Traditional Culture Encyclopedia - Weather inquiry - Summary of flood control work in 2022: 7 articles
Summary of flood control work in 2022 1
In order to do a good job in the flood control work of the company in 20xx, ensure the normal oper
Summary of flood control work in 2022: 7 articles
Summary of flood control work in 2022 1
In order to do a good job in the flood control work of the company in 20xx, ensure the normal oper
Summary of flood control work in 2022 1
In order to do a good job in the flood control work of the company in 20xx, ensure the normal operation of production and prevent accidents, our company held a regular safety meeting in time, arranged and deployed related work, made clear the requirements of flood control work and the main points of flood season work, and carried out the work in a down-to-earth manner in strict accordance with the flood season plan throughout the flood season, ensuring the smooth progress of all work in flood season. The work is summarized as follows:
First, attach great importance to and timely deploy relevant work.
In order to further clarify the responsibilities and implement the relevant work requirements, our company held regular meetings in time to emphasize the importance of flood control work and clarify the specific requirements and work priorities of our company's flood control work. All departments are required to conduct safety self-inspection on factory buildings, equipment and facilities, process pipelines, water supply pipelines and flood control materials in a timely manner in combination with the scope of work, and make good preparations for flood control. At the same time, according to the work requirements, formulate detailed flood prevention plans to ensure that the work is planned, required, targeted and guaranteed in the implementation process.
Second, strengthen leadership and establish organizations.
According to the relevant requirements of the Notice of the Head Office on Defining the Responsibilities of Flood Control Organizations and Members, in order to ensure the normal operation of the process, the safety of users' water use and the smooth and orderly progress of all work in flood season, our company established a leading group for flood control work in time. The responsibilities of each member were clarified, and the flood control tasks of various departments were refined.
Third, work hard and implement preventive measures item by item.
(1) Pay close attention to the change of inlet water quality, and adjust the process parameters reasonably to ensure that the outlet water quality reaches the standard.
(2) According to the requirements of flood control work, the line patrol personnel conducted a comprehensive inspection of all pipe networks and valve wells in advance, and timely checked whether the manhole cover was lost or damaged, effectively avoiding the safety accidents when the summer rainstorm came. At the same time, the staff are familiar with the specific location of the valve well while sorting out the pipeline network files and pipeline network inspections, which lays a good foundation for rapid handling of emergencies.
(3) Before the flood season, the Production and Operation Department conducted a comprehensive investigation on the plant structure and process piping. And strengthen the patrol in daily work, and make a detailed inspection of the rain leakage points after maintenance to ensure the safety of power distribution cabinets and equipment in each workshop. For workshops with underground structures, emergency items such as sandbags should be prepared in advance.
(4) Overhaul the power distribution system of the workshop, and conduct a comprehensive investigation and maintenance of the main electrical equipment and mechanical equipment of the workshop to ensure that all facilities and equipment are in good condition.
(five) regular and careful inventory of flood control materials, to ensure that the number of materials is accurate, intact and effective, according to the situation in a timely manner, and stored in the designated counter as required.
(six) regularly check the valve well and cable trench to ensure that there is no water in the valve well and the cable trench is dry.
(7) Maintenance personnel should regularly maintain emergency equipment such as wiring boards and self-use pumps to ensure normal use in case of emergency.
(eight) in strict accordance with the requirements of flood control work in flood season, the implementation of the 24-hour duty system, and do a good job in the necessary communication and reporting, supervision and inspection, coordination and cooperation.
Four, strengthen the management of flood season, do a good job of safety inspection.
(1) Incorporate flood control inspection into the weekly safety and health organization during flood control?
Check and timely check the allocation and storage of materials.
(2) When it rains, conduct a comprehensive inspection of the office building and workshop in time to ensure that there is no leakage and water accumulation in the structure.
(3) Actively carry out special self-inspection on flood control in accordance with the unified arrangements of the Head Office. In the flood control work, our company has enhanced the safety responsibility and flood control awareness of cadres and workers through active publicity and extensive mobilization. Through strict implementation of the plan and solid work, the normal production operation, safe water supply and stable and orderly work during the flood season are ensured.
