any regrets, and it will take effect after being signed by both parties.
Party A: (signature and seal) xxx
Tel: xx
Party B: (signature and seal) xxx
Tel: xx
20xx August 2 1
In order to strengthen the management of house demolition, standardize the behavior of the house demolition construction team, do a good job in safety prevention, city appearance and environmental sanitation, and ensure the safe, standardized and orderly operation of the demolition site, the following house demolition safety agreement is reached through consultation between both parties:
Party A:
Party B:
1. Party A shall provide Party B with the demolition address and specific demolition scope to ensure Party B's safe demolition within the construction scope.
Second, Party B must consciously accept the management of urban management, city appearance and other relevant departments, and earnestly do a good job in the safety precautions for house demolition. Party B must hold a house demolition permit before construction.
Third, Party B shall formulate corresponding safety operation procedures and construction plans before construction, and take effective safety measures. A continuous, neat and firm safety fence must be set around the site, and safety warning signs should be hung. Demolition technicians should come to the site to organize and command, and operate in strict accordance with safety scientific norms. In case of unsafe accidents during construction, Party B must take full responsibility.
4. The mechanical equipment shall be kept and maintained by Party B. If the mechanical equipment is lost or damaged, it has nothing to do with Party A. ..
5. During the construction, Party B must ensure that the surrounding roads, water and electricity (overhead high-voltage lines) are continuous, the drainage is not blocked, and the construction is safe.
6. Party A shall supervise and inspect the safety in production during the demolition operation, and notify Party B to correct any problems found in time, otherwise Party A has the right to order Party B to stop work.
Seven. This security agreement shall come into effect as of the date of sealing by both parties.
Eight. This security agreement is made in duplicate, one for each party.
Party A:
Person in charge:
Party B:
Person in charge:
* * * * Year * * Month * * Day
Article 4 of the House Demolition Agreement Party A:
Party B:
A, demolition of prefabricated houses content:
1. Due to Party A's needs, Party B is entrusted to dismantle the colored board house of xx public rental housing project, 139.29 m2, 60 yuan /m2, totaling 8,357.40 yuan.
2. After the color board house is demolished, it will be transported to Xiqingwangzhuang, with 3 cars per machine, and the freight is 1500 yuan.
3. Labor cost: 15 worker, 200 yuan/person, totaling 3,000 yuan.
2. Tax: 12857.4 Yuan 0.03 Yuan =385.722 Yuan.
Three. Party A shall pay Party B: 1438+022 yuan.
Party A's responsibilities:
1. Party A is responsible for leveling roads and ensuring installation conditions.
2. If Party B delays the construction period due to the fact that Party A does not have the conditions to install the color board room on site, Party A shall bear all the responsibilities and pay Party B 20% of the lost time.
3. Party A is responsible for providing the power supply for installing the color board room.
Party B's responsibilities:
1. Party B shall enter the site to install the color board room according to the time specified by Party A. ..
2. Party B shall be responsible for all the work in the installation process and strictly abide by all the operating procedures of dismantling. Party B shall be responsible for the safety accidents caused by Party B. ..
3. Party B shall be responsible for the installation quality of the color board room, and Party B shall be responsible for the accidents caused by the installation quality problems of the color board room.
4. After the completion of the construction of the color board room, Party B shall be responsible for the custody of the color board room.
5. Party B is responsible for providing invoices for the installation and removal expenses of the color board room, and for the losses caused by the unqualified invoices provided by Party B.. ..
The matters not covered in this agreement shall be settled by both parties through consultation based on the principle of seeking truth from facts, and this agreement shall come into effect after being signed by both parties, in duplicate. Party A and Party B each hold one copy.
Party A's Seal and Party B's Seal
Signature of person in charge signature of person in charge
Year, month, year, month, year
Article 5 of the House Demolition Agreement Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _
According to the approval of municipal road construction land, the fact that both parties * * * are responsible for dismantling _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
I. Project, Scope and Mass Production
This project is located in _ _ _ _ _ _ _ _ _
Two. Party A's responsibilities:
1. Party A has the right to supervise and inspect Party B's demolition work.
2. Responsible for coordinating the unreasonable opinions of relevant functional departments and surrounding residents.
3 responsible for solving the demolition, relocation and reconstruction of public facilities such as water, electricity, cable TV and communication, and the application and laying of temporary water, electricity and communication facilities.
Three. Party B's responsibilities:
1, Party B's demolition implementation plan must be submitted to Party A for review before construction.
2. If Party B has a safety accident during the demolition process, Party B shall be responsible for it, and Party A shall not bear any economic compensation and legal responsibilities.
3. During the demolition period, Party B must complete the demolition task of house handover on time without undue delay. If there is irresistible weather, the construction period will be postponed.
Four. Payment method:
1. Party B shall pay Party A 50 yuan RMB per square meter.
2. When signing this contract, Party B must pay Party A RMB for the project in one lump sum.
3. The factory building with the balance of about 20,000 square meters shall be dismantled and paid in full.
Verb (abbreviation of verb) Other provisions:
1. All wastes removed from the construction site (including exterior wall materials, scrap iron for doors and windows, steel bars, waste wires and ground beams) shall be owned by Party B. ..
2. Waste soil and slag shall be handled by Party B. ..
6. This agreement is made in duplicate, one for each party, and shall come into force after being signed by both parties. This agreement has legal effect.
Seven. For matters not covered in this agreement, Party A and Party B shall negotiate a supplementary agreement separately, and the supplementary agreement shall have the same legal effect.
Representative of Party A: _ _ _ _ _ _ Representative of Party B: _ _ _ _ _ _ _
ID number: _ _ _ _ _ _ ID number: _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ Tel: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 6 of the House Demolition Agreement Party A:
Party B:
The existing X room in X Lane, xx District, xx Village, xx Town, xx City is contracted by Party A to Party B for demolition. In order to ensure the smooth completion of the house demolition work and the interests of both parties will not be lost, Party A and Party B hereby conclude the following terms through consultation:
1. Demolition scope: civil works and foundation of Tang Zhong Town 10 Lane 1 House and Xialu Village in central and southern areas, with cement blocks and brick residues partially removed and transported abroad.
Two. Ownership of materials: The steel bars and scrap iron in this project are owned by Party B, and the bricks are purchased by Party A from Party B at the price of 20 cents each.
3. Demolition cost: Party A shall pay Party B RMB 1,600 (65,438+0, 600 yuan) for the labor cost of demolition.
Four. Safety responsibilities: All safety responsibilities shall be borne by Party B. ..
Verb (abbreviation of verb) payment method: After the construction site is completed, Party A pays the subsidized labor cost and red brick money in one lump sum on the spot.
6. This contract is made in duplicate, one for each party, and both parties shall abide by it. This contract shall come into effect after being signed by both parties.
Signature of Party A:
Signature of Party B:
date month year
- Previous article:The "dead zone" on the 30-degree north latitude line
- Next article:Why is rose oil better than Huang Jingui?
- Related articles
- Safety inspection in flood season in work briefing
- Tourism information of Zhaobi Mountain
- Zhong Wenbiao, when plum blossoms are in full bloom.
- What strategies do you need to do to watch the sunrise in Mount Tai?
- What kind of flower is this?
- If there is too much rain, will it really lead to a reduction in wheat production?
- When will it not be hot in summer?
- Hello, I have had a dry cough for more than a month. I feel tight and a little phlegm. What will happen? my grandmother
- Is it hot in Suzhou in May? What clothes are suitable for wearing?
- 20 16 Yibin weather forecast in September of lunar calendar 2 1.