Traditional Culture Encyclopedia - Weather forecast - Speech at the working conference of electric power during the peak summer.
Speech at the working conference of electric power during the peak summer.
Speech at the working conference on electric power during the peak summer, comrades:
Just now, we listened to and watched the national peak summer electric power video conference. The National Development and Reform Commission, leaders of relevant ministries and commissions and Vice Governor Zhang Chaochao made important speeches respectively, and made specific arrangements for this year's electric power peak summer work. All relevant departments and units at all levels should conscientiously study and understand and do a good job in implementation. Below, I will implement the spirit of the meeting and do a good job in the city's electric power peak summer. I will emphasize two more points:
First, fully understand the severe situation of tight power supply this summer.
Doing a good job in summer electricity is an important measure to implement Scientific Outlook on Development, ensure economic and social development and people's demand for electricity, and maintain social stability. Judging from the economic development situation this year, the power work situation in summer is very severe. From the perspective of the whole province, the maximum power load is expected to reach 67 million kilowatts this year, and the maximum power supply capacity of all units in the power grid is 6 1 10,000 kilowatts, with a gap of 6 million kilowatts. From the point of view of our city, affected by the national and provincial power supply situation, the power supply and demand situation in our city this year is not optimistic. First, the industrial economy is growing rapidly. During the period of1-May this year, there were 4 143 enterprises above designated size in the city, achieving an industrial added value of 76.5 billion yuan, a year-on-year increase of 15.3%, and the industrial economy maintained a steady and rapid development momentum. Especially since last year? 10+6 ? Modern industrial promotion and? 153 1 ? With the accelerated implementation of the key enterprise cultivation plan, a large number of new investment projects and enterprise technological transformation projects have been put into production one after another, which has brought about a sustained increase in electricity consumption. Second, the power load has increased rapidly. From June 5438 to May, the electricity consumption of the whole society in the city was 1 5.08 billion kWh, with a year-on-year increase of 12%, which was 8.4 percentage points higher than the provincial average, ranking first in the province. Among them, industrial electricity consumption 1 10.47 billion kwh, an increase of 13.7%, which is higher than the provincial average10 percentage point, ranking first in the province1bit. The domestic electricity consumption of residents was 65.438+0.94 billion kWh, an increase of 654.38+0.2%, 5.4 percentage points higher than the provincial average, ranking 654.38+0 in the province. The maximum load regulation index of Linyi is 48 1 10,000 kilowatts. It is estimated that the maximum load of the power grid will reach 5.6 million kilowatts this year, with a gap of nearly 800,000 kilowatts, accounting for 15% of the city's electricity load. The task of ensuring reliable power supply is still very arduous. Third, the power supply capacity is relatively insufficient. This year, the city's environmental protection management, thermal power unit transformation, time is relatively tight. According to the requirements of national environmental protection, 46 units of about 3,482 MW need to be upgraded in desulfurization, denitrification and dust removal during the year, which leads to the decline of power supply capacity of the power grid. In case of extreme weather, the unit will be urgently repaired, and the power supply and demand will be more tense. Fourth, the distribution network structure is relatively weak. Although the health level and safe power supply capacity of power grid equipment in our city have been significantly improved in recent years, the local power grid structure is weak, especially in China Southern Power Grid. There are no large power supply points and few 220kv lines. Once the power equipment fails, the power supply tension will suddenly increase. Since the beginning of this year, the city has started to use electricity in an orderly way three times, and it is a foregone conclusion that electricity will be used continuously and orderly in summer. It is hoped that all relevant departments at all levels will further strengthen their awareness of the overall situation, earnestly enhance their sense of responsibility and urgency in doing a good job in electric power peak summer, further clarify their goals, strengthen measures, and do a good job in orderly saving electricity, so as to provide a strong guarantee for promoting the sustained and healthy economic and social development of the city.
The second is to go all out to do a good job of power supply during the peak summer.
In order to do a good job in this year's electric power peak summer work, according to the requirements of the municipal government, the Municipal Economic and Information Committee and the power supply company have formulated the "20xx City's Electric Power Peak Summer Plan" and the "20xx City's Orderly Electricity Use Plan", and all relevant departments and units in counties and districts should carefully organize and implement them according to the division of responsibilities.
(1) Strengthen power dispatching. It is necessary to take the safe and stable operation of power grid as the top priority of power work and fully safeguard the safe operation of power grid. First, power generation and power supply enterprises should establish and implement a strict responsibility system for production safety, clarify the responsible person, prevent delays, and timely dispatch power consumption peaks. The second is to strengthen power grid operation monitoring and inspection of power transmission and transformation facilities to eliminate line aging and equipment defects in time. Establish an effective safety emergency mechanism, further improve the power emergency plan and emergency command system, strengthen anti-accident drills, and improve the ability to deal with various emergencies. Third, through scientific dispatching, seriously implement the power grid safety and stability measures, strictly abide by the dispatching discipline, and resolutely put an end to the incidents that blindly exceed the quota and endanger the safe operation of the power grid.
