Traditional Culture Encyclopedia - Weather forecast - Rain and snow emergency plan for sanitation workers
Rain and snow emergency plan for sanitation workers
Rain and snow emergency plan for sanitation workers (selected 6 articles)
In study, work and even life, there will be some emergencies with insufficient protection. In order to minimize the damage caused by the accident, If adverse effects occur, it may be necessary to formulate an emergency plan in advance. So the question is, how to write an emergency plan? Below is the rain and snow emergency plan for sanitation workers that I collected and compiled (selected 6 articles). You are welcome to read it. I hope you will like it.
Rain and snow emergency plan for sanitation workers 1
In order to maintain order in the North Railway Station Square area, ensure safe and smooth roads, improve emergency response capabilities to severe weather, and minimize rain and snow For losses caused by freezing disasters, this emergency plan has been specially formulated based on the work responsibilities of each department and unit within the jurisdiction.
1. Unify ideological understanding
It is necessary to do a good job in safety management of the square area under severe weather conditions of rain, snow, ice and ice as an important measure to prevent and reduce safety accidents at the North Railway Station , proceeding from the overall situation, firmly establish the policy of "safety first, prevention first, comprehensive management", and conscientiously implement it in terms of thoughts, measures, and actions.
2. Strengthen organizational leadership
In order to strengthen leadership and ensure the implementation of work, a leading group for emergency management of severe weather such as rain, snow and freezing was established to be responsible for emergency management of severe weather such as rain, snow and freezing Decision-making and command of important matters. The members of the leading group are: the director of the Integrated Management Office serves as the team leader; the deputy director of the Integrated Management Office and the director of the North Railway Station serve as deputy team leaders; the engineering section chief of the Yuyao Section and Yuci Station Headquarters of the passenger train and the comprehensive section chief of the Integrated Management Office , the management section chief and deputy section chief, the person in charge of the police office of Tiepai North Railway Station, the deputy general manager and relevant persons in charge of security in each unit under the jurisdiction, and the project manager of the property company are team members.
The Office of the Emergency Management Leading Group is specifically responsible for the emergency management of severe weather such as rain, snow, freezing, etc. in the square area; coordinates and guides the emergency response work in areas affected by severe weather such as rain, snow, freezing, etc., and coordinates the relevant departments in the square area to jointly carry out Emergency response work; regularly summarize and report to the leadership group information on rain, snow, ice and other severe weather, stranded passengers, and road traffic.
3. Clear work responsibilities
North Railway Station: Make the unit’s severe weather emergency plan and implement various safety measures; be responsible for maintaining the order of railway transportation and coordinate with the General Management Office for proper placement Evacuate passengers stranded at railway stations due to disasters; implement emergency and relief supplies to prevent rain, snow and freezing disasters; be responsible for coordinating railway safety management and rescue work to ensure safe and smooth railway operation.
Long-distance passenger transport companies, urban bus companies, urban and rural bus companies, bus station companies, and Cixi urban and rural bus companies: Make their own severe weather emergency plans, implement various safety measures, and arrange for relevant personnel to arrive at the station On-site duty, strengthen the dynamic management and supervision of passenger vehicles; implement rescue and relief materials to prevent rain, snow and freezing disasters, actively take measures to clear snow and remove ice at stations, and promptly report line suspension and passenger transportation situations to the emergency leading group office and higher authorities.
Comprehensive Section of the General Management Office: promptly report the impact of rain, snow, freezing and other severe weather to the municipal party committee and the city government; prepare emergency supplies for rain, snow, freezing and other severe weather; grasp real-time information on rain, snow, freezing and other severe weather ; Strengthen the cadre duty system to ensure smooth flow of information and government orders; contact taxi companies in case of train delays to ensure capacity and timely evacuation of passengers.
