Time goes forward step by step on the annual ring, and a period of work has ended. Looking back on this period, our working ability and experience have grown, and it's time to write a work summary. How to write a work summary to attract more attention? The following are 202 1 water conservancy work summary essays (6 selected essays) that I compiled for you. Welcome to learn from them, I hope it will help you.
Summary of Water Conservancy Work in 1 20xx Under the correct leadership of the county party committee and government, under the care and guidance of the county water conservancy bureau, and through the joint efforts of cadres and masses in the whole township, some work has been done in flood control and water conservancy management. Now the water conservancy work in 20xx is briefly summarized as follows:
1, in flood control:
The flood control and drought relief headquarters was established, and the 20xx annual flood control implementation plan and emergency flood control plan for water conservancy projects were formulated. Implement all kinds of flood control materials in the area, and allocate emergency materials and tools such as sand, gravel and woven bags, and the person in charge is responsible. The water conservancy managers in each village have received on-the-job training (in the township government), which has strengthened their sense of responsibility. At the same time, emergency teams for flood control and emergency rescue have been established at both rural levels, with specific division of responsibilities. In particular, my hometown 7.25 and 8. 12 suffered a catastrophic flood which is rare in history. Under the correct leadership of the township party Committee and government, it won a major victory and ensured the safety of people's lives and property.
2. Winter maintenance:
According to the arrangement of the county magistrate, a special meeting was held, the winter road reconstruction plan was compiled, and the main battlefield for winter road reconstruction was determined. The main battlefield of this year's winter repair is mainly
(1) Baiyangtan to Nanchenggou section.
(2) along the fire ditch.
③ Zhu Yuan and Wang Ping.
(4) Yuanqu reach
(5) Liu Jialiang section.
Roads in other villages will be completed by the villages themselves before the end of February.
Summary of Water Conservancy Work 2 In the past year, under the leadership of the township party committee, the government and the municipal water conservancy bureau, our water conservancy station gave full play to the role of a policy-oriented and service-oriented grass-roots station, conscientiously implemented the water law, the flood control law and the soil and water conservation law, and earnestly did a good job in rural water conservancy planning, rural safe water use project preparation, small-scale water conservancy project design, and project quality guidance and supervision. The work of the past year is summarized as follows:
First, pay attention to the construction of farmland water conservancy infrastructure.
The water conservancy infrastructure in Maodu Township is seriously aging, and it was basically built in the 1960s and 1970s. Turn pressure into motivation at work, constantly sum up and absorb good experience, listen to the opinions of the masses, and encourage and protect the initiative and enterprising spirit of the masses. Carry out publicity, conduct policy guidance, strengthen the service concept, establish a correct public opinion orientation, put the interests of the masses first, and combine work with the interests of the masses. This year, the 20XX-meter canal water conservancy infrastructure project of Guanchong Village Chief was solved, with the capital of 1 000 yuan, to help the people do a good job in engineering design, contact construction machinery, strictly control the engineering quality, and invest funds to help the people make careful calculations. I always thought so. Although sometimes some work done can't bring obvious benefits to the masses immediately, and a moment's haggling over every ounce can't save thousands of dollars for the people's investment, water conservancy construction is a major event that benefits the country and the people, and the quality of the project can't be affected because of a moment's negligence, resulting in a waste of investment.
The second is to prepare for flood control and drought relief.
The water conservancy station is the staff and assistant of the leaders in the flood control and drought relief work in the township. The basic situation that my hometown is located on both sides of Yuanhe River determines the arduousness and importance of flood control and drought relief. Before the flood season comes, make preparations as early as possible, actively participate in drafting plans, nip in the bud, and truly reflect the pre-flood preparations of the whole township to the leaders with a serious and responsible attitude, so as to provide scientific basis for their correct decision-making; During the period of flood control and drought relief, we should conscientiously implement the relevant regulations, obey the organization and dispatch, stay in the post, keep the communication open for 24 hours, timely and accurately predict the water situation, rain situation and water situation, scientifically and rationally dispatch three small reservoirs under the guidance of professional technology, and be ready to help the leaders make suggestions at any time. Always be a staff officer at the headquarters and a front-line combatant.
The third is to grasp the daily work of the water conservancy station and the temporary tasks assigned by the leaders.
