Traditional Culture Encyclopedia - Weather inquiry - Nanjing Line S1 operating hours, last bus from the airport

Nanjing Line S1 operating hours, last bus from the airport

Nanjing South Railway Station: First train 06:00, last train 22:40

Airport New City Jiangning Station: first train 05:57, last train 22:40

The last bus from the airport: to Nanjing South Station at 22:42, to Airport New City Jiangning Station at 23:18

The total length of Metro Line S1 is 37.3 kilometers, including 19.7 kilometers of underground section, 0.7 kilometers of transition section, and elevated section The section is 16.9 kilometers long; there are 9 stations, including 6 underground stations and 3 elevated stations; the train is composed of 6 B-type drum trains with a maximum operating speed of 100 kilometers per hour. It is operated by CRRC Nanjing Pu Manufactured by Town Vehicle Co., Ltd.

Extended information

Nanjing Metro Line S1 suffered a sudden failure today, causing extensive delays in the subway

Subway S1 at 6:37 am on February 4, 2019 In the downstream direction of the No. 1 Airport Line, a malfunction occurred at the Zhengfang Middle Road Station. At 6:57, a rescue vehicle pushing to the Zhengfang Xiangbei section also malfunctioned. Affected by the fault, the departure interval of the Metro Airport Line was extended to every 20 minutes, and measures were taken to clear passengers at Jiyin Station. The subway company arranged two buses to connect directly to the airport to ensure that passengers can return smoothly.

Affected by heavy fog, according to the latest weather forecast, Nanjing Lukou International Airport is expected to meet Category II takeoff standards around 9:30. The airport expressway is currently closed and the subway S1 line is out of order and is undergoing emergency repairs. It is recommended that you choose other modes of transportation. The Airport South Station City Terminal has increased its passenger bus capacity.

Baidu Encyclopedia-Nanjing Metro Line S1