Traditional Culture Encyclopedia - Weather forecast - 202 1 model essay on work summary of excellent architectural engineers

202 1 model essay on work summary of excellent architectural engineers

As an excellent builder, you should learn to make a work summary, so how to write a work summary? The following is the 202 1 model essay on the work summary of outstanding architectural engineers that I shared with you for your reference.

202 1 model essay on work summary of excellent architectural engineers? The work in the first half of 20xx has been completed. According to the actual situation of my own work, I analyze and evaluate my own work, sum up the experience and lessons, and put forward the improvement methods, so as to develop strengths and avoid weaknesses in my future work and provide a basis for continuously improving my working methods and improving my work efficiency.

? As a technician, my job orientation is to assist the technical director and constantly enrich myself. In participating in the construction project, while completing the survey and setting out of the project construction, I also assisted the technical director in compiling the construction scheme and technical disclosure, and was responsible for the guidance and compilation of the engineering technical data, conducted on-site quality inspection with the builder, and assisted the safety officer in implementing, supervising and inspecting the safety work on the construction site.

? In the process of engineering construction, I have always taken my work seriously with a positive attitude, and I can do my duty in all the work in order to complete the task successfully. "Don't rush to make achievements, bury your head in work" is my work motto, reminding yourself not to aim too high, to be down-to-earth, to do more practical things, to test your knowledge in practice and to accumulate experience in the construction site.

? The work on the construction site made me deeply understand that what I learned in school, what I learned by rote through norms and procedures, is far from being solid with actual experience. A lot of knowledge can't be learned in books, and it is entirely based on my own experience. In the past year, I have been reading and studying more. When you meet something different from the book on the construction site, consult the technical director and foreman humbly in time. Although sometimes I can't get a theoretical explanation, it's a good experience. When I first started working, I felt that the technical data work, measurement work and quality inspection work were relatively simple, but I actually learned a lot and always felt that I could. It is only when you actually operate that you find your own shortcomings, often with half the effort and lack of efficiency. Now that we have more practical operations, mastered methods and gained experience, we will be handy. For example, in measurement, it is important to do its key work well. Personally, the key work in measurement is to choose the best measurement scheme and carry out retest to avoid human error.

? In addition, taking the technical disclosure work as an example, it is not simply to write the disclosure, but to give it to the labor construction team for signature to complete the work. However, after the written disclosure is completed, the workers need to be tracked and inspected in the actual construction process. If it is found that the workers have not carried out the construction according to the technical disclosure or not completely, they should be patiently explained and guided to make the partial projects in place, avoid rework, and ensure the construction progress and project quality.

? In engineering construction, safety is the main link that cannot be ignored. Based on the practical experience in the construction site in the past year, this paper briefly talks about safety issues. The most important thing is to establish a sense of security. First of all, the managers of the project department must have a strong sense of safety and responsibility. Only when the managers of the project department truly realize the importance of safety can they do this job well. If the management of the project department is lucky enough to do this work, it will be a fatal hidden danger for the safe construction of the project. Therefore, the project manager must understand the safety work from the bottom of his heart and put it into practice. For the labor service team, the first thing to do is to arrange a safety education and training after the workers enter the site, and at the same time make safety technical disclosure to the labor service construction team. These tasks will not be implemented until they are done. The management personnel of the project department should always check the safety work on the construction site, and strive to completely eliminate potential safety hazards in the bud. In terms of safety, special attention should be paid to the support of the frame and the safety facilities carried or worn by the workers themselves. Regularly supervise and check that workers must wear safety facilities before they are allowed to work on the construction site. In the process of erection of scaffolding, strict inspection must be carried out, and the construction team is required to set up facilities in strict accordance with the construction specifications or procedures to ensure that there are no potential safety hazards. Only after the acceptance of relevant departments can the next working procedure be carried out.

? 202 1 model essay on work summary of excellent architectural engineers

? This year is my second full year as an office worker. Civil engineer is my first job and a starting point of my career. I also cherish it and try to adapt to this position. Through a year of continuous learning and the help of colleagues and leaders, I have fully integrated into this big family, and my personal work skills have also been significantly improved. Although there are still some shortcomings in my work, it should be said that I have paid a lot and gained a lot in the past year, and I feel that I have gradually grown up. The work in 2008 is summarized as follows:

? First, after my unremitting efforts over the past year,

? Completed the arrangement and handover of the construction data of the first and second phases, the landscape and greening of the second phase, the preparatory work for the early start of the group, the group model house project and other work entrusted by the company leaders.