Usually, I often take the initiative to report to the leaders in charge, discuss rights and interests, and seek the best solution to the problem. I am determined to go all out in water administrative supervision and law enforcement, water resources management, water and soil conservation supervision and prevention. Especially in this year's Twelfth Five-Year Plan for water conservancy development, we have overcome many difficulties such as few people, tight time and heavy tasks. And take the sense of responsibility as the first priority to grasp this matter. On the basis of full investigation and understanding, listen to opinions from all sides, understand history, face reality and plan the future, and put forward a detailed feasibility report on water conservancy construction and development in our township during the Twelfth Five-Year Plan period.
Over the past year, our water conservancy station has broken through water control and grasped water conservancy, and integrated the strengthening of farmland water conservancy capital construction into every work. Although some achievements have been made, they have been recognized by superiors. These are inseparable from the strong leadership of the party Committee and government, and from the support and understanding of the cadres of the two committees in each village. Strengthen the basic construction of farmland water conservancy, provide reliable water conservancy guarantee for the masses, strive for more water conservancy projects, and let the state's funds tilt a little more to my hometown, but there is still a long way to go, and we must work harder in the future.
Summary of Water Conservancy Work 3 Under the correct leadership of the town party committee and government, under the specific guidance of the Municipal Water Conservancy Bureau, with the strong assistance of village leaders and the active efforts of all the staff in the institute, we have successfully completed all the tasks assigned by the town government and superiors.
This year is the year of the party's convening. Can seriously study and implement the spirit of the party, seriously study and implement the relevant water laws and regulations, and actively complete the tasks assigned by the town government and the municipal water conservancy bureau. In deepening the basic construction of farmland water conservancy and promoting the development of water conservancy in our town, we have mainly done the following work.
First, strengthen business study and formulate rules and regulations.
Organize the staff in the institute to study water laws and regulations and the party's principles and policies, actively participate in computer training courses, administrative law enforcement examinations and financial personnel training courses organized by the city, and improve their business knowledge and work functions. At the beginning of the year, a series of rules and regulations such as various work plans, work responsibilities, flood control duty system and financial management system were formulated, and the division of labor was clear, which laid a good theoretical foundation for the smooth development of the work.
Second, do a good job in the capital construction of farmland water conservancy.
(1) irrigation
Two places were built in Wufeng Irrigation District this year, one of which was the canal of Laodong Village 150m which was washed away during irrigation. At that time, it was the time for farmers to transplant rice seedlings, which affected farmland irrigation. So, I went to Wufeng Village for many times to understand the situation and solved 200 woven bags, 120m plastic sheets. The other is Wufeng Village barrage, which has been washed away for more than 20 meters for some unknown reason, resulting in water shortage of more than 70 paddy fields. In order to solve the problem of farmland water use, we have negotiated with the higher authorities many times without weekends. It took more than 10 days to pull stones and weave cages, repair the washed dams and canals, and ensure the irrigation water for Wufeng Village. In addition, a farmer's bridge in Helong village was repaired, and materials such as cement and steel bars were solved in time, which did not affect the normal water use of paddy fields.
(II) Summary of Work of Water Conservancy Bureau of Drinking Water Project In order to solve the drinking water problem of the majority of villagers, the following work has been mainly solved. First of all, He Long Village was helped to build the reservoir, which solved the problem of water seepage and made the villagers drink tap water in time. Secondly, the renovation project of tap water in Minzhu Village includes drilling a deep well, maintaining reservoirs and pipelines, among which the reservoir project has not been constructed.
Thirdly, Xiaoying village drilled two deep wells, repaired pipelines, and vigorously mobilized the village's financial and material resources to solve the farmers' drinking water project. And report the drinking water projects in other villages to the superior, and make the project design and budget estimate in advance.
Third, do a good job in flood control.
Flood control work is an important event to protect the national economy and the safety of people's lives and property, and it is also the focus of the whole town's work. As a water conservancy department, report the characteristics of flood control work this year to the competent leaders before the flood season comes, and formulate a flood control responsibility system to achieve early departure, early preparation and early prevention.
(1) Strengthen organizational leadership. All villages are required to establish and improve flood control work.
Leading group, clear leadership responsibilities, division of labor and cooperation, each with its own responsibilities, so that this year's flood control work has an organizational guarantee.
