Decorative process

The decoration process is as follows:

First, the preliminary preparation

Prepare to decorate the new house, the first thing is: determine the budget and decoration style, decoration method!

1, determine the budget

Check the balance of Chakkari, how much to decorate, and make a detailed decoration budget. Hard loading is about 30%; The main material is about 30%; Furniture+electrical appliances about 30%; The soft contract is 10%.

Step 2 choose a style

What style of home do you want, you must be clear in the early stage, otherwise you will pretend to be four unlike ... If you want a more fashionable and trendy home, you can choose modern style or simple style.

Step 3 choose the decoration method

There are three ways to decorate, clear package, half package and all package. For office workers, half a package is relatively more worry-free and labor-saving; Of course, if you just want to be a shopkeeper with a bag, you can choose all-inclusive; If you want to experience the "bitter pleasure" of personal decoration, choose the bag directly. After the above process, find a good day to start work and enter the formal decoration stage.

Second, the demolition and construction

First, carry out local demolition and new construction according to the design. If the old house is rebuilt, the original decoration needs to be demolished first, and then a new building needs to be built according to the design drawing. Attention: load-bearing wall, balance wall, load-bearing column and beam, don't move!

Third, replace doors and windows.

If it is necessary to close the balcony or replace the window, it should be done after demolition. If you need to replace the entrance door, it should be installed before the bricklayer comes into play at the latest; If it is the first floor, it is recommended to install the doors and windows before proceeding to the next step to avoid the loss of building materials and tools.

Fourth, hydropower transformation.

If it is necessary to install central air conditioning, fresh air system and floor heating, it is necessary to invite three parties to conduct on-site measurement and negotiate wiring construction before the formal hydropower transformation, and then make disclosure with the hydropower master after completion. Be sure to plan the location of all large electrical appliances before renovation, such as refrigerators, dishwashers, range hoods, water heaters, washing machines, etc. , and reserve more sockets, especially kitchen space.

Five, mud tile construction

The mud tile project mainly includes: pipeline construction → wall foundation treatment → wall waterproofing → wall tile laying → ground waterproofing → closed water test → floor tile laying → cleaning and protection → marking.

If you need to make a niche, leave niche space when wrapping the pipeline. For some special-shaped bricks, such as hexagonal bricks and feather bricks, pre-typesetting is needed before paving to avoid paving errors.

In addition, don't forget to mark the wall brick, and clearly mark the position and direction of water pipes and wires hidden in the wall and under the wall brick, so as to facilitate the installation of cabinets, cabinets and lights in the later stage. After the wall brick and floor tile are laid, protective measures should be taken to avoid late collision.

Six, woodworking construction

Woodworking construction mainly includes: gypsum board ceiling, curtain box, whole house cabinet, platform, door and door cover window cover, retaining wall, island platform, etc. In order to control the renovation period, if it is a platform-customized whole house, it will generally be retested for the last time after the bricklayer ends, and it can be installed in time after the overall construction.

Seven, paint construction

Woodworking is followed by paint construction, that is, latex paint and wood paint construction for walls, top surfaces and on-site wood surfaces. If there is no on-site wood production, there will only be latex paint construction on the wall and top. Among them, the construction process of wall latex paint is: wall inspection → brushing interface agent → leveling at the grass-roots level → hanging grid cloth → batch scraping putty → polishing → brushing primer → brushing topcoat.

Attention should be paid to the construction of latex paint: the wall surface should be painted with primer once and topcoat twice. Avoid painting construction in rainy days, because the air humidity is high and the paint dries slowly, which will affect the effect. The coating methods of topcoat are roller coating and spraying. Roller coating has a good texture and is easy to repair, but it will have flower prints. Spraying efficiency is high, smoother and easier to construct, but the amount of paint is large.

In addition, due to the different space size and lighting conditions, the color of latex paint needs to be adjusted according to the actual situation. Therefore, in order to achieve better space effect, latex paint needs to be mixed manually and tested on site before large-scale construction. After the paint construction, the hard decoration has come to an end, and then there are various installation projects.

Eight, installation project

Floor: floor.

Wall: wallpaper/wall covering, dado, skirting, switch socket, wall lamp, radiator, indoor door/door cover.

Ceiling: lamps, central air conditioning/fresh air outlet.

Whole house: customized cabinets, integrated ceiling, kitchen and bathroom sanitary ware, various household appliances.

Nine, soft entrance

Then, curtains, sofas, beds, tables, chairs and other soft clothes can enter one after another.

At this point, the renovation process is all over and the new home is officially completed! But at this time, it is best not to check in immediately. Considering the formaldehyde residue in the decoration, it is recommended to ventilate for 3-5 months before staying! Although there are countless renovation projects and processes, they can be summarized into the above nine categories.