Traditional Culture Encyclopedia - Weather inquiry - contract agreement
contract agreement
Contract Agreement 1 Party A: _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Party A is building a two-story kitchen, the first floor is about square meters, and the second floor is about square meters, which is contracted by Party B. ..
Based on the principles of equality, mutual benefit, honesty and credibility, both parties agree to sign this agreement through consultation to jointly abide by:
First, the contracting method.
Take the way of contracting without contracted materials.
Party A shall provide materials needed for the building, including: red bricks, river sand, stones, lime, cement, steel, water pipes, sewer pipes, nails, wires, water and electricity, etc.
Party B shall provide labor services, construction technology, construction tools and all production and living appliances.
Second, the construction project
Party B shall carry out the construction according to the design drawings or the requirements put forward by Party A. ..
Construction of Party A's main kitchen project, including walls, beams, columns, stairs, floors, formwork installation, formwork removal, steel bars, cast-in-place concrete, concrete cushion for floors and front steps; Paint the interior decoration, paste the front exterior wall tiles, brush cement mortar along the rear exterior wall, paste the bathroom floor and wall tiles, and install porcelain pots, sewer pipes and downspouts; The top layer shall be polished with cement slurry, and at the same time, it shall be well treated for seepage prevention and impermeability.
Third, the contract price
RMB in words: RMB _ _ _ per square meter, and the construction area is calculated according to each external wall.
The construction scope includes all the walls that need cement mortar plastering.
Four. mode of payment
After the contract is signed, the tools will enter the site and the personnel will be in place, and _ _% will be paid in advance, _ _% when the first floor is bricked and rammed, _ _% when the second floor and roof are completed, and 8000 yuan will be paid when the project is completed, with _ _% reserved.
Verb (abbreviation for verb) The responsibility of both parties.
Party A is responsible for the timely supply of water and electricity, the timely entry of raw materials and the daily lunch.
Party B must ensure the quality and progress of the project, carry out the construction according to the design drawings and Party A's requirements, save materials, take good care of them and not lose them.
Six, quality requirements
Party B shall organize the construction according to the national kitchen quality standards and requirements. If it is unqualified, Party B shall be responsible for rework, and the rework fee shall be borne by Party B or deducted from Party B's project payment by Party A..
Seven, pay attention to safety
Labor protection measures, construction protection measures in place, safe construction.
If Party B's construction personnel suffer work-related injuries due to their own reasons or Party B's inadequate safety protection measures, or others are injured due to construction, Party B shall be responsible for everything, and Party A shall not bear any responsibilities and expenses.
Civilized construction, pay attention to professional ethics, pay attention to cleanliness.
Eight, the time limit for a project requirements
The main project duration is _ _ _ _ (calendar days). From the date of signing this contract, Party B must complete the principal part of the project before _ _ _ _ _ _ _ _ _.
If Party B needs materials, Party B shall submit the plan to Party A in advance for timely preparation.
Nine, the later maintenance
The maintenance expenses arising from Party B's quality problems shall be borne by Party B, and the relevant compensation and responsibilities arising therefrom shall be borne by Party B..
X. others
Other matters not covered shall be settled by both parties through consultation, and shall be implemented in strict accordance with national and local standards.
This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Party A (signature) _ _ _ _ _ Party B (signature) _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Part II of the Contract Agreement Party A:
Party B:
In order to improve living and office conditions and enhance the external image. Party A plans to cover the color steel roof on the top floor of the office building. In order to clarify the rights and obligations of both parties and ensure the timely completion of the construction task, Party A and Party B hereby conclude this contract through consultation and abide by it jointly.
1. Project name: color steel roof construction project.
2. Project content and requirements: The front and rear center columns are made of 90cm hollow iron pipes, with a height of 2m and a middle of 2.3m, and the main beams are made of 5*8 square steel. Construction and installation of 4*6 square steel and color steel roof with beams.
3. Project location: the roof of the office dormitory building of rural credit cooperatives.
Four. Project duration: 10 days
Verb (abbreviation of verb) Contract price: the total project cost is 14986 yuan, and the tax rate is 6.5 1%, that is, 975.58 yuan, so the total price is 1596 1.58 yuan.