Management Section of the General Management Office: Arrange personnel in a timely manner to complete the cleaning work of the main roads in the jurisdiction in accordance with the requirements of superiors to ensure that the main road sections and intersections in the square area are basically smooth; timely understand and master the square under severe weather such as rain, snow, freezing, etc. The social security situation in the region; based on the impact of severe weather such as rain, snow, and ice on traffic, issue early warnings of severe weather traffic impact to passengers; guide the comprehensive management team to focus on strengthening the patrol control of important nodes such as Zhan North Road, taxi approach bridge, and Zhan South Road, Guide vehicles to pass safely and orderly; timely summarize and report to the leading group information on rain, snow, freezing and other severe weather, stranded passengers, and road traffic information.
Zhenxing Property Company: Strengthen the inspection of facilities and equipment in the square area during severe weather such as rain, snow, and freezing to ensure the normal operation of the underground garage; implement the preparation of security personnel to prepare for the necessary response to severe weather such as rain, snow, freezing, etc. All kinds of materials and equipment; obey the arrangements of the management department and organize personnel to clear the snow on the roads in a timely manner.
4. Arrange for stranded passengers
Affected by severe weather such as rain, snow, ice, etc., trains are often delayed and passengers are stranded. For this reason, accurate train information must be provided, and relevant departments must be actively organized and coordinated. Evacuate passengers in an orderly manner and properly accommodate stranded passengers.
(1) The Comprehensive Section will contact the North Railway Station to learn about train delays (train numbers, passenger flow, etc.) in a timely manner, and contact taxi companies at any time to ensure that transportation capacity can evacuate passengers in a timely manner; contact surrounding hotels and hotels to provide passengers with Accommodation information.
(2) If there are indeed stranded passengers, organize the efforts to guide the stranded passengers to the temporary resettlement sites (the first and second floors of the commercial complex) to rest in an orderly manner, contact the Civil Affairs Bureau, and provide necessary food and quilts to keep them warm. Warming items. Contact the Municipal Health Bureau to activate temporary medical aid stations to provide necessary medical means to prevent and control infectious diseases. The property management company shall do a good job in health management and public security maintenance.
5. Implement work requirements
(1) Strengthen leadership and attach great importance to it. Responding to severe weather is a public welfare activity, which is directly related to people's travel and the normal order of the comprehensive management of the North Railway Station. All departments and units must attach great importance to it and make preparations for the response in advance to ensure that personnel are in place, materials are allocated in place, and actions are taken quickly. Disaster-resistant tools and snow-melting and anti-freezing materials must be kept and maintained by dedicated personnel to ensure emergency use and to minimize losses caused by rain and snow disasters.
(2) Clarify responsibilities and respond quickly. Each department and unit must identify responsible persons, ensure smooth communication with walkie-talkies, mobile phones and other communication tools, quickly arrive at the designated location, and carry out cleaning operations in a timely manner. It is necessary to further strengthen duty work and implement a 24-hour duty and leadership system. Personnel on duty must stick to their posts, pay attention to weather changes at any time, closely track the process of disasters, understand snow, rain, customs, and disasters in a timely manner, and identify a liaison person to ensure smooth flow of information. Once a disaster occurs, it must be reported quickly and level by level in accordance with the relevant information reporting system, and emergency plans must be launched promptly and handled properly.
(3) Raise requirements and pay attention to methods. To deal with severe weather, we need to pay attention to methods and methods, especially when clearing snow and ice, manual cleaning is the main method. Snow removal should be carried out in a timely manner to ensure that roads are open in the snow and clear when the snow stops. When clearing snow, there should be no leakage, no ice accumulation, no residual snow, and the bottom of the road surface. We must attach great importance to safety work, strengthen safety education for cadres and workers, and prevent accidental injuries to vehicles and personnel. Rain and Snow Emergency Plan 2 for Sanitation Workers
In order to prepare the city’s education and sports system to prevent rain, snow, freezing and severe weather, and to ensure the safety of teachers and students’ lives and property, in accordance with the "People's Revolution of the People's Republic of China and the National Emergency Incident Response Law", the Hebei Provincial People's Government's "Opinions on Comprehensively Strengthening Emergency Management Work" (Jizheng No. 20xx24) and the Botou City Education and Sports Bureau's "Botou City Education and Sports System Emergency Response Plan", combined with the requirements of our Based on the actual situation of the city, this plan was formulated.