Summary of flood control work in 2022 2 pages
Since the flood season began this year, the form of flood control has become increasingly severe. In order to minimize or eliminate the losses caused by unexpected events or accidents that may occur during the construction in the main flood season, according to the relevant provisions of the National Overall Emergency Plan for Public Emergencies, the Flood Control Law and the Flood Control Regulations, and the company's flood control work system, combined with the flood control situation faced by the construction project this year, our project department analyzes the safety patterns of this project during the flood season, makes flood control preparations for key parts, and formulates the flood control construction scheme and feasible scheme.
I. Guiding ideology and objectives
The guiding ideology of flood control and flood fighting is to implement the policy of safety first, constant vigilance, prevention first and all-out rescue. Strengthen the awareness of flood control responsibility, base on flood control and flood fighting, plan and arrange early, focus on flood control, pay close attention to weak links, and earnestly do all the preparatory work.
The basic goal of flood control and flood fighting is to promote the orderly and smooth construction of the project, ensure the safety of the project and prevent safety accidents on the basis of ensuring the safety and quality of the construction.
Two, the preparation of flood control plan and the implementation of emergency rescue drills.
The project department prepares the flood control and flood fighting plan, organizes emergency drills according to the needs of flood control, and at the same time, in view of the shortcomings in the drills, modifies and improves the flood control plan, laying a solid foundation for safe flood control.
Three, formulate and improve the flood control work plan and measures.
1, set up flood control organizations, perform their duties, and set up flood control duty. Set up a flood control team and carry out relevant knowledge education and training.
2. Strengthen the safety monitoring of unstable components.
3. Complete the flood control project construction according to the design requirements.
Fourth, equipment and material support.
1, earnestly implement the requirements of flood control work and make preparations for the management of materials and equipment;
2. Establish an account of emergency materials and equipment, and organize and implement flood control work, personnel, materials and measures;
3. Establish post responsibility system for flood control, duty in flood season, inspection and reporting system before flood season, and flood control materials management system.
Five, strengthen flood control and flood safety inspection, the implementation of flood control measures, to carry out special safety inspection.
During the flood season, the project department always combines construction safety management with flood control and flood fighting, inspects all construction teams, and arranges special personnel to patrol and inspect important dangerous parts regularly.
In a word, the project department earnestly performed its duties, actively implemented it, and successfully completed this year's flood control and flood fighting tasks, but there are still shortcomings, which will be corrected in future work.
Summary of flood control work in 2022 3
After the notice of the Municipal Water Affairs Bureau and the Flood Control Headquarters on doing a good job in flood control and flood fighting was issued, under the unified leadership of the Municipal Water Affairs Bureau and the Municipal Headquarters, with the active cooperation and strong support of relevant departments, after more than half a year of unremitting efforts, the tasks of flood control and flood fighting in our town were successfully completed. Looking back on the work in the past six months, we have focused on the following five aspects.
First, leaders attach importance to it.
After the notice was issued, our town government attached great importance to this and quickly put this matter on the agenda, and established the headquarters of the leading group for flood control in X town, with the mayor personally as the team leader to make overall arrangements for flood control and flood fighting. Members of the leading group also include leaders in charge of flood control and flood fighting, water conservancy stationmaster and other backbones. The establishment of the leading group provides a reliable organizational guarantee for flood control work.
Second, strengthen publicity.
In order to do a good job in flood control, we attach great importance to improving the flood control awareness of the cadres and masses in the town. Since the notice was issued, we have intensified the publicity of the flood control law, grasped the implementation of the law from the aspects of good learning, good publicity and good implementation, strengthened the publicity and education on flood control, transformed the legal norms into the conscious actions of the broad masses of cadres and people, raised the people's awareness of flood control according to law, and effectively promoted the work of flood control and water conservancy according to law.