Payment method of intransitive verbs: After the project is completed, Party A shall pay the project payment in one lump sum within 7 working days;
Seven, engineering safety and security:
1. Party A shall provide barrier-free construction environment.
2. Party B must strictly abide by Party A's rules and regulations when entering the construction site of this project.
3, the construction site must conform to the requirements of the relevant provisions of the construction safety production.
4. Do a good job in the protection and migration of underground pipelines and unknown obstacles.
5. Party B shall actively take measures to ensure the safety of the construction area, and bear the responsibilities and expenses of possible production safety accidents in the construction area.
6, do a good job in civilized construction, do the work, material, site,
Eight. This contract is made in duplicate, one for each party. This contract shall come into effect after being signed and sealed by both parties. Matters not covered shall be settled through consultation.
Party A: Representative of Wanwu Rural Credit Cooperative:
Party B: Representative:
Date, year and month
Article 3 of the Contract Agreement: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A and Party B have signed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1. Party A agrees to handle relevant matters with Party B according to the time and conditions agreed in this Agreement. According to this contract, Party A shall double the down payment, and pay the interest of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Both parties agree that Party A shall directly pay Party B the purchase price except the bank loan, and pay it in installments according to the following terms.
(1) before _ _ _ _ _ _ _ _
(2) Before _ _ _ _ _ _ _ _ _ _
(3) Before _ _ _ _ _ _ _ _ _ _
3. Where Party B pays part of the house price by means of bank mortgage loan, the average monthly repayment amount of mortgage loan payable to the lending bank (hereinafter referred to as "the average monthly repayment amount") shall be paid by Party A, and Party B shall provide necessary cooperation, without returning it to Party A. ..
4. After Party A completes the execution specified in Article 2 (6) of this Agreement, both parties shall sign a separate termination agreement to terminate this Contract. After the termination of this contract, Party B no longer enjoys any rights of the house and related buildings under this contract, and Party A has the right to dispose of the house under this contract separately. Before the termination of the Contract, if Party B no longer requests to return the house or terminate the Contract, it may negotiate with Party A separately.
5. After Party A pays RMB _ _ _ _ _ _ _ _ ten thousand Yuan only to Party B.
6. Party A and Party B agree that the cancellation registration of this contract shall be handled within 15 days after Party A directly returns all the money to Party B. ..
7. This Agreement shall come into effect as of the first repayment of RMB _ _ _ _ _ _ _ _ _ _ _ _.
Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _
Representative (signature): _ _ _ _ Representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 4 of the Contract Agreement Party A: Party B:
ID number: ID number:
Tel: Tel:
Emergency contact:
Contact telephone number:
First, the basic situation of rental housing
This room is 4 rooms 1 hall with 2 bathrooms, with an area of 124m2. There are two master bedrooms, one of which is rented out to two secondary bedrooms (balcony with a bathroom).
Second, the lease term
From year month day to year month day.
Three. Rent standards and fees
1, standard: yuan/)
2, yuan, after the expiration of the contract, with deposit refund)
① Down payment: Yuan, date
② Second time: Yuan, date
③ Third time: Yuan, date
Pay rent one month in advance.
3. The expenses shall be borne by Party A (shared equally on a monthly basis)
Water, electricity and gas charges
4. One-time settlement fee:
Cable TV broadband
The damage of keys and things in the room should be compensated.
Remarks: in duplicate, one for Party A and one for Party B.
Party A: Party B:
Year month day:
Article 5 of the Contract Agreement: Lessor: _ _ _ _ _ _ _ _, hereinafter referred to as Party A. 。
Lessee: _ _ _ _ _ _ _ _, hereinafter referred to as Party B. 。
In accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations, in order to clarify the rights and obligations of Party A and Party B, the Contract is signed by both parties through consultation.
Article 1 Party A leases the house located in _ _ _ _ _ _ _ _ _.
Article 2 Term of lease
The lease term is * * * _ _ months, and Party A shall deliver the house to Party B on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
If Party B uses the leased premises for illegal activities, which harms the public interests, Party A may terminate the contract and take back the premises.
After the expiration of the contract, if Party A continues to lease the house, under the same conditions, Party B has the priority to lease it.