(2) The post responsibility system for flood control has been implemented. The members of the leading group for flood control in the town have their own responsibilities, such as small reservoirs, ponds, river banks, etc., and sign letters of responsibility for small reservoirs and ponds with village leaders and pond owners. Organize staff to go to the countryside frequently, check the situation, find problems and solve them in time. If there is any problem that cannot be solved, report it to the competent leader, which will attract the attention of the leader and be solved in time. At the same time, assist the villages to clean up the garbage in the flood drainage ditch in time to achieve the standard of smooth drainage in flood season.
(3) flood control duty. June 1 to September 30th is the flood control period, and the duty-sitting system is consciously observed. No matter day or night, the weather is good or bad, and there is no rest day, we should stick to our posts, fill in the duty situation of the day carefully, and provide the leaders with rain, water and disaster conditions in time to avoid missing posts.
The fourth is the general survey of basic data of water resources.
In order to further grasp the utilization of water resources in each village, we went to the countryside to make a thorough investigation of each village and collected specific data such as springs, deep wells and vegetable fields. This work is complicated and long-term. We will continue to do a good job in all kinds of data census next year, and also create favorable conditions for applying for projects in the future.
Fifth, do a good job in immigration investigation.
This year, the higher authorities arranged for the water conservancy department to conduct an immigration survey, which is related to the interests of future immigrants receiving subsidies. Therefore, from the first step to register immigrants, the second step to register immigrant children, deceased families, witness signatures and villagers' signatures, a series of registration processes require all villages to strictly control, the leaders are responsible, and the list is published. This immigration registration is the first time that the higher authorities have started this work. So many aspects are repetitive, complicated and tedious, so the village leaders feel very patient, but considering the vital interests of the vast number of immigrants, they still patiently explain to them so that there are no loopholes in immigration registration.
The intransitive verb prepares the project design report.
Through the Survey Section of the Municipal Water Conservancy Bureau, the survey and design projects in our town this year include Dongguang tap water, Changdong flood control ditch, Wufeng reservoir and Xiaobaishigou small watershed project. Among them, Xiaobaishigou small watershed management project was reported to the Municipal Finance Bureau, Wufeng Reservoir reconstruction was completed, and Dongguang tap water project was reported to the Municipal Water Conservancy Bureau.
Seven, strengthen the publicity of water law.
Water is the lifeline of mankind, and the world is facing a water shortage crisis. In order to raise people's awareness of conservation, the 20th China Water Week organized a publicity campaign on water law to welcome the 5th/kloc-0 World Water Day. On the day of the activity, the government compound was covered with billboards, banners and posters to organize yangko teams, which further enhanced the villagers' awareness of water conservation.
Eight, to assist the government affairs center.
Be able to go to the countryside in time to organize the general election of the village-level two committees in Baocun. Do a good job in Qingming fire inspection and new house project. Actively participate in theoretical study and various activities organized by government departments.
Summary of Water Conservancy Work 4 Since the spring of this year, under the correct leadership of the township party committee and government and with the strong support of the superior business department, the township water conservancy station has carried out all kinds of work in a solid and effective way, closely focusing on the work objectives set at the beginning of the year, and now the work situation is reported as follows:
1. Successfully completed the restoration project of Xiacun Village in Shui Pi.
The project started construction in February this year, benefiting more than 60 farmers in/kloc-0. It was fully completed in mid-March, and the acceptance team of county water conservancy bureau completed the acceptance of the project, which highly praised the quality of the project.
Two, do a solid job in township flood control and geological disaster prevention.
Flood control work: In the face of frequent extreme weather and severe flood control situation this year, we strive to take the initiative and make comprehensive preparations for flood control. First, before the arrival of the flood season, organize relevant personnel to conduct a comprehensive inspection of the township's water conservancy work, investigate hidden dangers, and rectify within a time limit. Second, in the face of the current new situation of flood control, combined with the actual situation in our township, we have formulated more detailed and operational flood control plans for water conservancy projects such as townships, villages, reservoirs and mountain ponds, and formulated the designated contract responsibility system for "three communications" in combination with the work of "three communications", which further clarified and refined the responsibility for disaster prevention and mitigation, enhanced the pertinence of flood control work, and clarified the division of responsibilities. Third, a township flood control team of 38 people was established. We carefully selected 37 young soldiers from the militia as the backbone and organized them into two teams for emergencies. Fourth, according to the requirements of the county defense office, the reservoir dam road was newly opened and various flood control materials were prepared. The fifth is to adhere to the 24-hour duty system, with the flood control office taking the lead, and the village coordinators paying close attention to and cooperating with each other, making a good forecast of rain and water conditions, and releasing it at the first time, and establishing a complete and thorough mechanism for releasing and transmitting flood control information in towns and villages to ensure that effective measures are taken at the first time to maximize the safety of villagers' lives and property.