Third, the safety inspection
After the establishment of the leading group for flood control, we quickly studied the deployment and set up a special group to be responsible for the safety inspection of the whole town. Under the unified leadership of the municipal level, flood control stations, factories and dangerous houses in villages are mainly inspected comprehensively, and measures are taken immediately when problems are found, so as to nip in the bud.
Fourth, the implementation materials.
We strictly follow the requirements of our superiors and make good material reserves. After the notice was issued, we quickly conducted a comprehensive inventory of flood control materials in the town, supplemented the insufficient parts in time, and replaced the damaged parts as soon as possible.
Verb (abbreviation for verb) River check
We organized a huge flood control inspection team to inspect the rivers in the town one by one. The problems found in the inspection are mainly the influence of water peanuts on the smooth flow of water, and the responsible units are clearly defined to eliminate hidden dangers and weak links within a time limit. Take temporary safety measures to solve important problems that are difficult but affect flood control safety. Through the comprehensive improvement of small and medium-sized rivers in the town, the rivers are dredged, which provides an effective guarantee for flood diversion and flood discharge.
Although the flood control work in X years has come to an end, it is far from over. In the future work, we will continue to take flood control and flood fighting as a long-term task in accordance with the overall deployment and requirements of our superiors, from the height of practicing Theory of Three Represents, mobilize early, deploy early, check at all levels, pay close attention to implementation, and make unremitting efforts to achieve flood control and water conservancy according to law, thus providing a good environment for economic and social development.
Summary of flood control work in 2022 4
Under the unified leadership of the county transportation management office, with the active cooperation and strong support of relevant departments, the flood control work of our school has successfully completed all tasks of this year's flood control work after four months of unremitting efforts. Looking back on the work in the past few months, we have mainly done the following work.
First, attach great importance to it and make careful arrangements
Driving school leaders attach great importance to safety training in flood season, and list this work as an aspect of the agenda of office meetings, which must be discussed at weekly regular meetings. Timely convey the instructions and requirements of the superiors for flood control work, put forward implementation opinions, set up a flood season safety leading group with the security department as the main body, carefully analyzed and studied the impact of summer flood season on traffic, defined the target responsibility, and put forward the requirements of "raising awareness, refining measures, putting management in place and implementing work". The establishment of the leading group provides a reliable organizational guarantee for flood control and flood fighting. The prevention ability is improved, and there is no drowning accident in which people are caught in the middle, which ensures the smooth progress of safe production in summer.
Second, increase publicity and raise awareness.
In order to do a good job in flood control, we attach great importance to improving the flood control awareness of all employees. Since the issuance of the notice, we have intensified the publicity of the flood control law, implemented it from the aspects of learning well, publicizing well and implementing well, strengthened the publicity and education on flood control, transformed legal norms into the conscious actions of employees, raised the awareness of flood control according to law, and effectively promoted the flood season work.
Three, seriously carry out inspection in flood season.
After the establishment of the leading group for flood control, we quickly studied the deployment and set up a special group to be responsible for the safety inspection of driving schools. Under the unified leadership of the principal, the vehicle, training facilities, circuits of various departments, warehouses, oil depots and power distribution rooms are mainly inspected, and measures are taken immediately when problems are found, so as to nip in the bud.
Four, the implementation of flood control team, equipped with sufficient flood control materials.
Seriously implement the grouping of vehicles and personnel for emergency rescue and disaster relief, and establish an emergency rescue team composed of business backbones of various departments. Rescue vehicles should be assembled quickly, and rescue personnel and materials should be transported unconditionally and without discount. And make a good material reserve. After the notice was issued, we quickly conducted a comprehensive inventory of flood control materials in driving schools, supplemented the insufficient parts in time and replaced them as soon as possible.
Five, strengthen the awareness of flood control, to ensure foolproof.
Driving schools focus on raising employees' awareness of flood control, making ideological preparations for long-term flood control, keeping a high degree of vigilance, overcoming paralysis and basing themselves on flood control. According to the requirements of the emergency plan, everyone should be fully prepared, obey orders, obey orders, keep in touch, and ensure that they can be pulled out, moved and done well at the command.
Six, to further revise and improve all kinds of flood control plans.