1. Guiding ideology
Guided by the spirit of the "18th National Congress" and based on the national, provincial and municipal "Safety Production Law", in order to protect the lives of teachers, students and employees Taking property safety as the goal, we actively carry out various preventive and response work to deal with the severe weather of rain, snow, ice and ice to ensure the smooth development of various education and teaching work in winter and spring for primary and secondary schools and kindergartens in the city.
2. Working principles
Unified command, hierarchical management, overall linkage, and implementation.
3. Basis for preparation and scope of application
This plan is based on the "Emergency Response Law of the People's Republic of China" and the "Regulations on Strengthening Emergency Management" of Hebei Province and Cangzhou City "Work Opinions" and other relevant regulations are formulated and apply to all primary and secondary schools and kindergartens in the city.
4. Organizational Structure
(1) Leadership Organization
The Botou City Education and Sports Bureau established a headquarters to prevent rain, snow, freezing and severe weather disasters
Commander-in-chief: Chen Lei
Deputy commander-in-chief: xx
Members: heads of departments of the bureau, principals of primary and secondary schools, and kindergarten directors
(2) Operation management organization
The Botou City Education and Sports System Management Office (Safety Department) for the prevention of rain, snow, freezing and severe weather disasters was established to be responsible for the business guidance and reporting of daily rain, snow, freezing and severe weather disaster prevention work , information communication work.
Person in charge: Deng Yong
(3) Emergency measures
1. Implement the top leader responsibility system
(1) The main leader of the Education and Sports Bureau is responsible for the overall work, and the leaders in charge provide specific guidance to primary and secondary schools and kindergartens for implementation.
(2) Members of the Education and Sports Bureau team will do a good job in the implementation of the covered primary and secondary schools and kindergartens.
(3) The principals or principals of primary and secondary schools and kindergartens are responsible for the implementation of various tasks in their units.
2. Primary and secondary schools and kindergartens must promptly understand and deal with potential safety hazards caused by rain, snow and ice, including school buildings and other building facilities, carports, basketball hoops, bulletin boards, flagpoles, wires and other equipment and facilities, flowers and trees, etc., and repair any damage in a timely manner .
3. Implement a one-day reporting system for disasters.
The Education and Sports Bureau office communicates with higher-level governments, competent departments, and meteorological departments in a timely manner to understand and release early warning information. The offices of primary and secondary schools and kindergartens have designated personnel responsible for the transmission of telephone and online information. Once a disaster occurs, it will be reported step by step in the shortest possible time to provide quick and effective support for command decision-making.
(4) Early warning levels
Snow disaster early warning signals are divided into three levels, represented by yellow, orange and red respectively.
1. The meaning of the yellow warning signal: Rain, snow and ice that may affect traffic may occur within 12 hours.
2. The meaning of the orange warning signal: Rain and snow that may have a greater impact on traffic may occur within 6 hours, or freezing rain and snow may have a greater impact on traffic and may continue.
3. The meaning of the red warning signal: Snowfall that has a great impact on traffic may occur within 2 hours, or rain and snow that has a great impact on traffic has already occurred and may continue.
(5) Emergency response
1. General (Level III). All primary and secondary schools and kindergartens report to the Municipal Education and Sports Bureau office, and the top leaders and leading groups of each unit will respond according to the disaster situation. Concretely implement emergency command work.
2. For more severe cases (Level II), all primary and secondary schools and kindergartens should report to the Municipal Education and Sports Bureau office and the Rain, Snow and Freeze Disaster Prevention Headquarters, which will be personally directed by the deputy director in charge and the principal of each unit. , the principal assists in emergency rescue work.
3. Serious (Level I), all primary and secondary schools and kindergartens should report to the Botou City Education and Sports System Blizzard Disaster Prevention Headquarters as soon as possible, and the Education and Sports Bureau will be responsible for the rain, snow, freezing and severe weather disaster prevention command. Under the unified command of the Ministry of Emergency Management, the principal and kindergarten director actively assisted in emergency disaster relief work.
