Overhaul heatstroke prevention and cooling measures (6 practical articles)

Strengthen the propaganda of heatstroke prevention knowledge and improve self-protection ability. A new summer is coming soon. It's easy to get heatstroke in hot weather. When you feel dizzy, headache and nausea, you'd better rest in the shade immediately. What should I pay attention to when writing a summer heatstroke prevention and cooling plan? In order to meet your needs, I specially designed "Overhaul Measures for Heatstroke Prevention and Cooling (6 Practical Articles)", hoping to provide you with more reference.

Overhaul heatstroke prevention and cooling measures (6 practical articles) 1. The purpose and requirements of the exercise.

This plan is formulated in order to implement the occupational health and safety management system standards, deal with the potential hidden dangers of heatstroke prevention and cooling accidents, ensure the personal safety of employees, clarify the emergency rescue procedures and ensure the orderly implementation of the emergency plan.

Second, prepare for the exam.

1, Law of People's Republic of China (PRC) on Work Safety.

2. Regulations on the safety management of hazardous chemicals.

3, the production and business units of production safety accident emergency plan guide "

3. Time, place and participants of the exercise.

1. Exercise time: xx, xx, 13: 00- 13: 30.

2. Drill place: xx crosscutting unit operation side of production department 1# stacking area.

3. Participants in the exercise: the exercise leading group, operation area A, warehouse class A and package turning group.

Fourth, the exercise leading group.

1. Team leader: xx.

2. Deputy leaders: xx (command), xx (organization) and xx (organization).

3. planning: xx.

4. Team members: xx, xx, xx.

Verb (abbreviation for verb) rescue equipment and materials:

First-aid kit (medical alcohol, Ren Dan, ten drops of water, Huoxiang Zhengqi water, bandage, disinfectant), communication tools, towels, mineral water and electric fans.

Six, the exercise process:

1, crosscutting employee xx fell to the ground due to heatstroke during 1# stacking operation (simulated accident). After the monitor xx found out, he informed the shift supervisor xx.

2. After receiving the accident report, the operation chief xx immediately reports to the exercise leading group, and at the same time starts the emergency plan to organize on-site rescue.

3.xx: During the rescue, isolate and protect the site, evacuate irrelevant personnel and protect the accident site.

Seven, first aid steps:

1. Move: The chief operator xx organized the on-site personnel to quickly lift the heatstroke employee xx to a ventilated, cool and sweet place, so that he could lie flat and raise his head, unbutton his clothes and loosen his belt and cuffs.

2, cooling: put a wet towel on the patient's head, bath with cold water, accelerate heat dissipation, but can not directly blow the patient to prevent colds.

3, hydrating: If the heatstroke is conscious and has no nausea and vomiting, you can drink salt and soda to cool down and replenish blood volume. When hydrating, don't rush to replenish plenty of water to avoid vomiting, abdominal pain, nausea and other symptoms.

4. Wake up: If the patient has lost consciousness, you can refer to acupoints such as Pinren and Hegu to wake him up. If breathing stops, artificial respiration should be performed immediately.

5. Transfer: For patients with severe heatstroke, they must be sent to the hospital for treatment in time. Physical cooling should be carried out as much as possible during transportation to protect important organs such as brain, heart and lungs. You can apply a cold compress on your head or rub it with medical alcohol until your skin turns red.

6. Heatstroke employees wake up slowly after emergency rescue.

7. After confirmation, the operation chief Wei Yan reported to the exercise leading group that the on-site exercise of the emergency plan for heatstroke prevention and cooling was over.

Eight, the exercise leading group announced the end of the exercise after summing up the exercise.

Nine, the exercise personnel evacuated from the exercise site, and all units resumed operations.

Ten, summarize the problems existing in the exercise and make improvement plan.

Overhaul heatstroke prevention and cooling measures (6 practical articles) Part II 1, Purpose:

In the summer work process, due to many outdoor working environments, the distribution area of personnel work is complex and changeable; The influence of high labor intensity has brought a lot of inconvenience to work. In order to protect the legitimate rights and interests of employees, life safety and property safety, and create a safe and comfortable environment for employees.