The preparation of various plans was further revised and improved, and the ability to prevent and respond to catastrophic floods was further improved.
Summary of flood control work in 2022 5 pages
As summer approaches, so does the flood season. In order to conscientiously implement the spirit of flood control instructions from higher authorities, ensure that teachers, students and school property are not damaged, and achieve "nip in the bud", we specially organized manpower to conduct a comprehensive self-examination of the flood control situation in the whole school. The self-inspection is now reported as follows:
First, self-check the system of school flood control leaders and emergency rescue teams.
The school has set up a leading group for flood control safety work and a flood control emergency rescue team, and implemented relevant responsibilities; We have achieved leadership, organization, unified coordination, command and responsibility. The arrangement is as follows:
1, members of the leading group:
Team leader: Tian Bing
Deputy Team Leader: Yin Kai
Member: He Zhengping, Shi Junfen, Zhu Zhengxian, Zhou Kaifu, Tan Chaoshan, Nie Jiubirao
2. Specific functions and responsibilities:
Tian Bing, the team leader, is the commander-in-chief of flood control and emergency rescue: responsible for unified dispatching and commanding comprehensive flood control and emergency rescue work.
Yin Kai, deputy head of the team, served as deputy commander of flood control and emergency rescue: in case of danger, a rescue team was sent to take charge of student management, and the class teacher was instructed to take timely measures to protect students' safety according to specific conditions.
Nie, head of the logistics support team: He is specifically responsible for the preparation and deployment of materials in flood season, as well as the flood control investigation before flood season, to ensure that emergency tools and spare materials are in place and sufficient before the flood comes. In case of danger, be specifically responsible for the flood dredging work at the school gate and drainage ditch to reduce the flood from entering the school gate.
The second is the self-inspection of flood control facilities in various places.
In order to ensure that there is no danger in the flood season, the principal organizes relevant personnel to conduct safety inspections throughout the school.
1. The security of the school building has been checked. After inspection, the situation is normal and there is no potential safety hazard.
2. The school electrical facilities, power supply and indoor and outdoor electrical lines were investigated, and the results were all intact, and there was no potential safety hazard.
3. Some facilities and drainage channels in the campus were investigated, and it was found that some drainage channels in the campus could not be drained normally. There are security risks.
4. Outside the back wall of the school, Song Hui Highway cannot be drained. When it rains, the road drainage directly flows to the school, which leads to the collapse of the school wall, which has serious security risks.
Three, self-inspection system, emergency plan and communication network.
In order to strengthen the responsibility and ensure the smooth communication in flood season, our school revised the relevant system and clarified the relevant responsibilities; In order to prevent the occurrence of dangerous situations in flood season, an emergency plan for flood control safety has been formulated. The school has worked out an evacuation plan for lightning protection and rain condition explanation, and earnestly implemented the risk removal work according to the layout requirements in the emergency plan. Each class has set up telephones between teachers and students (parents) and between schools and parents to ensure smooth communication during the flood season and the safe evacuation of students.
Fourth, strengthen flood prevention safety education for teachers and students.
Make full use of various forms such as teacher-student meeting, blackboard newspaper and theme class meeting. Conduct safety education on drowning prevention, lightning protection, rainstorm prevention and emergency escape for students, so that students can understand and master common sense of flood control safety. Combine daily emergency evacuation drills with flood control evacuation, improve students' self-protection awareness and preventive skills, and ensure safe flood season.
In short, through this self-inspection, our school has made preparations for flood control and danger removal from all aspects to ensure that no danger occurs during the flood season.
Summary of flood control work in 2022 6 pages
In order to implement the spirit of the flood control work conference held in the whole region on May 2 1, under the correct leadership of the company, we carefully arranged the deployment, implemented the flood control work plan, earnestly carried out the investigation of potential safety hazards, formulated countermeasures, and strengthened the supervision and inspection of flood control work. The flood control work in 20xx years is summarized as follows:
First, establish and improve the flood control mechanism and fully implement the responsibilities.