(2) orderly use of electricity. Follow? Safety and stability, limited insurance coverage, focusing on prevention? In strict accordance with this year's orderly electricity consumption plan, the electricity consumption will be refined to users, loads and lines. According to the tax contribution of enterprises within the jurisdiction in this industry, orderly use electricity and save electricity, comprehensively use legal, economic and market means to promote energy conservation and emission reduction, eliminate backward production capacity, and limit the unreasonable use of electricity by enterprises with high energy consumption and high emissions and illegal construction. It is necessary to adhere to the limited guarantee, give priority to ensuring the residents' life and the reliable supply of important power users involving public interests and national security, especially to ensure the power demand of key projects and key projects, and minimize the lack of film impact.
(3) Strengthen coal reserves. During the peak summer, the shortage of power coal supply is one of the important reasons for the shortage of power supply. All relevant departments should strengthen assistance and coordination to improve the coal storage level of power plants in our city as much as possible. The transportation department and the traffic police department should take coal transportation as the top priority, provide convenience and support for coal transportation, open up a fast lane for coal road transportation in a special period, give priority to ensuring the passage of coal vehicles and ensure smooth flow. Power generation enterprises should take the overall situation into account, overcome difficulties, concentrate manpower, material resources and financial resources, reserve electric coal and fuel in advance, do a good job in the stable operation of power generation equipment, maintain power generation equipment at all times, minimize the maintenance of power generation equipment during peak summer, and ensure adequate supply during peak summer.
(4) Promote electricity conservation. It is necessary to intensify propaganda and public opinion guidance, strengthen awareness of power saving, promote the whole society to save electricity and create a good social atmosphere. Party and government organs at all levels, institutions, industrial and commercial users, offices and public places in summer, the air conditioning temperature is not lower than 26 degrees, office lighting needs to be turned off. Urban landscape lighting should be scientifically laid out, the power consumption of landscape lighting and lighting projects should be strictly controlled, and the limited power should be used where it is most needed.
(5) Strengthen organization and coordination. Doing a good job in this year's electric power peak summer is related to the overall development and stability of the city. All relevant departments at all levels should firmly establish the idea of playing chess, consciously obey the unified dispatch of the whole city, strictly implement the measures of peak shifting, peak avoidance and rotation of electricity consumption by enterprises, adhere to the orderly use of electricity, and ensure the safe and stable operation of the power grid. Right? Limited insurance? The principle of orderly use of electricity will be punished by informed criticism or power failure. The county and district governments should establish and improve the emergency coordination mechanism of power supply guarantee, formulate work plans, strengthen work scheduling, strengthen supervision and inspection, and timely solve new situations and problems in power production and supply. Municipal development and reform, letter, finance, power supply and other departments should conscientiously perform their duties, strengthen cooperation, timely communicate information, scientifically predict trends, do a good job in implementation, and strive to achieve safe production and stable power supply in the city.
Comrades, the peak of electricity consumption in summer is coming. Governments at all levels and relevant departments should further raise awareness, strengthen leadership, implement responsibilities, ensure the safe and stable operation of the power grid, do their best to do orderly power supply work, and make new and greater contributions to the sound and rapid economic and social development of the city!
Speech at the working conference of electric power during the peak summer. Leading comrades:
According to the arrangement of the meeting, I speak on behalf of China Southern Power Grid Corporation.
During this year1-May, China Southern Power Grid Corporation (China Southern Power Grid Corporation) conducted a survey according to the central? Stabilize growth, promote reform, adjust structure and benefit people's livelihood? The main tone is to conscientiously implement the work arrangements of the state and relevant ministries and commissions, make efforts to promote the closed-loop control of production safety risks, carry out in-depth investigation and management of hidden dangers, and make every effort to implement various measures to ensure the safe and stable operation of the power grid and the orderly and reliable supply of electricity in five provinces (regions).
First, the overall situation of summer in southern China.
From June 5438 to May, the maximum dispatching load of the whole network was 654.38+292 million kilowatts, up by 7.05% year-on-year; Unified dispatching received electricity of 316.3 billion kwh, up by 5.77% year-on-year; The electricity consumption of the whole society was 356.8 billion kWh, a year-on-year increase of 7.04%. In the second half of the year, the power supply and demand situation of the whole network was generally balanced and partially tight. Affected by the shutdown and reduction of energy-consuming industries such as electrolytic aluminum in Guangxi and Guizhou, there is a downside risk in the growth of electricity consumption; Hainan power grid will be seriously short of electricity due to the delayed production of units, denitrification transformation and insufficient gas supply. It is predicted that during the peak summer, the maximum unified load demand of China Southern Power Grid will reach 65.438+0.35 billion kilowatts, up 4.49% year-on-year.