Prevention and control of geological disasters: at the beginning of the year, various emergency plans for prevention and control of geological disasters were formulated. Before the flood season in February, the survey and registration of affected households were completed and disaster prevention cards were issued to each household; After the sudden heavy rainfall in March, we adhered to the 24-hour duty system and intensified the investigation of ground disasters. In March alone, the township conducted five net-pulling investigations; In view of the seriousness of the form of disaster prevention, according to the unified arrangements of the township party Committee and the government, all affected households have implemented the responsibility system of "three deliveries" of cadres, and then reissued disaster prevention cards, which truly realized the full coverage of prevention and control of hidden dangers of geological disasters and laid a solid foundation for the staged victory of disaster prevention work.
Third, do everything possible to publicize the water law.
With the favorable opportunity of World Water Day and China Water Week, in cooperation with the county water conservancy bureau, various water conservancy policies and regulations are widely publicized through village billboards and posters, and the concept of protecting and cherishing water is passed on to the hearts of the people in the township, creating a good legal environment for promoting and ensuring the transformation of traditional water conservancy into modern water conservancy and sustainable water conservancy.
Four, actively carry out the introduction and implementation of small water conservancy projects, with the county water conservancy bureau to do a good job in the planning and design of the project.
Since this spring, we have cooperated with the county bureau to complete the renovation planning and field survey planning of small farmers' water conservancy projects in five villages in the township, in order to prepare for the implementation of the project as soon as possible this winter.
Five, do a good job in the central work arranged by the township party committees and governments.
In the case of fulfilling the responsibilities of water conservancy stations with good quality and quantity, we will actively do a good job in the central work of new rural construction, villagers' residence, adobe house renovation and "floating on the water" (double crossing) farmers' landing arranged by the township party Committee and government in accordance with the unified arrangements of the township party Committee and government.
VI. Next Work Plan
1, continue to do a good job in flood control and geological disaster prevention to ensure safety.
2. Do a good job in the reinforcement of small farmers' water conservancy projects and reservoirs, actively create a relaxed construction environment, cooperate with the county water conservancy bureau to complete the construction on time, and benefit the people as soon as possible.
3, actively be a good leader's staff, and strive for preferential policies from superiors.
4, do other central work arranged by the township party committee and government.
Summary of water conservancy work in 5 1 year Under the correct leadership of the county party committee and government, under the specific guidance of the county water conservancy bureau, with the strong assistance of village leaders and the active efforts of all the staff of the township government, we have successfully completed all the tasks assigned by our superiors. In deepening the construction of farmland water conservancy infrastructure and promoting the development of water conservancy in our township, the following work has been done.
First, strengthen business study and formulate rules and regulations.
Organize water station personnel to learn water laws and regulations and the party's principles and policies, actively participate in the training organized by the county, enhance their business knowledge and improve their working ability. At the beginning of the year, a series of rules and regulations, such as various work plans, work responsibilities, and flood control duty system, were formulated, and the division of labor was clear, which laid a good theoretical foundation for the smooth development of the work.
Second, do a good job in the construction of farmland water conservancy infrastructure.
The construction of irrigation and water conservancy infrastructure is closely focused on agricultural production to solve the drinking water problem of the majority of villagers. Focusing on accelerating the adjustment of agricultural industrial structure and accelerating agricultural industrialization management, the key point is to seek a breakthrough in land circulation; Seize the opportunity, make good use of advantageous policies, and focus on building 1 10,000 mu of cornflakes, trees and alfalfa planting bases to improve the overall benefits of agricultural planting and ensure the safety of people's production and life.
Third, do a good job in flood control.
