Traditional Culture Encyclopedia - Weather forecast - Model paper of production meeting minutes

Model paper of production meeting minutes

Safety in production refers to the relevant activities that take corresponding accident prevention and control measures to avoid accidents that cause personal injury and property loss, so that the production process can be carried out under specified conditions, so as to ensure the personal safety and health of employees, equipment and facilities are not damaged, and the environment is not destroyed, and to ensure the smooth progress of production and business activities. The following is a sample of the minutes of the production meeting I brought you. Please refer to.

Sample production meeting minutes 1

1 On the afternoon of February 2nd, General Managers XX and xxx presided over the production and operation meeting of1February in the conference room on the third floor of Taishan Sunshine Metallurgy. Deputy managers xxx, xxx, xxx, department heads and related personnel attended the meeting. The meeting analyzed and summarized the production and operation in 1 February, and deployed the key work of production and operation in XX1month. The minutes of the meeting are as follows:

The meeting first reported and analyzed the production and operation of 1 February, and arranged the production measures of XX years1month. Liu Jingli has put forward new requirements for production technology, especially for iron castings. Manager Zhang suggested that all units should pay close attention to maintenance and daily maintenance to ensure safe production, and pointed out that the maintenance cost is too high, which put forward requirements for future maintenance work. According to the report and speech, Mr. Wang summarized as follows:

The production in 1 February is basically normal, but there are still some problems. The main problem is that there are too many times of damping down, and ironmaking, sintering and work in XX years1month are arranged.

A, ironworks preparation:

Wang pointed out that during1February, a lot of preparations were made for cast iron, including equipment organization, personnel organization and production preparation, which ensured the smooth progress of cast iron work. At present, the production capacity of cast iron has reached 600 tons/day, and the quality of cast iron has been improved, but it still needs to be improved. It is also required that ironmaking must ensure the quality of cast iron and lay the foundation for sales.

Second, the main and objective reasons for the output decline of sintering plant:

(1) The shutdown time is too long, and there are too many planned and unplanned overhauls, resulting in too long shutdown time, which affects the production process and the sintering output objectively.

(2) The cold weather in1February led to material problems, which affected the sintering production and led to low output in1February.

(3) There are contradictions and conflicts between export and self-use sinter.

This requires the sintering plant to overcome these difficulties and problems and put the production of sinter in an important position.

3./KLOC-Problems existing in the company's operation in 0/2 months:

(1)1February, the company implemented measures to limit hot metal and increase the output of iron nuggets, which improved the company's operation, but the low price of pig iron caused a passive situation in operation.

(2) For the executing company? Production and management strategy with cost control as the core? Waste (heating, water and electricity, material waste, etc. ) rectification should be carried out to ensure the strong implementation of the company's policies.

(3) In view of the present situation of the steel industry and the current situation faced by the company, Mr. Wang analyzed that:

The situation in XX is not optimistic. First of all, China's steel policy and steel market will not improve significantly in the near future; Secondly, Laigang and Taigang, the company's two main trading partners, have achieved the goal of high yield in XX. In view of the current steel market, the two major companies will change their strategies in XX, and the demand for pig iron will decrease, which is very unfavorable for us. Under such circumstances, we must be prepared for the difficulties of XX years 1 month. Specific measures:

1, have a rest assured meal

General manager Wang pointed out: under any circumstances and any difficulties, we must do a good job in safety. Only by doing a good job in safety can we ensure the normal operation of the company.

2. Reduce costs and tap potential

Only by taking any feasible measures to reduce production and operation costs and ensure low cost and high efficiency can we generate profits and help the company tide over the difficulties.

3, careful calculation

It is necessary to reduce all expenses, all expenses, carefully calculate and fully implement the company's policies. All cadres and workers should unite to tide over the difficulties.

Xx xxx metallurgical company

Production meeting minutes model essay 2

Meeting time:? Year? Month? sun

Meeting place: conference room on the third floor of the company.

Moderator:

Participants: company leaders, heads of departments and project departments.

Contents of meeting minutes:

The meeting was chaired by * * *. According to the spirit of the regular meeting of cadres held by the general manager and some phenomena found in the recent supervision and inspection work, new arrangements have been made for the next step.

