As spring passes and autumn comes, time flies, and this stage of work is coming to an end. One thing that must not be forgotten is the summary of preparation work, so that we can better face the next stage of work calmly. So from what aspects should we write a work summary? The following is a summary of the work of outstanding supervisors that I have compiled for you. It is for reference only. You are welcome to read this article. Excellent Supervisor Work Summary 1

I graduated from Qindao College of Qingdao University of Technology and was fortunate enough to come to work in our company in July 20____. Looking back on my work in 20____, I strictly abide by the unit's policies. We must adhere to various rules and regulations, unite colleagues around us, care for each other at work, help each other in learning, and actively demand progress politically. As a supervisor, I must do my job well, study hard in business, and strive for excellence. In actual work, I have a high sense of responsibility and a strong sense of professionalism. I adhere to the principles of objectivity, fairness, and seeking truth from facts. I also constantly pay attention to my own technical skills. Through study, my personal technical level and working ability have been greatly improved. During the supervision process, my rigorous work style and excellent technical level have been well evaluated by the construction unit and the credibility of the unit has been maintained.

During the construction of the factory expansion project (Phase II) of ODIX Mechanical and Electrical (Qingdao) Co., Ltd., I constantly focused on learning and accumulating various knowledge, always putting pressure on myself, studying business hard, and learning new things. file, actively participate in the knowledge training and study of relevant superior departments, and further improve their professional level through theoretical study, which will be of better help for future supervision and quality management. They can be good at discovering problems and researching at work. problem, have certain technical expertise and business capabilities, be able to master national and local supervision technical specifications and standards proficiently, have greatly improved in the process of practice and continuous learning, and have a relatively thorough understanding of supervision specifications and standard descriptions , can skillfully apply supervision technical specifications and standard instructions to carry out project supervision work. There have been no major mistakes in the quality or supervision technology of the projects that have been supervised. In daily work, in addition to doing their own work well, actively Participate in training and study on the quality of engineering supervision technology to better enrich yourself and adjust your knowledge structure, make up for the deficiencies in your work, and constantly recharge yourself. Strictly require myself to delve into the business knowledge of engineering technology quality, and humbly ask peers and experts for advice when encountering problems that I do not understand. I feel that if a person does not learn, he will not make progress, he will not see his own shortcomings and deficiencies, and he will fall behind. The rhythm of the development of the times. Today's society is a society of knowledge and information. I deeply feel the important mission that history has given us.

Since I have been engaged in construction supervision, with my continuous efforts, I have strictly followed the design drawings and supervision specifications during on-site supervision. Strictly control the materials and process acceptance, and immediately make rectifications that do not meet the supervision quality requirements until the quality requirements are met.

The achievements achieved can only represent the past, but there is still a gap with the requirements of a qualified construction supervisor. I will use this as a starting point to strengthen the improvement of my overall quality in all aspects, and in my future work I will be more strict with myself. I will continue to work hard, continue to explore, and strive to make progress to bring my abilities to a new level and make myself a competent construction supervisor. During the supervision process, I carried out supervision work based on the principles of independence, impartiality and science, and implemented pre-, in- and post-process control of quality and progress to effectively ensure the quality of the project. In daily supervision work, always follow the following requirements:

1. Strictly control the quality of materials: after the materials enter the site, they are required to be stacked in batches and specifications, check whether their quality assurance information is complete, and check Whether the appearance quality meets the requirements of the specification, and at the same time, samples and materials are provided as required to witness sampling, inspection, and testing before it is agreed to be put into use.

2. Strictly control the process inspection and inspection: Every time the construction unit completes a process, it must be inspected and accepted. If it fails the first acceptance, it must be rectified. The construction of the next process will not proceed until it is qualified. , especially the acceptance of concealed projects, concrete pouring is allowed under certain conditions, including inspection of mechanical equipment, personnel, materials, proportion measurement, and water-cement ratio control. During the pouring process, inspections, standbys, and supervisory technical personnel are carried out to ensure quality control. The pouring plan is formulated in advance and strictly implemented after review and approval.

3. Strictly control safety: Supervise the supervision team at each regular meeting to "focus on safety production prevention and strictly implement safety production regulations." If safety hazards are discovered during supervision, the construction team will be notified immediately with a notice The unit made rectifications to ensure safe production so that there would be no safety accidents in the project.