Second, the main problems facing the peak summer
First, it is difficult to absorb hydropower. This year, Yunnan will add 53 1 10,000 kilowatts of hydropower units, and the water supply in flood season is generally better than last year. Due to the slow growth of electricity consumption, the pressure of hydropower consumption in Yunnan is great, and the contradiction between hydropower and thermal power is prominent.
Second, the security pressure is high. ? Two crossings? After all DC systems (Xiluodu and Nuozhadu) are put into operation, the stability characteristics of the system are more complicated, and the risk of large-scale power outage caused by fault tripping of power transmission and transformation equipment increases. Extreme weather, such as earthquakes, typhoons and heavy rainfall, frequently occur, which poses a threat to the safe and reliable power supply of the power grid.
Third, the local power grid has high peak-shifting pressure. Hainan has a large power gap, with the biggest gap in June and July. Considering that the denitrification reconstruction plan of Haikou and Dongfang Power Plants is postponed, the maximum power gap will still reach 600,000 kilowatts.
Third, the work arrangement for the peak summer
In order to do a good job in this year's peak summer, the company focuses on the following work:
First, carefully arrange the operation mode and do a good job in power supply. Carry out in-depth load forecasting and water regime analysis, strengthen power generation dispatching management, implement the national energy-saving power generation dispatching principle, give full play to the optimal allocation of resources on the platform of power transmission from west to east, and try our best to absorb clean energy such as hydropower. On the premise of ensuring safety, we will study and implement measures to increase transmission on the 500 kV Fukuoka line in Hainan to alleviate the power gap in Hainan.
The second is to strengthen risk management and control to ensure the safe and stable operation of the power grid. Follow? Full coverage, zero tolerance, strict law enforcement and pragmatism? It is required to carry out in-depth safety inspection and hidden danger management, do a good job in equipment operation and maintenance, implement the principle of closed-loop management and control of graded risks, and resolutely prevent large-scale power outages and local power outages.
The third is to do a good job in disaster prevention and emergency management and improve emergency support capabilities. Refine and improve all kinds of emergency plans for disaster prevention, optimize emergency response procedures, improve external coordination and linkage mechanisms, strengthen monitoring and early warning of extreme weather and natural disasters, and carry out emergency response in a timely and effective manner. We will conscientiously implement various measures for wind prevention, flood control and lightning protection of power transmission and transformation equipment, carry out wind prevention and reinforcement work in coastal areas, and improve the comprehensive disaster prevention capability of power grids.
The fourth is to increase the construction of distribution network and improve the reliability of power supply. Actively carry out the optimization of distribution network frame and technical transformation of equipment, improve the transferable power supply rate of lines, and strive to solve the power supply bottleneck problem in some areas. Priority is given to rural power grid investment projects in the central budget, with emphasis on ensuring people's livelihood power consumption projects that meet the demand of load growth.
Fifth, strengthen demand-side management to provide customers with quality services. Carry out the national macro-control policies and strictly control them? Two heights? Enterprises and industries with overcapacity use electricity, giving priority to ensuring residents' lives and important users' power supply. Do it seriously? Three public dispatch? , strictly perform power supply services? Ten promises? Improve the customer-centered working mechanism, promote the rapid power recovery mechanism, improve the customer emergency service ability in the case of natural disasters and accidents, and do a good job in power supply service.
Leaders, China Southern Power Grid Corporation will conscientiously implement the spirit of this meeting, go all out to ensure the safe and reliable power supply of the power grid, fully complete the task of meeting the peak and spending the summer, and provide good services and support for the economic and social development of the five southern provinces (regions).
Speech at the Power Work Conference for the Peak Summer Dear Deputy Director Liu Tienan and leaders, good morning!
According to the arrangement of the meeting, I will make a brief speech on the work of China Southern Power Grid Corporation in 20xx.
In 20xx, the company's safety production was generally stable, but due to the global financial turmoil, the demand for power grid electricity dropped sharply from June to May. China Southern Power Grid Corporation conscientiously implements the important arrangements of the CPC Central Committee and the State Council, and does a good job in all aspects in accordance with the requirements of relevant ministries and commissions to ensure the safe and stable operation of the power grid and provide strong power guarantee for maintaining growth, expanding domestic demand and restructuring. Now, the power supply situation of China Southern Power Grid Corporation and the progress of key work during the peak summer are reported as follows:
First, the power supply and demand situation in June 5438+0-May and the power supply and demand forecast during the peak summer.