When the lease contract expires, if Party B really can't find a house, it can negotiate with Party A to extend the lease term as appropriate.
Article 3 Rent, Payment Term and Payment Method
Party A and Party B agree that the annual rent is _ _ _ _ _ _ _ _ _ _ years \u months \u days.
Article 4 The house shall be repaired during the lease term.
Party A shall regularly inspect the leased premises and its equipment, and maintain it in time to ensure that there is no water leakage or water inflow, and that the tee joints (indoor water supply, sewage discharge and lighting electricity) and doors and windows are in good condition, so as to ensure the safe and normal use of Party B, and Party B shall actively cooperate.
Article 5 Changes of both parties to the lease
1. If Party A transfers the ownership of the house to a third party according to legal procedures, this contract will continue to be valid for the new property owner without any other agreement;
2. When Party B needs to exchange rooms with a third party, it shall obtain Party A's consent in advance, and Party A shall support Party B's reasonable request.
Article 6 Party B must abide by the rules and regulations of the local temporary residence and pay the fees for water, electricity, television, telephone, sanitation and property management on time. Party B shall be responsible for all civil disputes. The water, electricity and gas levels are _ _ _ tons, _ _ _ degrees and _ _ _ degrees respectively.
Article 7 Party A shall collect a deposit of RMB yuan from Party B. When Party B returns the house, it shall pay the water, electricity and gas fees and return the keys, and Party A shall refund the deposit of RMB yuan.
Article 8 Liability for breach of contract
If either party fails to perform the terms agreed in this contract, the breaching party shall compensate the other party for the liquidated damages of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 9 exemption clause
1. If the house is damaged or Party B suffers losses due to irresistible reasons, Party A and Party B shall not be responsible for each other.
2. Neither Party A nor Party B shall be liable for the losses caused by the demolition or renovation of the leased house due to municipal construction.
If the contract is terminated due to the above reasons, the rent shall be calculated according to the actual use time.
Article 10 Dispute settlement methods
In case of any dispute during the performance of this contract, both parties shall settle it through consultation; If negotiation fails, either party may apply for mediation to the house lease management authority; If mediation fails, it may apply to the Economic Contract Arbitration Commission for arbitration or bring a lawsuit to the people's court.
Article 11 Other agreed matters
1.___________________________________________________________________________.
2.___________________________________________________________________________.
Article 12 Matters not covered in this contract can be settled by both parties through negotiation.
This contract is made in duplicate, with each party holding 65,438+0 copies. This agreement shall come into force as of the date of signature, and shall automatically become invalid upon expiration.
Party A (signature): Party B (signature):
ID number: ID number:
Tel: Tel:
Address: Address:
date month year
Article 6 of the contract agreement: Party A: xxx College, Youth League Committee, Association of Associations, Calligraphy and Painting Association;
Party B: * *
In order to support the complete success of the activities sponsored by the Painting and Calligraphy Association of the Communist Youth League Committee of the Academy, Party A and Party B have established cooperative relations within the scope of national laws, regulations and school rules through friendly consultation with the common goal of mutual support and mutual help. Specific matters are as follows:
(1) Description of funded projects
1. Project: Large-scale Painting and Calligraphy Exhibition of the 8th Culture and Art Festival;
2. Sponsorship content: part of the expenses during the activity;
3. Activity time: mid-to-late May of 20xx.
(2) The content of rewarding sponsors
1. On the occasion of the activity month of the Culture and Art Festival in May and during the painting and calligraphy exhibition, our institute will arrange a banner with the name of the sponsor, and the contents of the banner will be agreed by both parties. (content:);
2. A special sponsor exhibition area is set up in the activity area of the painting and calligraphy exhibition, and the exhibition content is related graphic materials provided by sponsors;
3. During the exhibition, the staff of our association will wear advertising clothes or promotional hats formulated by Party B for relevant publicity.