4. Strictly control the project data and test blocks: from the start to completion, the project data and the project progress are synchronized, the standard maintenance test blocks are retained according to the specifications, the test blocks are maintained under the same conditions and witnessed in a timely manner Sampling, sending for inspection and testing.

5. Strictly control the project acceptance: after the completion of the project construction, the completion measurement and review will be carried out, the project data will be improved, and the construction unit will be actively assisted in the handover work to ensure that the construction unit and relevant departments are 100% responsible for the project being supervised. satisfy.

In my future work, I will make further efforts, focus on ideological and business learning, strive to adapt to the job, and make a personal contribution to the development of the company.

In __, under the correct leadership of the Municipal Maintenance Center, our branch closely focused on the work goals of the provincial company "13555" and the work ideas of the provincial maintenance center "12446", and unswervingly adhered to the " With the guiding ideology of "taking line maintenance work as the main line" and the concept of "the line is maintained by me, I __ the line survives", the maintenance force was carefully organized, the maintenance measures were conscientiously implemented, the maintenance quality was steadily improved, and the tasks assigned by the Municipal Maintenance Center were successfully completed. Our various tasks.

1. Adhere to line maintenance as the main line, conscientiously implement the eight-character policy of "prevention first, combined with prevention", "guarantee one, level two, improve three."

First of all, based on the "Star Civilization Assessment Methods" of the Municipal Maintenance Center, we formulated strict assessment methods through extensive democratic discussions to stimulate employees' sense of ownership and responsibility, and improve their initiative and consciousness to act according to rules and comply with regulations. nature, effectively activating employees' work enthusiasm and creativity, enabling employees to position themselves, further change their concepts, improve their awareness, and fully enter their roles according to their job responsibilities. At the same time, in terms of performance appraisal distribution, three grades A, B, and C are set up. Comprehensive assessments are conducted based on employees' work performance, implementation of rules and regulations, attendance and other indicators, and a system of "compare, learn, catch up, help, and help" is created for employees. In a "super" environment, employees have a broad platform to showcase their talents. People-oriented is an important prerequisite for doing all kinds of work well. Employees' work enthusiasm has increased, their thinking has improved, they are dedicated to their jobs and work hard. There is no job that cannot be done well. As long as their thinking does not slip, there are always more solutions than difficulties. Secondly, we have worked hard on the interaction and maintenance of public relations, and actively created a platform for the whole society to pay attention to long-term work. From the county party committee and county government to ordinary people in the countryside, they are all obliged to contribute to long-term work. . This year, we paid a return visit to the county-level line protection leading group 1________, actively contacted and communicated with the county-level urban reconstruction leading group, and discussed with the local urban construction bureau and water company on the relevant construction plans and arrangements for 2005 to ensure that the first and second Class optical cables are marked before construction and are guaranteed during construction. The density of markings is increased to effectively prevent the sudden occurrence of external obstacles. Since the beginning of this year, the branch's first and second-level optical cable rangers have worked tirelessly, taking advantage of the slack time to seize the opportunity to conduct home visits and track and collect large-scale machinery information. The return visit collection rate has reached 10_______, investigating, tracking, publicizing, contacting, The signing of the contract is completed in one step, and according to the "web-weaving" method, the coverage of line protection publicity is increasingly expanded. At the same time, timely rewards are given to those who have contributed to voluntary line protection, stimulating their enthusiasm for line protection, and making more efforts to extend the line protection network and ensure smooth lines. big contribution.

Third, attach great importance to prevention and ensure the safe and smooth flow of primary and secondary trunk lines. Whether the first-level trunk line is safe or not is not only related to the completion of annual assessment indicators, but also tests our maintenance level. It is the focus of the entire maintenance work. To this end, we firmly establish the awareness that no trivial matters are involved in primary and secondary trunk lines, strengthen line maintenance, patrols, door-to-door and external impact monitoring of primary and secondary trunk lines, and attach great importance to the key line locations of primary and secondary trunk lines. This time, personnel were organized to collectively carry out pre-inspection and pre-repair of the first and second level trunk lines. Throughout the year, 5942 pieces of first and second level trunk lines (weeding and soil cultivation), 608 pieces of promotional signs, 650 new signposts, and visible signs were repaired. The line is 50 kilometers long, laying the foundation for the smooth flow of the line.