? 1, collation and handover of construction data of Phase I and Phase II projects

? In the first half of this year, the second phase of the project was successfully delivered to the owner. Before the handover of the project, the construction data must be sorted out and handed over. I carefully checked and consulted the construction materials of each building, and made every effort to ensure no leakage, no shortage, neat catalogue and complete information. Before handing over the second phase of the project, I will prepare all the floor plans, warranty certificates and instructions for use of Building 13 in advance, and fully guarantee the owner when handing over the house. All the filing materials of Building No.2 13 were sorted by myself, and all the sorting work was successfully completed before the handover under the guidance of the leaders. After the delivery of the house, due to the excessive and important information, it needs to be handed over to the company's archives for safekeeping. At the time of handover, I will rearrange more than 100 boxes of data of 30 buildings in Phase I and Phase II, so that each one is recorded, and any information can be found in a directory. During the period, I spent a lot of energy and nearly a month, and finally I didn't live up to the leadership's entrustment. All the materials have been rearranged

? 2. Landscape greening project of Phase II project

? At the beginning of the year, I took over the landscape greening work of the second phase project. Compared with modern residential areas, the proportion of landscaping work is very small, but it is of great significance. It is indispensable for modern new living areas. Due to full preparation, the second phase of landscape greening is progressing smoothly.

? However, in the later acceptance process, the change of seedling size brought great trouble to our acceptance work. Finally, I cooperated with the technical department to check the types, quantities and specifications of all seedlings in place. Finally successfully completed the work entrusted by the leaders.

? 3. Engineering

? At the beginning of September, I received instructions from the leader. It is necessary to set up a model house for C. In the case of the national real estate recession in 20xx, it is a microcosm of a wise decision to form a group of company leaders to start construction and build this new apartment. Its quality directly affects the sales performance after the opening of three-dimensional superposition, and it is also a new measure of the company after the sales situation of Group B is not optimistic this year. Its success or failure directly affects the success or failure of the company this year.

? After receiving the instructions from the leader, I quickly threw myself into practical work. In order to achieve the expected effect, I positioned and paid off three times in two days, and finally achieved the expected effect of the leader. In the process of construction, I am not afraid of hard work, work hard and strive to get to work on the spot. After work, I need to work overtime many times because of the project. Later, due to the intervention of decoration companies, this requires good coordination and organizational skills. Try to deal with the friction and contradiction between the two sides in the construction process. Finally, the model house project was successfully completed before the opening. It has made due contributions to the company's impressive sales performance and turning losses into profits after opening.

? After the successful opening, I cooperated with the technical department. Participated in the final accounts of the later model houses.

? Second, the past year's work experience

? 1, keep a good attitude and a positive working attitude. As a member of "",I consciously abide by the company's rules and regulations and obey the work arrangements of my superiors; With absolute loyalty to the company, put into all the work, take the company's business as your own, and actively think about site construction management and coordination according to the actual situation on site, instead of waiting for the leader to arrange it. Invest in all work as a master, and maintain the company's image and interests from being damaged.

? 2. Integrate yourself into the company, and rely on the collective wisdom and strength to complete all the work. In many of the work I have completed this year, I have received support and help from leaders and colleagues at all levels.

? 3. After one year's work, I found that I still have many shortcomings: I don't have enough management in dealing with on-site affairs at work; I was not too careful in dealing with these problems. In the new year of 20xx, I will pay more attention to overcoming these problems.

? 20xx is a year of exploration, learning and progress for me. Faced with different work contents, I put my mind right, give full play to the initiative of my supervisor and think positively. In such a year, I enriched myself through my own labor and broadened my horizons through the opportunities given to me by my leaders.

? 202 1 model essay on work summary of excellent architectural engineers

? I have been in the company for almost half a year. With the strong leadership and care and support of the company leaders, I have made great progress in 20xx. In the course of my work, I successfully completed the annual work target of 20xx. 20xx's personal work is summarized as follows:

? I. Annual Work Situation

? 1, familiar with the rules and regulations of the company.

? I joined the company in 20xx 10. In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.

? 2. Be familiar with the structure and site conditions of the project.

? As a civil engineer, being familiar with and understanding the site is quite beneficial to the future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.

? 3. Participate in the modification of the management system of the engineering department.

? In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, referred to the relevant systems of well-known real estate enterprises such as ABO, and compiled and revised various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.

? 4. Analyze the weather in 20xx.

? In order to complete the company's project development task in 20xx, and make scientific and practical work contents and project construction progress plan in 20xx, I analyzed the weather situation in 20xx, and combined with the perennial weather situation in Wuzhi County, predicted the weather in 20xx. At the same time, I combine the weather conditions and the progress of the project, make reasonable adjustments to the progress of the project, grasp the construction season, avoid large-scale construction in the rainy season, and prepare for the rainy season and high temperature.

? Second, the existing shortcomings and improvement measures

? 20xx is about to die with the wind. Looking back on my work in the company in the past six months, although the workload is relatively large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:

? 1, lack of communication, unable to make full use of resources.

? In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with colleagues in other departments, share resources through the company's platform, and improve my business level.

? 2. Lack of planning

? In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.

? 3. The major is narrow.

? As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.