2. Scope of application:

This system is applicable to xx Project Department of xx Power Construction Company.

3. Specific provisions:

(1) Seriously implement the responsibility system for heatstroke prevention and cooling.

Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.

(2) Reasonable arrangement of work and rest time.

Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.

(3) Strengthen the rotation rest at work.

In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.

(4) Ensure that there is enough drinking water supply at the site.

Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be supplied on site to effectively prevent heatstroke and avoid heatstroke.

(5) Implement heatstroke prevention and cooling items.

We should really care about the frontline construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, and require the construction workers to carry heatstroke prevention drugs with them, such as human pills, cooling oil, wind oil, etc., and implement the heatstroke prevention and cooling items for every worker.

(6) Actively improve the production and living environment of the construction site.

We should conscientiously implement the Regulations on the Management of Construction Sites, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets and showers for construction workers meet the needs of heatstroke prevention and cooling, and provide cool drinks and commonly used heatstroke prevention drugs for construction workers. Electric fans must be installed in the dormitory and canteen of the construction site, and units with conditions should install air conditioners in the dormitory.

(seven) do a good job in health and epidemic prevention.

It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.

(8) Do a good job of fire prevention in summer.

In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment according to regulations.

The third part is to ensure the smooth construction of the new Xingtai modified asphalt base project in Hebei Province, to ensure that the emergency rescue work can be fast and effective in case of emergency during the construction process, and to ensure the life and property safety of employees to the maximum extent. According to the characteristics of this project, this plan is specially formulated.

First, make this plan for all kinds of emergencies in construction to ensure that all kinds of emergency resources are in a good state of preparation; Moreover, it can guide emergency actions to be carried out in an orderly manner as planned, prevent accidents from being delayed due to ineffective actions or chaotic on-site rescue work, and reduce casualties and property losses. Construction emergencies refer to all kinds of construction accidents that occur suddenly and cause or may cause more casualties and greater economic losses.

Two, the establishment of the construction project emergency leading group, responsible for the command and coordination of emergency rescue work. Sun Qi, the branch manager, is the chief commander of the leading group. If the commander-in-chief is absent, assistant manager Lu Zhili will be the deputy commander-in-chief to carry out it. In the absence of the deputy commander, it shall be carried out by the monitor. For the implementation of rescue work, see the emergency organization plan for specific personnel arrangements.

Three, when there are all kinds of high temperature emergency symptoms in engineering and building construction, after receiving the emergency report, should immediately start the plan. At the first time, I asked for help from the company's emergency rescue command center and the "120" ambulance center respectively, and reported the situation to the municipal safety production supervision bureau, the Federation of Trade Unions and other relevant departments. After an emergency, the follow-up situation should be continuously fed back to relevant leaders and departments.

IV. In case of an emergency during construction, the branch company shall immediately set up a rescue site command as appropriate, with the manager Sun Qi as the commander-in-chief of the accident site, and set up the following leading group:

1, heatstroke prevention and cooling support team

Summer job, outdoor working environment; The distribution area of personnel work is complex and changeable; The influence of high labor intensity has brought a lot of inconvenience to work. In order to protect the legitimate rights and interests of employees and the safety of life and property, and create a safe and comfortable environment for employees, when employees have adverse reactions due to high temperature, the team leader will immediately organize team members to transfer and control the accident personnel to prevent the accident personnel from increasing on the surrounding site. Make emergency actions more targeted and improve operational efficiency. So as not to cause huge accident losses.

2. Information Contact Group

The team leader is responsible for understanding the influence scope of casualties, economic losses and emergencies, organizing the collection of daily weather and temperature, then taking necessary preventive measures, reporting the measures taken and the development of the situation to the superior in time, and contacting relevant departments.

3, security (alert) team

For the public security work in the evacuation area and resettlement area, the team leader should organize team members to monitor the development of dangerous situations, prevent the construction period from being affected, strengthen safety education for all team members, further improve safety awareness, and organize on-site management personnel to conduct safety inspections on the construction site, eliminate potential safety hazards, prevent the occurrence of vicious accidents, and how to control the impact of accidents to a minimum in case of accidents.

