Traditional Culture Encyclopedia - Weather inquiry - What are the conditions for stopping work during construction?

What are the conditions for stopping work during construction?

In the process of engineering construction, there are usually the following situations that will stop work:

1. Weather reason: In case of severe weather such as gale, rainstorm, snowstorm or typhoon warning, the construction unit should take timely measures to stop work and do a good job in safety prevention.

2. Safety accident: In case of accidental injury, fire, explosion, landslide and other dangerous accidents, work should be stopped immediately to eliminate potential safety hazards and ensure the life safety of construction personnel.

3. Construction environmental pollution: If the construction waste is not classified as required in the treatment process, which will cause environmental pollution and other problems, it should also be stopped.

4. Unqualified materials: If it is found that the materials used do not meet the specified standards or contract requirements, it must be stopped for treatment to ensure the quality meets the requirements.

5. Before the completion acceptance: The supervision department found the problems that affected the acceptance before the completion acceptance, and needed to stop work for rectification.

Generally speaking, the shutdown conditions should be formulated according to the construction contract and relevant laws and regulations, and also need to refer to specific construction conditions and environmental factors as the basis.