Installation method of polyurethane sandwich panel

The installation method of polyurethane sandwich panel includes ground preparation, construction preparation, frame structure assembly, polyurethane sandwich panel installation, aluminum alloy doors and windows matching installation and other steps. The installation method of polyurethane sandwich panel is introduced in detail below.

Ground preparation

The installation site should be cleaned and leveled first, and the ground should be paved with cement foundation or treated in other ways.

Avoid windy weather

When installing polyurethane sandwich panels, try to avoid windy weather, and rainy and snowy weather is not suitable for installing polyurethane sandwich panels.

♂? Construction preparation work

Construction preparation, construction personnel should be sufficient, and polyurethane sandwich panels and other accessories should be adequately prepared in the early stage.

Frame structure assembly

Assemble the frame structure and install the main beam of the wall frame. The installation of the main beam of the wall frame is a very important step, which should be completed seriously.

acceptance of works

After the main girder of wall frame is installed, the steel structure should be inspected and accepted by professional engineers to ensure safety and no danger before the subsequent construction can be carried out.

Polyurethane sandwich panel installation

Install the lower polyurethane sandwich panel. First, install the waterproof board at the bottom of the panel, and then install the board holder of the polyurethane sandwich panel. After installing the plate bracket, the polyurethane sandwich panel can be assembled on the wall frame piece by piece.

Matching installation of aluminum alloy doors and windows

After all the polyurethane sandwich panels are installed, the edge sealing plates are finally installed, and aluminum alloy doors and windows are installed on the covered simple board room.