Fourth, strengthen line management and improve the quality of local network maintenance. Firmly establish the concept of "maintenance is service", give full play to the advantages and levels of professional maintenance, and prevent and eliminate obstacles. Use the inspection system to monitor local network line inspectors and overcome their previous indifferent paralysis. Since most local networks are located next to coal transportation roads, it has a great impact on the safety of the lines and hidden dangers are everywhere. To this end, we have increased our efforts in maintenance and rectification. 389 kilometers of local networks have been renovated to meet standards, 75 poles have been replaced, and The hanging wires are installed at 689 locations, thereby improving the mechanical strength of the local pole network. In addition, we carried out special rectification work to "ensure safety and prevent interruptions", improved the management of technical data of the local network, strengthened the emergency repair of local network lines and the technical training of emergency repair personnel, and ensured the assessment indicators for the timely rate of line obstruction recovery of completion.

Fifth, carry out job training to continuously improve the technical quality of employees. Practice has proved that only skilled skills and excellent abilities can do all the work well. In order to adapt to the requirements of enterprise reform and development and gradually improve the technical quality of line workers, the first thing to do is "training", the purpose is to create a team with higher Line technical maintenance skills team. This enables them to familiarize themselves with the situation of optical cable lines within their jurisdiction, be able to skillfully use optical cable splicing test instruments and equipment, and be able to successfully complete optical cable repair and cutover tasks. To this end, our branch conducted two business skills training and acceptance work during the year. Employees They work hard and study carefully. During the training, they constantly summarize and draw lessons from experience, improve working methods, fully develop team spirit, help each other and promote each other, and the technical quality of employees is further improved.

Sixth, implement the emergency dispatch plan and increase the speed of emergency repairs.

The timely recovery rate of faulty service circuits is a major assessment indicator of the quality of line maintenance. Whether faulty service circuits can be restored within the specified time limit is also a major indicator of our maintenance level. To this end, on the one hand, we have strengthened our familiarity and mastery of emergency dispatch plans, strengthened cooperation with the maintenance department, and established circuit dispatch plans and operating procedures for each optical system. On the other hand, to enhance our ability to respond quickly to line interruptions, we organized three large-scale practical drills for organizational obstacle repairs during the year, focusing on team dispatches, machine and line coordination, circuit emergency dispatch, obstacle testing, optical cable emergency repairs and Practical operation ability and speed training such as on-site cutover and use of instruments and tools have improved the level of rapid emergency repair of obstacles, improved quality, and cultivated abilities.

2. Strengthen external surveillance to ensure smooth lines

Keeping lines smooth is the top priority of our work. With the increase in county reconstruction and road widening projects, external forces The workload of monitoring is getting bigger and bigger, and the frequency of line patrols has also increased. Since this year, Huairen has carried out road construction, farmland water conservancy infrastructure, natural gas pipeline laying, and Yingxian heating pipeline replacement. for this situation. Our surveillance personnel contacted and coordinated with the local government and construction units in a timely manner. Deputy Magistrate Wang of Huairen County Government and the CEO of Natural Gas went to the site to check with us where the construction site intersected with the optical cable, and personally warned the construction workers to ensure that Jingtai The safety of western and original large optical cables. They are also required to follow the arrangements of the long-term department on all line issues. In the subsequent construction, both parties cooperated with each other, and the construction and line protection were carried out smoothly at the same time. The planning and reconstruction of Shanyin County is large-scale and wide-ranging. For us to protect the line, it means a long front and many hidden dangers. For this reason, we have focused on increasing the intensity of protecting the county and carefully organizing line inspections and surveillance. Defend the force, actively contact each construction site, publicize the importance of optical cables, achieve a common understanding of maintaining optical cables, and ensure that the policy of "three eyes, five things, and four inseparations" is implemented to the letter. Strictly implement the external monitoring and reporting system of the Municipal Maintenance Center. Especially in June and July, Comrades Feng Zongxi and Zhang Yuxi braved the scorching sun and frequently shuttled across the two-kilometer-long front line of the county in high temperatures above 35 degrees, planting flags, drawing white lines, and increasing Signs, detailed records and guard logs, contact the branch in a timely manner, report the flow of personnel and machinery at the construction site on that day, and maintain close contact with the construction unit, grasp new situations in a timely manner, achieve early discovery and early stoppage, and ensure the safety of the line smooth.