In order to do a good job in flood control, the company set up a flood control inspection team with the factory director as the team leader, the managers of all departments as the deputy team leader and the heads of all departments as the members, comprehensively deployed the key points of flood control work, defined the responsibilities and tasks, and issued a flood control notice. According to the spirit of the meeting, all departments have formulated emergency plans for flood control, formulated duty system for flood control, made preparations for flood control materials and equipment, and purchased corresponding spare parts according to the situation of trade unions and the nature of work. A comprehensive safety inspection was carried out for each workshop, and the hidden dangers found were rectified in time, and all the rectification was completed before the flood season.
Two, strengthen safety education publicity and training, improve the awareness of prevention and flood control ability.
In order to ensure the safety in flood season, combined with the actual situation of the company, we organized safety inspections before and during flood season, and strengthened the source inspection of transportation management, secondary maintenance, personnel qualifications, licenses and vehicle technical conditions, and whether the employees' awareness of safety hazards has improved. Every year, it is also hot weather in flood season. Vehicle spontaneous combustion occurs frequently. Does the driver attach great importance to it and strengthen the inspection of his own vehicle? Throughout the flood season, the Safety and Environmental Protection Department took the lead in inspecting the company's safety facilities, and found that five fire extinguishers failed, and organized personnel to replace and configure the five fire extinguishers in time. Punish the illegal acts that do not operate according to the regulations in the investigation, implement the rectification of potential safety hazards, and do a good job in safety production. Up to now, there has been no safety accident in the company during the flood season. In addition, the company often sends small knowledge of flood control safety to employees through short messages, and roots the flood control safety work in everyone's mind.
Third, do a good job in flood control to ensure flood control safety.
1, complete the pre-flood inspection.
From the beginning of June, the inspection team conducted a comprehensive pre-flood safety inspection of the whole factory and office area. The inspection adopts a combination of self-inspection and spot check. Each department first conducts self-inspection on the jurisdiction, and the inspection team conducts spot checks on important areas, and at the same time strengthens inspection.
2. Do a good job in rectification of hidden dangers.
The problems found in each inspection should be put forward at the weekly safety production meeting, and personnel should be organized to rectify hidden dangers in time. After the rectification is completed, the inspection team will review the rectification of hidden dangers to ensure that the rectification of hidden dangers is in place.
3. Revise and improve the flood control plan.
In order to further improve the flood control command system and working procedures, and constantly strengthen the flood control responsibilities of all levels and departments, according to the company's requirements and combined with the company's actual situation, the flood control plan was compiled and improved.
4. Do a good job in the storage of materials and equipment In order to do a good job in flood control, the company verified the materials stored in the warehouse after conducting a comprehensive inspection of the factory and office areas, drew up a spare parts procurement plan, and purchased them in time, which provided a guarantee for safe flood control.
5, do a good job of flood control on duty.
(1) The leading group is on duty every day to ensure that all employees of the project department are informed of the emergency situation as soon as they receive the call from the flood control duty.
(2) The factory arranges three people to be on duty every day, every 12 hours, so as to ensure that in case of emergency, we can get to the scene as quickly as possible, and notify the leaders on duty, especially in thunderstorm weather, so as to increase the frequency of inspection and be on standby at any time.
With the end of the flood control work, the company earnestly summed up the flood control work to ensure the smooth completion of the flood season safety work.
Summary of flood control work in 2022 7 pages
Since the beginning of this year, under the great attention and correct leadership of the district committee, district government and superiors, flood control in our district has adhered to the principle of "focusing on prevention, combining storage and drainage, scientifically dispatching, fully rescuing, ensuring safety and storing more water" and the principle of "limited guarantee and unlimited responsibility".
Focusing on the key points of flood control work, we should grasp the five key links of "flood control responsibility system, project construction, flood control plan, rescue team and rescue materials" to achieve six outstanding points. At the same time, we insisted on both flood control and drought relief, and achieved flood control, safety and drought relief. It ensures the safety of people's lives and property in the whole region and promotes the sustainable development of social economy in the whole region. The summary is as follows:
First, raise awareness, plan ahead and prepare for flood control in advance.