(6) Emergency response
1. All primary, secondary and kindergarten schools should formulate school safety emergency plans for severe weather and promptly grasp early warning information of rain, snow and ice. Make correct judgments in a timely manner based on early warning signals at different levels, and notify parents of students through various methods. When bad weather such as rain, snow, freezing weather affects students' normal access to and from school, with the approval of the Education and Sports Bureau, the school can adjust schedules, take safety measures such as suspending classes, ending school early or late, notifying parents to pick up and drop off, and escorting teachers.
2. All primary and secondary schools and kindergartens should contact parents in a timely manner when there is a sudden change in weather or the disaster level signal is red. They must make correct judgments as soon as possible and follow up immediately. Make timely adjustments to changes in weather. At the same time, report to the Municipal Education and Sports Bureau in the shortest possible time.
3. All primary and secondary schools and kindergartens should increase the management of vehicles for picking up and dropping off students, especially the investigation of road conditions before and after the onset of bad weather to prevent traffic accidents.
4. After the freezing rain and snow, all primary and secondary schools and kindergartens should immediately carry out self-rescue and disaster reduction work, promptly organize faculty and staff to clean up the snow on campus, and ensure smooth passages for students in the school. Warning signs are set up in important parts of the campus, and people in high-risk parts are evacuated and sealed with cordons and protective nets. When necessary, dedicated personnel are placed under supervision to ensure nothing goes wrong. At the same time, various forms of safety education activities should be carried out to further enhance the self-prevention awareness of teachers and students.
5. Strengthen prevention of rain, snow and freezing disasters. Take effective measures to prevent damage to roofs, bulletin boards and other facilities.
5. Work requirements
1. Primary, secondary and secondary schools and kindergartens should strengthen on-duty and security work during rain, snow and freezing periods, so that there are people on duty 24 hours a day. The main leaders of the unit and the leaders in charge must maintain smooth communication 24 hours a day.
2. Conduct safety hazard investigations to prevent secondary or other safety accidents.
3. Strengthen the management of special vehicles for transporting students to prevent traffic accidents.
4. Implement the accountability system. Leaders of each unit must do a good job in the implementation of various tasks. For those who cause adverse consequences due to dereliction of duty or poor management, the Education and Sports Bureau and relevant departments will seriously hold the relevant personnel accountable for their administrative responsibilities.
6. Implementation time of this plan
This plan will be implemented from the date of release. Rain and Snow Emergency Plan for Sanitation Workers 3
1. Emergency Reporting Procedure
In order to do a good job in safe production under severe weather conditions such as rain, snow, fog, ice, etc., a leading group has been set up to The top leader is the commander-in-chief, and the leaders in charge are deputy commanders-in-chief. The members are composed of the station chief on duty and the heads of various departments. They are responsible for implementing the safety situation under severe weather conditions, arranging their respective work, and implementing the "one post, two responsibilities" responsibility system , with dedicated personnel on duty around the clock (24 hours a day), and are never allowed to leave or leave their posts. Once an emergency occurs, it must be reported to the superior authority and relevant leaders as soon as possible, and follow the instructions to do this work well. In case of rain, Safety work in severe weather conditions such as snow, fog, ice, etc. and handling of train departures at the station to prevent the occurrence of road traffic accidents.