3. Carry out various forms of line protection publicity activities

Since this year, we have carried out line protection publicity activities through various forms such as grouping, collective, and joint efforts. First, we increased the publicity efforts to the general public, distributed promotional materials, produced promotional banners, and responded to various questions raised by the public in a timely manner. Second, during the "5.17" Telecommunications Day, we cooperated with the Municipal Maintenance Center and the troops stationed in the same area to carry out large-scale line protection publicity and line protection law education activities along the lines under our jurisdiction. Huairen and Yingxian Netcom companies actively participated in the activities. this event. In Huairen, I paid a special return visit to Director Zhang of the Urban Construction Bureau. Manager Bai of Yingxian County Netcom Company specially invited a TV reporter to accompany the interview and record the video. The video was played at prime time that night, which had a good effect. The Shanyin South Ring Road has removed the nail that endangers the optical cable, which has effectively deterred illegal activities and ensured the safe and smooth flow of communication lines. The third is to increase the monitoring of large machinery, capture information in a timely manner, formulate reasonable measures, and take proactive measures to ensure that large machinery along the optical cable does not lose control or leak through the network, and conduct dynamic monitoring in an all-round and entire process. The fourth is to integrate the door-to-door work into daily maintenance and patrol work, integrate the door-to-door registration, signing of line protection agreements and line protection publicity, and carry out it anytime and anywhere, with good results. Fifth, we further increased our reliance on the government to protect cables. On June 21, county magistrate Zuo Zhongwei, deputy county magistrate Chen Yusheng, deputy director of the National People's Congress Wang Yuebang and other relevant unit leaders held an on-site coordination meeting to protect optical cables. At the meeting, Zuo Zhongwei The county magistrate particularly emphasized that in the process of urban reconstruction, the county party committee, county government and relevant unit leaders must attach great importance to protecting the safety of long-distance optical cables. Through this meeting, it shows that the local government has put the understanding of the importance of long-distance optical cables on the agenda, and has played an escort role in ensuring the smooth flow of long-distance optical cables. On June 22, Director Huang of the Shanyin County Urban Construction Bureau personally organized the heads of the urban construction team to come to our branch to hold a line maintenance meeting. The branch introduced in detail the route and exact location of the Jingtai West and Yuanda optical cables. We also focused on re-promoting the importance of protecting long-distance optical cables to those in charge of construction, asking them to promptly explain to front-line construction workers the importance and hazards of protecting optical cables, the serious consequences of damaging optical cables, and actively cooperate with the line affairs branch to carry out joint protection. Good optical cables will make due contributions to urban reconstruction and the smooth flow of long-distance optical cables.

4. Pay close attention to management, and ensure safe production.

Safety production is related to the overall situation and carries a heavy responsibility.

Our branch always adheres to the policy of "prevention first, safety first", conscientiously implements various safety production measures, strengthens safety production management, first of all, strictly implements the "Safety Production Law", and conscientiously implements "prevention first, safety first" In line with the policy, all employees of the branch have signed a "Work Safety Responsibility Letter", and the implementation of rules and regulations and the operation of operating procedures have been included in the assessment scope to resolutely prevent the occurrence of errors and accidents. In October, our branch, in accordance with the arrangements of the Datong Maintenance Center, while doing a good job in line maintenance, actively carried out safety production and public security fire warning education work, vigorously strengthened safety education for employees, and carried out safety production, public security and fire protection throughout the branch The knowledge answering competition improved employees' awareness of production safety and public security and fire protection. During line maintenance work, it ensured the safety of people, vehicles and lines without accidents. The second is to adhere to the regular supervision and inspection system, identify problems, immediately rectify them, and impose critical education or financial penalties on the parties involved to ensure safe production. The third is to educate employees to consciously abide by various rules and regulations and insist on daily safety production meetings. It is particularly emphasized that in the "three-line crossing", line inspectors must wear insulating shoes and safety helmets, and use a test pen to test before going up the pole to ensure that personal safety Safety. At the same time, line patrolmen's motorcycles are inspected from time to time to eliminate hidden dangers and prevent accidents. Outstanding Supervisor Work Summary 2