Since the beginning of this year, the macro economy has been running at a low level. Although the negative growth trend of power demand in five southern provinces has slowed down, the foundation of recovery is unstable. During the period of1-May, the company sold187.99 billion kWh of electricity, a year-on-year decrease of 1. 18%, and the total electricity received by the whole network was 200.65 billion kWh, a year-on-year decrease of 3.28%. In the first week of June, the electricity collected by the unified dispatching system was106.3 billion kwh, up by 2 14% year-on-year, and the demand for electricity showed an upward trend.
It is estimated that during the peak summer, the electricity consumption of the whole network is generally balanced and partially tense, and the electricity consumption is 200 billion kWh, up 4.4% year-on-year. The maximum unified load is about 90 million kilowatts, up 3.7% year-on-year.
The second is the development of key work of China Southern Power Grid Corporation during the peak summer.
1, do a good job of water and electricity consumption and coal early warning. Affected by the autumn flood in 2008, the storage capacity of major reservoirs was high at the beginning of the year. It is very difficult to predict that the southern region will be rich in water and absorb hydropower this year. Through careful dispatching in the early stage and multi-party cooperation, the hydropower generation from June 5438 to May reached 50.27 billion kWh, an increase of 15 1 100 million kWh compared with the same period of last year, and all major hydropower stations reached the water level reduction target set at the beginning of the year. At the same time, it is necessary to further improve the early warning and pre-control of coal supply. At present, the supply of coal for power plants in the network is good. By the end of May, the available days of coal storage in the whole network reached 24 days, and the available days of coal storage in all provinces and regions were higher than the warning line of 12 days, which laid a good foundation for the peak summer.
2, go all out to do a good job of high-quality power supply, to provide protection for increasing supply and sales.
Taking improving the reliability of power supply as the overall starting point, we will strive to increase supply and expand sales to serve economic growth. First, focus on tracking the projects of governments at all levels to expand domestic demand, plan and build supporting power grid projects in time, speed up power operation, and ensure the demand for electricity for expanding domestic demand projects; The second is to increase power grid construction and solve the bottleneck problem of network cards; Third, improve service capacity and efficiency, optimize equipment outage maintenance scheme, improve power supply measures for distribution network transformation, promote live operation of distribution network, and improve power supply reliability in a multi-pronged manner; Fourth, carefully sort out the situation of single line and single transformer, and take measures such as improving standby automatic switching configuration and strengthening the connection of the next level power grid to prevent large-scale power outage caused by single equipment failure; Fifth, improve the plan of increasing supply and sales, increase the tracking and analysis of the market, regularly understand the progress of new major projects, strengthen the monitoring and analysis of key industries and users, and maximize the potential of increasing supply and sales. Strive to increase the annual electricity sales by 5%, reflecting the due role of China Southern Power Grid in ensuring growth, people's livelihood and stability.
3. Seriously implement various measures to ensure the safe and stable operation of the power grid. Organized and worked out the 20xx annual power grid operation mode and the summer peak work plan, and implemented 25 key measures to ensure power grid safety; Carefully plan the pre-test, overhaul, scheduled inspection and defect elimination of power transmission and transformation equipment to improve the health level of equipment; Scientifically arrange and carefully organize to ensure that nine key projects, such as Hainan networking project and series compensation project for improving power transmission from west to east, will be put into production as scheduled; Coordinate the power generation plans of all parties, ease the contradiction between power plants and power grids, and the east and west, and help each other in the same boat. Early deployment, early arrangement and early implementation, comprehensively strengthen the management of wind and flood prevention, and ensure the safe and stable operation of the power grid.
Leaders, although this year's peak summer situation is complicated, we will conscientiously implement the relevant spirit and work requirements of this meeting, take active actions to ensure the safe and stable operation of the power grid, fully complete the task of peak summer, make every effort to provide strong guarantee for high-quality power supply, increase supply and marketing, and promote the economic recovery and prosperity of the five southern provinces as soon as possible.
- Previous article:Composition: 600 words, dedicated to a heroic and dedicated person.
- Next article:The pinyin of Sanqu
- Related articles
- Sentences about environmental description
- In the dead of night, I miss your poems.
- Literary sentences about little daisies
- What are the tourist attractions in Heihe?
- Are there many people going to Qinghai Lake on National Day?
- What is the reason why there is always a small abdominal pain after going to the toilet at night?
- My sister's composition in the sixth grade
- Excellent teaching plan and teaching reflection on the theme of kindergarten middle class
- 20 16 weather in Zhuhai, Guangdong on March 7th and 8th.
- Hydrological characteristics around rivers