2. Emergency Command Group
In order to effectively carry out safety production work under severe weather conditions such as rain, snow, fog, ice, etc., prevent the occurrence of various accidents, and do a good job in source management , a production safety emergency leadership group has been specially established under severe weather conditions such as rain, snow, fog, and ice:
Commander-in-Chief: Liang xx
Deputy Commander-in-Chief: xxxx
< p>Su Hongzhi and Feng Xiaobing (Police Station)Members: stationmaster on duty and heads of various departments
All work arrangements shall be followed by the commander-in-chief, responsibilities shall be clear, division of labor shall be clear, and responsibilities shall be assigned to each person. All departments must cooperate with each other and do a good job in emergency response. We must proceed from the perspective of implementing the scientific outlook on development and promoting social harmony and stability, and in a spirit of being highly responsible for the safety of people's lives and property, and attach great importance to the impact of rain, snow, fog, ice and other severe weather on road transportation. In the event of severe Weather, immediately activate the plan, implement various preventive measures, ensure that the work, personnel, and measures are in place, and effectively carry out disaster prevention and relief work to ensure social harmony and stability.
3. Emergency response measures
Under severe weather conditions, we must do a good job in safety production at all parts and stations, overcome paralysis and fluke mentality, and implement regular vehicle inspections, "Three-product" inspections, safety education, regular safety meetings and safety management systems and various safety measures, intensify the investigation of potential safety hazards, conduct self-examination and self-correction from the aspects of systems, vehicles, personnel, etc., do a good job in safety instructions, and enhance the awareness of employees Safety qualities. It is necessary to strengthen contact with the meteorological, highway, and traffic police departments, keep abreast of weather and road conditions and other information, and do a good job in explaining, placing, and evacuating passengers. Various information must be announced in a timely manner according to severe weather conditions. According to the requirements of each centralized management department, responsibilities must be clear and measures must be in place. In particular, safety inspections during severe weather periods such as rain, snow, fog, ice, etc. must be carried out and organized. Human resources conduct safety inspections on all departments of the center to ensure nothing goes wrong, do a good job in safety publicity, and implement various rules and regulations of the center to ensure that the center's safety work develops steadily.
4. Work requirements
Raise awareness and strengthen leadership. It is necessary to fully understand the extreme importance of safety work under severe weather conditions, enhance the sense of political responsibility and mission to do a good job in this work, and proceed from the overall situation of maintaining the comprehensive, coordinated and sustainable development of the transportation industry, and effectively strengthen the leadership of prevention work, Ensure that all preventive measures are implemented. Rain and Snow Emergency Plan 4 for Sanitation Workers
In order to ensure the safety of teachers and students, the following emergency plan has been formulated for rain, snow and freezing weather:
1. Leadership Group
Team leader:
Deputy team leader:
Team members: Grade head teacher
2. Safety measures and requirements
1. Team The leader and deputy team leader pay attention to the weather forecast and prepare anti-slip carpets, industrial salt, shovels, push handles and other items in advance. Once rain, snow and freezing weather occur, activate this emergency plan and adopt measures such as eradicating, spreading salt, and laying anti-skid carpets. , eliminate slippery hazards in dangerous areas and prevent falling injuries.
2. In the event of freezing rain and snow, the teachers and head teachers of each grade should educate students to pay attention to safety, and organize students to complete the task of shoveling frozen snow in specified areas according to task arrangements. The tasks are assigned as follows: the first graders in high school are responsible for all the roads outside Xiangshan Building and Zhenmei Building, and the front and rear steps of the comprehensive building; the second graders in high school are responsible for the roads between Qiuzhen Building and the canteen, and the one between the teaching building and the comprehensive building. The second-floor passage; the third-year students are responsible for the passage inside the lecture hall and the three- and four-story passages between the teaching building and the comprehensive building. Slippery areas not covered will be subject to arrangements and instructions.
3. On freezing, rainy and snowy days, administrative personnel and grade-level personnel on duty should strengthen inspections and go to the exit of the teaching building and the school gate 15 minutes before school is over to guide students to safely and orderly distance themselves.
4. When encountering rain or snow, each class teacher should notify day students in advance not to ride bicycles or electric scooters to school.
5. For unfinished matters, the emergency notice issued by the Xx China QQ platform on that day shall prevail. Rain and snow emergency plan for sanitation workers 5
In order to strengthen school safety work, ensure the safe work of teachers and students, create a harmonious campus, prevent safety accidents in rain and snow weather, and handle emergencies quickly, timely and properly incidents, effectively reducing the occurrence of safety accidents in rain and snow weather. In accordance with the relevant requirements of superiors and relevant laws and regulations, this plan is formulated based on the actual situation of our school.
