Traditional Culture Encyclopedia - Weather forecast - Will the low temperature in winter affect the tiling?
Will the low temperature in winter affect the tiling?
Exterior wall tiles pasted in winter are prone to problems.
After the Huashang Daily reported that the tiles of Ye Wei Building had fallen off seriously and the outer wall of the building had become a mosaic, the property manager of Ye Wei Building showed the reporter a record of their staff monitoring the outer wall every day.
"This building was built in 1998. After 20 13, the external wall tiles gradually fall off. In the past three years, almost from April to July, it has encountered bad weather, which is easy to cause problems. " A property manager of the building said. According to the reporter's understanding, because there is no overhaul fund in Ye Wei Building, the repair work has been difficult, and only staff can be arranged to monitor the external wall tiles.
"The tiles pasted in winter are prone to problems." Yesterday, a worker who repaired the external wall tiles in Qiao Rong said, "In winter, the cement sets slowly. We have repaired the external wall tiles of many buildings, and almost all the tiles have fallen off in winter. "
Extended data:
Matters needing attention in winter decoration:
1, should be combined with winter temperature and humidity.
In winter, the temperature is low and the air humidity is high in rainy days. Therefore, it is necessary to avoid transporting decoration materials and coatings in rainy days. The temperature below 0℃ is not suitable for decoration. The ambient temperature during the construction of ordinary mixed color coatings should be above 0℃, the ambient temperature for coating should not be lower than 5℃, and the ambient temperature for coating varnish should not be lower than 8℃.
Therefore, when decorating in winter, the indoor temperature should be kept at least 5℃. In particular, oil workers should pay more attention to "keeping warm" and open doors and windows for ventilation after being fully dried.
2. Set aside enough time.
"There should be enough decoration time. When the water and electricity are finished, mud should be made. It is best to stop for four or five days or a week after the mud is finished. Nowadays, many people do carpentry as soon as the mud is finished, which is not good. Dry the mud thoroughly, scrape it for the first time and scrape it for the second time immediately. Do it, or it will be moldy. "
People's Daily Online-Is there a potential safety hazard in the ceramic tile exterior wall? Insiders: It is easy to fall off in winter.
People's Network-Is the winter decoration right at that time? Live in a new house in the New Year.
- Previous article:Introduction of Fujian Yongchun Summer Resort
- Next article:How to prevent vitiligo from spreading in spring?
- Related articles
- What should I pay attention to when traveling to Russia? What can't be missed?
- The weather in Mandula.
- What does the weather forecast symbol of Apple's mobile phone mean?
- The Japanese government has declared a state of emergency in many places and the weather is getting warmer. Why can't the epidemic be controlled?
- Why does crucian carp always jump on the water when it throws seeds?
- When is the best time to travel to Yili?
- What does sultry mean? What does sultry mean?
- What's the weather like in Wuqiang Zhouwo?
- What is the name of the Ark Survival and Evolution Wonderland?
- What is the sign of sandstorm weather?