In March 2018, I was transferred to the laboratory of the First Resident Office of the Western Section of the West Transit Highway as a project supervision test and testing engineer. With the support of the leadership and the active cooperation of my colleagues, I , based on the principle of "strict supervision, enthusiastic service, impartiality, and meticulousness", we successfully completed this year's supervision test work. We now report this year's supervision work as follows:

1. The resident office entered the site Since then, in response to the needs of this project and the requirements of the contract conditions, we have actively purchased test equipment and instruments, installed, debugged, and calibrated them, and applied for temporary qualifications for the construction site. At the same time, we have continuously improved the test implementation details, supervision rules and regulations, and put various charts on the wall. , after acceptance by the Provincial Quality Inspection Station, it has the test conditions for the construction preparation stage. While building the resident laboratory, we will supervise and inspect the contractors' on-site test personnel and equipment to see whether they meet construction and contract requirements, as well as the progress of various tasks, and require contractors to establish and improve a quality self-inspection system to lay the foundation for a smooth start of construction.

2. Before starting construction, first, in accordance with the design drawings and specification requirements, conduct standardization and verification tests on various raw materials, concrete mix proportions, soil and lime soil standards proposed by the contractor, so that various indicators can be All meet the requirements of construction specifications and design drawings, providing reliable and accurate test basis for comprehensive construction.

3. Material quality control is the focus of our test supervision quality control. The prerequisite for qualified products is qualified raw materials. This is my most personal experience in highway engineering construction. Material factory quality certificate Checking the model, specification, date of manufacture, etc. of the materials imported from the site, contractor’s self-inspection and supervision sampling control, investigation and retesting of suspicious materials, etc. are the main contents of our daily material quality control work, and rejecting unqualified materials Enter the construction site.

4. Construction process control. Before the start of each sub-project or single project, the supervision and testing personnel shall inspect and confirm the concrete mix ratio before construction can be carried out. During the construction process, the workability of the concrete shall be observed at any time. , always within the scope of the design requirements to ensure the inherent quality of the concrete. The contractor and the supervisor simultaneously produced representative concrete specimens as one of the quality control indicators of the project.

The year of xxx is about to pass. Looking back on the supervision work in the past six months, the most profound thing I have realized is that to do a good job in supervision, you must be strict and conscientious, and have a strong sense of responsibility. No matter how complex the project is, as long as the supervisors can By meticulously performing their duties in accordance with construction specifications and procedures, they can fully grasp the dynamics of the entire project and control the quality of the entire project. At the same time, supervisors with high professional quality can provide advance warning for each process and link. , nip possible quality problems in the bud, and prevent links that may cause quality hazards in advance. These two points are of great help to our supervision work and will definitely promote our work. Although we have been working hard to do every job in a down-to-earth manner, there are still shortcomings. Inadequate control and supervision in the field and confusing filling in of internal information often occur. Based on the existing problems, we are reminded to continue to study construction specifications and test carefully. Procedures, familiar with design drawings, improve business level and own quality, strengthen supervision, increase the frequency of random inspections, keep abreast of construction trends at any time, and control construction quality.

With the strong support of the West Transit Highway Project Office and the Superintendent’s Office and the active cooperation of the contractor, we will continue to do a good job in the supervision and test work in 20XX. The tasks in 20XX are arduous and the project volume is large, which is very important to us. The test work requirements are more stringent, which requires each of our test personnel to control beforehand, eliminate post-processing, maintain a serious and responsible work attitude, have a strong sense of responsibility, be fully familiar with and master business knowledge and skills, and make up for the past In order to solve the deficiencies, we must strictly control the quality of engineering materials entering the site and the quality inspection of the construction site. We should be the patron saint of project quality and establish a good corporate image for XX Highway Engineering Technology Consulting Co., Ltd. in the western construction.