(III) Progress of project cooperation
1, Party A:
(1) As the organizer of the event, Party A plans, prepares and organizes the whole series of activities by itself to ensure the smooth progress of the whole painting and calligraphy exhibition. As the initiator of the series of activities, Party B is the object of helping and feeling the content of this activity, supporting and encouraging the development of university associations;
(2) Party B is responsible for making relevant publicity materials (banners, publicity materials ...) and providing relevant advertising clothes or hats, or Party B provides funds, and Party A assists in making and taking photos, hoping to ensure the smooth and orderly work of Party A, and Party A is responsible for relevant publicity;
(3) Party A shall ensure the smooth progress of the activity and keep in touch with Party B during the activity. If it can't be completed on schedule, Party B has the right to claim back the money;
2. Party B:
Party B has the right to ask about the progress of Party A's activities, and Party A must truthfully report it.
(4) Mode of expenditure
Party B: The sponsorship fee shall be paid in cash when signing the contract;
Party A: Ensure the reasonable use of sponsorship fees, and Party B can supervise the use of funds.
(5) supplementary provisions
1. The cooperation time of this agreement is from the date of signing this agreement to the end of the painting and calligraphy exhibition. After the expiration of the agreement, both parties will continue to cooperate and negotiate, and renew the contract as needed;
2. In the process of implementation, all disputes, objections and disputes that may arise due to unforeseen factors between the two parties can be resolved through consultation;
This agreement has two pages. At the time of signature, this Agreement is made in duplicate, one for each party, with the same legal effect, and shall come into effect after being signed by the signing representatives of both parties;
4. Attachment: activity plan;
5. The main person in charge of this activity of Party A:
Yang Qiuming: XXXXXXXXX Wang Dengke: XXXXXXXXX
Zhang Yanhua: xxxxxxx Ceng Tao: xxxxxxxxxxxx
Party A: Jiangxi Manufacturing Vocational and Technical College Youth League Committee Association Painting and Calligraphy Association
Party B:
Signature Representative: Signature Representative:
Date of signature: year month day.
Signature signature
Article 7 of the Contract Agreement: The Seller (Party A):
Buyer (Party B):
Party A has now transferred the car to Party B. The license plate number, engine number and frame number of this car are. This contract was specially signed.
Article 1 Automobile quality
The car was registered in, and the inspection period is until, and the maintenance fee is paid until the end of.
Because the vehicles traded by both parties are second-hand motor vehicles, both parties recognized the quality of vehicles such as body and engine conditions when signing the agreement.
Article 2 The price of automobiles
Both parties agree that the car transfer price is RMB.
Article 3 Rights and obligations
1. When transferring the vehicle, Party A shall provide Party B with various certificates and procedures of the vehicle, including:
2. Party B shall carefully check whether the vehicle certificates and procedures provided by Party A are complete, and carefully check and confirm the function and appearance of the purchased vehicle. After purchasing the car, Party B shall be responsible for the maintenance of the car and the payment of related expenses.
Article 4 Vehicle transfer
The vehicle must be transferred, and all the expenses required for transfer shall be borne by the parties concerned. Both parties go to the vehicle management office to handle the vehicle transfer procedures.
Article 5 Settlement Method and Term
After acceptance of the vehicle, Party B shall pay a deposit of RMB yuan to Party A first, and the remaining RMB yuan shall be paid to Party A in one lump sum after the transfer formalities are completed.
Article 6 Liability for breach of contract
Article 7 Dispute settlement
Disputes arising from this contract shall be settled by both parties through consultation. If negotiation fails, you can ask
The Arbitration Commission applies for arbitration (or brings a lawsuit to the people's court).
Article 8 This contract shall come into effect after being signed by both parties.
Article 9 This contract is made in duplicate, with each party holding one copy.
Party A (signature) and Party B (signature)
ID number ID number
Contact telephone number
Year, month, sun, moon, sun.
- Related articles
- How to dress in Beijing in the middle and late March
- What is the word warmth, sunshine, sunshine and warmth?
- What brand of mobile phone has a cloud picture of weather?
- The weather is getting hotter and hotter. What vegetables should I eat in summer?
- What is the real reason for the plane delay?
- Why is the direction of monsoon not affected by trade winds?
- The "rain" of the proverb "Three days of heavy fog, there will be heavy rain" is mostly caused by A. Convective rain B. Typhoon rainstorm C. Topographic precipitation D.
- How to keep fit in early autumn
- Technical points of Phyllostachys pubescens forest
- A 9-year-old child in Jiangxi drowned in the shallow water area of the water park. What caused this tragedy?