According to the forecast of the National Meteorological Administration, this year our region is in the rainy zone in the north predicted by the Central Meteorological Observatory. We have updated our concepts, adjusted our thinking, and determined the guiding ideology for flood control this year: adhere to the combination of eliminating pests and promoting profits, pay equal attention to open source and reducing expenditure, and simultaneously prevent floods and droughts, so as to realize the transformation from flood control to flood control. Carry out the working policy of "building is more important than prevention, prevention is more important than robbery, and robbery is more important than rescue", mobilize all social forces, actively prepare for flood control, ensure the safety of main river embankments in flood within the design standard, and take measures to ensure that no one dies in flood storage and detention areas when the flood exceeds the standard, and make every effort to minimize the disaster.
First, since the beginning of April this year, the Water Affairs Bureau has dispatched professional technicians to conduct a comprehensive inspection of the "four rivers and four dikes", 16 backbone channels, 26 culvert pumping stations, 1 rubber dam and 15 bridge in the whole district, registered the problems found in Hezhen, made clear the tasks and fulfilled the responsibilities. On the basis of full investigation and study, the first flood control engineering map in our region was drawn. Second, at the beginning of May, the leadership of the flood control headquarters was adjusted to make preparations for the flood control work conference in the whole region in advance. Third, a regional flood control work conference attended by township offices and district departments was held, and this year's flood control work was comprehensively arranged and deployed. At the same time, through radio, television, blackboard newspaper and other forms of extensive publicity, the broad masses of cadres and people have a full understanding and understanding of the severe situation of flood control this year, and have made full ideological preparations for doing a good job in flood control and disaster relief in the whole region.
Two, careful arrangement, careful deployment, flood control plan revision in place.
In accordance with the requirements of flood prevention, flood resistance, risk grabbing and disaster rescue, the flood prevention plan is detailed and practical, making it more operable. First, according to the actual situation of our region and referring to the relevant information of provinces and cities, the flood control plan of our region has been revised and improved, and the basic situation, flood control tasks and existing problems of major rivers, low-lying and waterlogged areas and urban areas in the region have been analyzed and clarified one by one. Second, the flood control implementation plans of rivers and flood detention areas in eastern Hebei Province under various conditions have been formulated, and the defensive measures under various flood conditions have been clarified. Thirdly, the flood control measures for flood detention area and Jiaoxi area during flood diversion period are formulated. Fourth, the emergency rescue teams and materials in each state are arranged in fixed points, sections and routes, and the tasks and responsibilities are implemented step by step to people, so that they are prepared, have measures, have places, have food, have supplies and have routes.
Three, reinforcement, careful construction, flood control project construction in place
In order to ensure the benefit of flood control projects, a number of water conservancy projects have been completed with high standards and high quality in our region. First, according to the requirements of the city's flood control index, before the arrival of the main flood season, the right bank reinforcement project of the river was completed on schedule with high quality, eliminating the flood control hidden danger in this section; The second is to repair and refuel the mechanical equipment such as the gate culvert pumping station of the district seat; Third, the East Fuyang Drainage Station, which undertakes the main drainage tasks in urban areas, has been put into trial operation; Invested more than 600,000 yuan to repair and replace the gates that were seriously damaged and directly endangered the safety of the city, and the equipment was repaired; Fifth, the "Three Rivers", "Four Embankments" and sixteen key rivers have been treated.
Among them, 42 ramps of Fuyang Xinhe left and right dikes were treated, 86 wolf nests and rat holes were filled, 43 dangerous sections of Fuyang left and right dikes were 6850 meters, dikes were filled 16, and 8 ramps were treated, totaling earthwork 17. According to the provisions of the flood control law, 396 wheat straw piles were cleared.
Emergency measures have been taken for dangerous workers and dangerous sections that cannot be handled in time. During the construction process, the governor and vice governor visited the construction site to supervise and guide and spoke highly of it. The completion of these projects has provided reliable engineering guarantee for flood control safety in our region.