1. School Rain and Snow Weather Safety Leading Group
Team leader:
Fully responsible for campus rain and snow weather safety work, the first person responsible for campus safety.
Deputy team leader:
Team members:
2. Safety work measures
1. All administrative personnel on duty that day are present at work , should arrive at the school gate and teaching stairway half an hour before school is over, and guide and organize students to leave the teaching building and school gate safely and orderly.
2. Relevant personnel of the safety leadership team are on duty. When encountering rain or snow, students of all grades should be notified in advance to leave school early. They should organize and guide students to leave the campus safely at the gate, and guide parents to stand on both sides of the gate. Picking up students and picking up students. The specific early dismissal time for each grade is: 20 minutes early for first and second grade students, and 10 minutes early for third, fourth and fifth grade students. Each class shall strictly implement the regulations after receiving the notice, otherwise the parties involved will be held accountable.
3. All class teachers and on-duty staff are on duty. There should be a clear division of labor at the teaching building and the gate, each performing its own responsibilities, and organizing and guiding students of this year to leave the campus safely and orderly.
4. If there is a snowstorm before going to school that day, you will not go to school and study at home.
5. For unfinished matters, the emergency notification of the day shall prevail. Rain and Snow Emergency Plan 6 for Sanitation Workers
This plan is applicable to the situation when there is a sudden rain or snow when the school is about to end, students do not bring rain gear, and a large number of parents gather at the school gate to pick up students. (If there is continuous rain or snow, parents and students have been prepared to deal with it, and the school will implement regular arrangements for dismissal from school.)
(1) Arrangements for parent entry and exit directions at each school gate
1. East Gate: All parents enter through the east gate. After receiving their students, parents can choose to go through the east gate or northwest gate according to their personal circumstances.
2. Northwest Gate: Only parents and students are allowed to leave the school. Parents are prohibited from entering the campus through this gate.
3. North Gate: When school is about to end and there is sudden rain or snow, the North Gate will be closed.
(2) Arrangements for the staggered dismissal of each grade
1. The head teacher of each class organizes students in the classroom according to the unified arrangements broadcast by the brigade headquarters; students are not allowed to be on duty or individually International students stay on campus for tutoring and other reasons.
2. The brigade headquarters uses the broadcast system to notify relevant grades and parents at different times according to the school's scheduled school dismissal time.
3. Parents at the school gate must follow the school’s broadcast requirements and enter the teaching building to pick up students at different times.
4. If parents arrive late, the class teacher should organize the relevant students to wait in the classroom.
(3) Other precautions
1. Guidance on the use of rain gear: In order to prevent students from becoming sharp due to individual rain gear, parents are advocated and encouraged to equip students with raincoats.
2. For students who use umbrellas, remind students to do the following three points: first, they must close their umbrellas when entering the teaching building; second, when holding an umbrella, the tip of the umbrella should be pointed downward; third, it is strictly prohibited Rain gear slapstick.
3. If there is continuous rain or snow, parents and students are ready to deal with it, and the school will implement regular school dismissal arrangements.
;
- Previous article:Have blain blain on the face, what method is simple and useful?
- Next article:Which season is the best for traveling in Wuhan?
- Related articles
- The postcode of tengxian, Guangxi.
- Weather in Nanjing 20 12 (from the first day of the first month)
- How long does it take to climb up Pingyuan Xiangshan Zeng?
- What is the experience of living in yurts in Hulunbeier grassland?
- How long is the heating time in Siping in winter?
- What climate type does Zhejiang belong to?
- Canon printer 24-hour maintenance telephone (national direct-sale store)
- Does English become an adjective by adding y after the weather? What's the difference between this and the original words? How to use it? If it's to answer today's weather,
- Is Datong City, Shanxi Province suitable for installing air conditioners?
- Where should I go if I want to play with water during the holiday?