Flood control work is an important event to ensure the safety of national economy and people's lives and property, and it is also the focus of the whole water conservancy work. Before the flood season comes, the water conservancy workstation shall report the water situation to the competent leader and formulate the flood control responsibility system, so as to achieve early start, early preparation and early prevention.
1, strengthen organizational leadership
Villages are required to establish and improve leading groups for flood control work, clarify leadership responsibilities and perform their duties, so that this year's flood control work is organized and guaranteed.
2. Implement the post responsibility system for flood control.
The members of the leading group for flood control in villages and towns are responsible for their own duties and sign safety responsibility letters with village leaders. Organize township business organization personnel to often check the situation in the village, find problems and solve them in time, and report the problems that cannot be solved to the competent leaders for timely solution. At the same time, assist the villages to clean up the garbage in the flood drainage ditch in time to achieve the standard of smooth drainage in flood season.
3. Flood control on duty.
June/KLOC-0 to September 30th is the flood control period, so we should consciously abide by the duty system, stick to our posts no matter whether the weather is good or bad, fill in the duty situation of that day carefully, and provide the leaders with rain, water and disaster conditions in time to avoid missing posts.
Four, water conservancy census work
In order to further master the utilization of water resources in each village, the staff of township water conservancy station actively cooperated with the work of county water conservancy bureau, personally went to the countryside to conduct a thorough investigation in each village, carefully counted the data, and did a good job in water source regulation, river regulation, pollution interception and emission reduction. In accordance with the principle of "market-oriented, scientific planning, adapting to local conditions, and adapting trees and places", we will support the forest and fruit industry that is suitable for growth, fast growth and high efficiency, and ensure the good results of managing one place, becoming one place, receiving benefits and demonstrating one place.
Five, strengthen the publicity of water law.
Water is the lifeline of mankind, and the world is facing a water shortage crisis. In order to raise people's awareness of water conservation and carry out water law publicity activities smoothly, banners and posters were posted in the cultural square to further raise the awareness of water conservation among the rural people.
In a word, in the past year, although our work has made some achievements, there are still great shortcomings. We will conscientiously sum up and correct, explore new and reasonable working methods, overcome difficulties, seize opportunities, blaze new trails, and work harder to complete the tasks assigned by our superiors, so as to make due contributions to the water conservancy cause in our township.
Summary of water conservancy work 6 I. Development of water conservancy management work
In recent years, we have adhered to the guiding ideology of "scientific planning, water control according to law and standardized management" and actively explored the development mechanism of "self-maintenance and self-development" in accordance with the working objectives of "improving management level, improving service quality and improving operation efficiency", and achieved certain results in water conservancy construction.
(a), adhere to the construction management, ensure the safe operation of the project.
Most of the water conservancy projects in xx Township were built in 1960s and 1970s. With low construction standards and long operation time, most of the original projects have become problem reservoirs. In addition, the canal system is not matched, the standard is low, and irrigation efficiency is not big. After on-the-spot investigation, under the leadership of the government and the Water Conservancy Bureau, work was actively carried out, scientific planning and careful construction were carried out. In recent years, the investment in reservoir construction has increased year by year, and the construction of reservoir reinforcement project has provided favorable conditions for improving the present situation of reservoir. In recent years, the two reservoirs have been rebuilt, which can basically guarantee the tasks of flood control in summer and drought prevention in winter. The renovation of 28 Sanpingtang has also been completed. According to preliminary estimation, nearly 1,000 mu of farmland can be effectively irrigated. In xx and xx years, nearly 13 kilometers of canals were renovated and built, which greatly improved the coverage rate of canals in xx township. At the same time of project construction, we began to consider the management of reservoir projects. In order to fully mobilize the enthusiasm of villagers in various water conservancy areas, we have formulated detailed management methods, and paid special attention to village cadres, so that they can patiently and meticulously do the ideological work of villagers in water conservancy management and realize the importance of water conservancy construction.
Strengthen publicity, control water according to law and create a good working environment. On the one hand, strengthen the publicity of water laws and regulations, educate the masses to put safety first and protect water conservancy projects; On the other hand, strengthen law enforcement, stop and seriously deal with violations in time; At the same time, win the support of leaders at all levels and local village cadres to help coordinate and handle local contradictions. After long-term and meticulous work, the management environment has been greatly improved. Especially through demarcation, the scope of reservoir management has been clarified, water management units have legal management rights, and the external conditions of reservoir management have been completely improved. And establish a "self-sufficiency, self-sufficiency" operation mechanism. We make full use of surface resources, vigorously develop water conservancy and fisheries, and strive to improve operating efficiency and income-generating capacity.