Fourth, unity and cooperation, coordination and linkage, and the rescue team was set up in place.
In order to ensure that the dike will not burst in case of flood emergency, we have arranged 90,000 flood control teams, including 8 rescue teams10.6 million, 8 standing teams with 68,000 people, 2 reserve teams with 4,000 people and 280 standing flood control personnel. In addition, the district directly organized a 20xx mobile team, and the Armed Forces Department organized a 200-person emergency commando team and a 500-person reserve team to undertake emergency support for key river sections. Ensure that once a flood occurs, it can be pulled, rushed, resisted and won, and ensure that the flood control work in the whole region is foolproof.
Five, multi-party financing, pay close attention to implementation, flood control materials reserve in place.
On the basis of material preparation last year, we have greatly adjusted and improved the variety and quantity of emergency materials this year. In order to ensure that flood control materials are implemented, all township offices and relevant units have put them in place item by item according to the tasks assigned, and registered and listed the price list item by item, thus realizing the "three-fixed" responsibility system of fixed quantity, fixed location and fixed personnel. * * * Reserve 24,000 wooden stakes, 400 tons of wheat straw, 600,000 woven bags, straw bags and sacks, 60 tarpaulins, 9,300 reeds, 26 tons of iron wires, 20,000 wooden boards or door panels, 20,000 trees, 5,000 cubic meters of masonry, 0/00 tons of diesel oil, and 9,000 vehicles of various sizes.
Six, strengthen leadership, improve the organization, flood control responsibility system in place.
The members of the flood control and drought relief headquarters were adjusted after the decision of the district Committee and the district government. Responsible for the leadership, organization and coordination of flood control work in the whole region. The secretary of the district party committee is the political commissar, the district head is the commander, the executive deputy district head is the executive deputy commander, and the responsible comrades of the district party committee, district government and relevant departments directly under the district are members of the headquarters.
Township offices and units have also established corresponding flood control headquarters, and implemented four kinds of responsibility systems: first, according to the administrative jurisdiction, the whole region takes overall responsibility, and responsibility certificates are signed at different levels. If there is a problem at any level, the responsibility of the party and government leaders at any level will be investigated; Second, the leading members of the four teams at the district level lead the district direct departments to ensure the township responsibility system; Third, the responsibility system of protecting rivers, dikes and defense lines for leading cadres at the district level; Fourth, according to the division of labor of the government, the deputy head of the district government guarantees the responsibility system of the front line, the system and the unit, and truly bans the front line, with clear tasks and responsibilities in place.
Seven, size up the situation, actively fight drought, and win a comprehensive victory in flood control and drought relief.
In September this year, the precipitation in flood season in our region decreased obviously. In the face of drought, we plan early, start work early, formulate effective measures in time, organize technicians to analyze drought and rain conditions, and guide farmers to make full use of water-saving irrigation technologies such as pipeline water delivery, small border irrigation, sprinkler irrigation and drip irrigation to enhance drought resistance. At the same time, judge the situation, store water by camera, and dispatch the gates closed by the river gates to store water under the condition of timely grasping the local and upstream flood and rain conditions. At present, the water storage capacity of rivers exceeds130,000 cubic meters, which provides sufficient irrigation water for farmers and reduces the drought to a minimum.
- Previous article:Hand in hand with me and take Guangzhou Automobile Toyota iA5, which is brand-new after car washing, to visit the suburban park!
- Next article:Weather forecast for 30 days 15 days.
Question 1:B
Question 2:B
Test analysis:
Question 1: Weather refers to the specific situation of the near-surface atmosphere in a short ti
- Related articles
- When winter comes, what diseases do children get easily? How should parents prevent it?
- What is the optimum water temperature for raising koi fish? How often is it best to change the water?
- When are the seasons for sandstorms in Beijing?
- The weather in Lijiang, Yunnan is 65438+ 10 month.
- Where is the best air and environment around Chengdu?
- It's a beautiful day today. What's next?
- English grammar
- Poems describing Wannian Temple in Emei Mountain
- How to wear a woolen coat
- Where is Dingnan?