Excellent Supervisor Work Summary 3

1. Project Overview

The x county government business building project has a construction area of ??xxx square meters, a building height of xx meters, and a frame structure of 1st floor public building. The design period of the building structure is xx years, the safety level is Level 2, the seismic fortification classification is Standard Fortification (Level C); the foundation design level is Level C.

At present, since the construction of x County Government Business Building started on x, x, the basic engineering has been completed. The main structure will be capped at the end of June, and the second and third-story wall masonry has been basically completed. According to the project progress plan, the wall masonry of the entire project will be completed in June 20xx. Part of the plastering and part of the installation work will be completed by the end of this year.

2. Work status of supervisors

According to the requirements of the supervision service contract, after the two parties signed the supervision entrustment contract, the overall goals of project quality, progress, and investment supervision were determined, and the project was established. Supervision Department. According to the supervision contract and the "Construction Project Supervision Specifications", the supervision project list is broken down and the responsibilities of the general supervision engineer and professional supervision engineers are clarified. Institutionalize, normalize and standardize the supervision work to ensure the smooth implementation of supervision tasks.

With the strong support of the owner and the company, the supervision work of this project is progressing smoothly. Throughout the entire supervision project, we have strengthened and standardized the supervision's own management work, strictly implemented various rules and regulations, and ensured the quality of the project and the conscientious implementation of the contract.

While strictly supervising, we also focused on problems arising from the construction of the project and inadequate management. We have increased the intensity of "strict supervision" and strengthened the strength of inspection and standbys; we have made more rational suggestions and strengthened "prior supervision" and "active supervision". During the supervision process, we have achieved 100% standby of hidden projects and key parts. , make repeated inspections on a daily basis to nip project quality problems in the bud.

3. Project Supervision and Management

Approval of the overall start-up report and sub-project start-up reports: Our supervision department reviews the contract in strict accordance with ensuring the construction period and quality and meeting the conditions of the contract. The input of human labor, materials, and machinery, review of the rationality and feasibility of the construction plan, specific measures to ensure quality, and the construction of the contractor's quality inspection system.

The handover of sub-project processes is a key point in the daily work of supervision and control of project construction quality. The supervision department first conducts a comprehensive inspection of the upper process and confirms that it meets the relevant requirements after processing, and then it is allowed to transfer to the next process. Process construction.

The Supervision Department has strictly checked the factory quality certificates of the incoming materials for this project with the model, specifications, and factory date of the incoming materials on site. After the raw materials arrive at the site, the contractor's re-inspection and supervisory sampling inspection shall be carried out strictly in accordance with the prescribed batches, so as to ensure that no inspection is missed and the usage parts of the materials are clearly defined.

Problems discovered during side inspections and inspections will be notified verbally on site promptly and the construction unit will be required to make rectifications. If the problems are serious or the contractor fails to make rectifications as required, the supervision department will issue a notice to the supervision engineer. All quality problems discovered were rectified and improved under the supervision of the Supervision Department, and the instructions were closed.

4. Project progress management

The overall construction progress plan, phased construction plan, monthly construction plan, etc. reported by the construction unit. The Supervision Department comprehensively considered the contract duration requirements, the principles that are beneficial to ensuring the quality of the project, the reasonable labor, material, and machinery investment required to complete the plan, the contractor's construction plan to ensure the completion of the plan, and the quality assurance to ensure the completion of the plan, etc. , the Supervision Department will make a reasonable adjustment and approval after detailed review. When the construction period is tight, the construction unit is required to reverse the construction period and the contractor is required to invest necessary equipment, manpower, material resources, and financial resources to scientifically organize and strictly manage the project to ensure normal construction progress.

5. Integrity Construction and Safety Management

The Supervision Department actively and strictly implements the requirements of owners and superior departments in terms of clean government construction, civilized construction, safety, and environmental protection. Relevant meetings are organized and held regularly so that each supervisor can carry out his or her work honestly and fairly. The implementation of safety measures and rectification results are monitored throughout the entire process. No safety accidents have occurred in this project so far.

In short, in the construction supervision work, we grasped the important parts and key links, focused on prevention, always strictly controlled, and ensured quality. The project was safe, reliable, and met the design and specification requirements. .

We will correct existing problems in a timely manner with a rigorous and pragmatic work attitude, overcome inadequacies, increase work intensity, and deliver a satisfactory project answer to the owner!