(2) Make full use of tap water resources and strive to improve operational efficiency.
In the tap water project, after the overall consideration of the government and the Water Conservancy Bureau, we actively explored a new mode of tap water management in villages and towns, and revitalized water resources through the combination of individual contracting and water pipe station management, which truly achieved effective utilization and management. Since I served as the stationmaster of the water pipe station, the number of tap water users in xx township has gradually expanded from less than 200 to more than 400. We fully tap the potential and rationally develop and utilize water resources. This new mechanism to speed up the reform of water conservancy investment and financing system has broadened the sources of funds for water conservancy construction, actively supported the combination of individual contracting and water management stations, and further broadened the channels for the development of township water conservancy.
I am in my thirties, healthy, energetic and enterprising, and I can devote myself wholeheartedly to the work I love. So I am also full of hope for my future work.
Second, the future work plan:
1, strengthen study, actively do daily work, and strive to improve service quality. Only by constantly strengthening the study of various management systems and related business knowledge of water management units and constantly enriching themselves can we be competent for the post requirements. The personnel of the water pipe station should be responsible for implementing the policy and communicating internally and externally. At the same time, plumbing work is actually a service work. Therefore, the plumber is both glorious and hard, and needs a strong sense of professionalism and responsibility; I need to have strong working ability and work art. In addition, I will strengthen the cultivation of party spirit, obey the arrangement, match words with deeds, take the overall situation into account, resolutely safeguard the unity of the leading group and maintain the image of the leader. At the same time, give full play to the enthusiasm of the staff of the water pipe station, make them strive for perfection, continuously improve the service quality and do a good job in water conservancy service.
2. Be a good staff assistant and serve the decision-making of superior leaders. I will timely and accurately grasp all aspects of the work dynamics, and timely feedback all aspects of information to the leadership; And pay attention to investigation and analysis, take the initiative to offer suggestions, make scientific analysis and judgment on various situations, and provide reliable basis for leadership decision-making.
3. Further do a good job in flood control and drought relief. Flood control and drought relief work is a long-term and important work, which must be highly valued and unremittingly grasped. Local rainstorm and flood are inevitable every year in Yibin county, and the water storage of water conservancy projects is insufficient, so the drought may develop. It is necessary to establish ideological preparations for flood control and drought relief, further implement the responsibility system for flood control and drought relief, do a good job in the construction of the annual inspection system for reservoirs, continue to improve the flood control plan, continue to do a good job in the construction of the three-prevention command system in various places, ensure the safety of flood control, water supply and food production, safeguard people's lives and property, and minimize disaster losses.
4. Do a good job in various water conservancy work focusing on rural water conservancy. Water conservancy work should focus on serving agriculture, countryside and farmers, closely focus on the strategic deployment of building a new socialist countryside, and continuously strengthen the construction of rural water conservancy infrastructure with the goal of improving comprehensive agricultural production capacity, promoting rural economic development and increasing farmers' income. Today, we should sum up the experience and lessons, consolidate the achievements of rural drinking water, and further solve the problem of rural drinking water safety.
Dear leading comrades, my handling ability and social skills need to be improved in my future work. However, I believe I can exercise myself through my enthusiasm when I was young and my serious and responsible attitude towards my work. At the same time, I also realized some methods and strategies to do a good job in water pipe station, and I believe I can do a good job in water pipe station.
;
- Previous article:How to choose celery
- Next article:A star named Meng
- Related articles
- How long can a dog take a bath after delivery? Can dogs take a bath after delivery?
- Which province and city does Suqian belong to?
- Weather description sentences in May
- Is Qingchuan Railway Station a bamboo garden?
- Sudden rainstorm, 26-year-old mother drowned, similar incidents happen every year?
- The climate of Xuzhou
- How far is it from Beijing to Tianjin?
- The maximum precipitation is 223.8 mm! Where is it raining in Xuchang?
- How can you not get angry in dog days and stay healthy?
- How to make the most authentic Henan hot soup?