1, safety supervision and inspection. From once a month to twice a month, the main participants, safety officers and principals give rectification instructions according to the inspection situation; Hold regular safety meetings at the end of each month to report the recent safety work.

2. Safety inspection system. On-site inspectors, safety officers, management personnel, etc. All parts shall be inspected and registered according to the system. The frequency of inspection is low, and those who do not follow the system will be punished according to relevant regulations; The rolling mill added a record book to the thin oil station, and the personnel checked and registered properly.

3. Factory vehicle management. At present, our company has a large number of vehicles, such as forklifts, transport vehicles, tractors, excavators, commercial vehicles and so on. Therefore, it is necessary to strengthen the supervision and management of on-site personnel, especially construction vehicles, to explore the construction site, and to stop or notify the security department to deal with violations.

4. Conduct pre-job training for safety leaders and special operations personnel in different regions. Special steel and high-speed wire rod will be put into production soon, and now all regions should set up part-time safety leaders; The safety operation procedures of each post should be compiled into a book, and employees should be trained in a targeted manner.

5, homework ticket use. At present, there are many aerial work, hot work and confined space work, but the use of individual work tickets is not in place. People at all levels sign the working ticket, which also informs you to check its preventive measures and arrange personnel to check and assist, and also reflects the importance attached to safety. If the next inspection finds that the operation ticket has not been handled, it will be punished according to the regulations, and if the illegal operation is found, the punishment will be doubled.

6. Safety signs on the project wall. Now that the high-speed rail has been partially completed, it should be used as soon as possible, especially the gas station, power distribution room, operation desk and other parts, which will be tested soon to serve as a warning to operators and outsiders; Some special steel safety signs should be made after collection; The marking of new factory buildings must be carried out according to the promulgated national laws and regulations.

7. Smoking is strictly prohibited. At present, people have been arranged to conduct inspections every day, and occasional surprise inspections at night. If anyone is found smoking at the scene, it will be handled according to the regulations. No matter what happens, everyone should be informed in place, including our employees and foreign construction teams.

8, lightning protection self-inspection. Each factory uses the key table to do self-inspection on the grounding of gas station and power distribution room to see whether the grounding meets the requirements; At present, in order to reduce the damage of lightning and static electricity to electrical appliances or lines, some units have installed surge devices in dangerous parts such as gas stations to prevent damage. Let's see if we should install them.

9. Summer is coming, so we should do a good job in heatstroke prevention and gutter cleaning. Measures such as increasing part of cooling water for employees; Some equipment should be checked; The driving temperature is high, so it is necessary to check and maintain the air conditioner and urge the new driving air conditioner on the project. Before the rainy season comes, it is necessary to clean the gutter and the sink on the top of the workshop, repair the damaged downspout, and prevent rainwater from recharging or getting wet. The low-lying temporary lines of the construction team of this project should be cleaned up to prevent accidents.

10, traffic safety. Some new employees have entered the project one after another, emphasizing traffic safety. At the same time, it is necessary to issue a receipt now, so that they can form good habits from the beginning.

Production meeting minutes model essay 3

Unit: Time:

Meeting host:

Participants:

Conference theme: safe production in flood season

First, the meeting focused on the current flood control situation, fully absorbed past experience and lessons, made overall arrangements for this year's flood control and disaster relief tasks, and established a comprehensive system. All employees are integrated, fast and efficient? Flood control and disaster relief organization system to further improve the flood control awareness of all employees. In case of sudden flood, the following measures should be taken:

1, cut off the power supply and stop all construction equipment.

2, organize personnel, rescue people in distress, and notify the hospital.

3, timely report to the relevant departments, request support, timely evacuation.

4, timely report the time and place of the accident.

5. Protect the scene of the accident and accept the investigation of the higher authorities.

6, the company personnel to the scene of the accident command in time, arrange emergency rescue.

7. Do your best to ensure the safety of all employees.

Second, the current construction is in summer and the weather is hot. Workers must take heatstroke prevention measures at the construction site.

Making articles related to meeting minutes model essay:

1.6. Demonstration article on the format of enterprise meeting minutes

2.3 Sample product meeting minutes.

3. There are 6 model essays on high-quality meeting minutes.

4.6 minutes of classic meetings.

5. Standard format of company meeting minutes

6. Format of meeting minutes and six model essays