4. On-site medical rescue team

When an accident occurs, the team leader should organize team members to classify and give first aid to the wounded on site, and be responsible for effective rescue of the wounded at the first time; And transfer in time. The main duties of ambulance personnel are: to enter the accident area to rescue the wounded; Guide personnel in dangerous areas to carry out self-help and mutual rescue activities; Concentrate, count, transport and treat the wounded. According to the specific situation, quickly formulate emergency treatment plans and organize their implementation.

5. Logistics Support Team

The team leader is responsible for organizing the mobilization of rescue personnel, materials and equipment, and supervising and inspecting the implementation of various rescue and relief measures.

Five, in the case of construction emergency, the rescue site command according to the specific situation, can assemble rescue teams, personnel, materials and equipment from the nearby Xingtai Luqiao asphalt depot. At the same time, professional rescue teams, materials and equipment are mobilized from the emergency preparedness and rescue team.

Six, all kinds of emergencies, need to mobilize the main professional rescue team, emergency relief supplies. The main materials and personnel responsibilities are arranged as follows:

1, personnel and materials preparation:

The manager is responsible for the procurement of materials of the branch, and the main drugs and medical rescue instruments are as follows:

(1), drugs: cold medicine, fever medicine, diarrhea medicine, anti-inflammatory medicine and other therapeutic drugs, as well as Ren Dan, Shidishui, Zhengqi water, chrysanthemum tea, cold-reducing herbal tea, green health food, mung bean water and so on.

(2) Rescue appliances: single frame, ambulance, small oxygen cylinder, receiver, hospital bed, towel, medicine cabinet, freezer (ice), etc.

Seven, rescue methods:

1, mild patient

When the field staff feel dizzy, weak and dizzy, they should stop working immediately to prevent secondary accidents. Other surrounding staff should arrange symptomatic staff to rest in a cool and ventilated place and provide them with cold water and wet towels. And notify the branch leaders.

2. Severe patients (syncope, shock, severe water shortage, etc. )

When heatstroke occurs in the work site, people around the work site should immediately notify the factory leaders, and timely transfer the accident personnel to a cool and ventilated place to observe their symptoms, so that medical personnel can temporarily grasp the first-hand medical information. The branch factory should decide whether to start the emergency plan for heatstroke prevention and cooling according to the specific situation. And immediately organized ambulance personnel to rush to the scene to treat the accident personnel. Those with severe symptoms should be transferred to the nearest hospital for observation and treatment as soon as possible in the case that the medical equipment in the branch factory cannot be treated. And report it to the company.

Seven, the aftermath:

1, according to the principle of "four no-misses", do a good job in the investigation and handling of accidents, take targeted preventive measures, strengthen publicity and education for each team, so that everyone can master the precautions in the summer construction process and know how to protect themselves; Know how to save others. Summarize the experience and lessons to prevent similar incidents from happening. Specific preventive measures are as follows:

(1), the information group will set up a thermometer at the construction site to collect and process the daily weather, and then report it to the heatstroke prevention and cooling support group of the branch, and take corresponding safety precautions according to the specific situation.

(2) When the outdoor temperature is higher than 39℃, the factory shall conduct special safety disclosure for each team to cool down the construction, so that each team can stop the on-site construction work.

(3) The logistics support team should be able to guarantee the staff's drinking water and emergency medicine at any time.

(4) The heatstroke prevention and cooling emergency rescue agency shall formulate a set of reasonable and effective "personnel work and rest schedule" according to the temperature situation of the year, and avoid the highest daily temperature period (11:00 ~15: 00) for construction. After discussion by the branch company, according to the high temperature months in this city over the years, our summer (July to September) construction plan is formulated as follows:

Morning: 8: 00 ~ 12: 00.

Afternoon: 15: 00 ~ 19: 00

If it is necessary to work overtime due to time constraints or other special circumstances, it will be notified separately.

(5) The branch shall conduct safety education for each team to improve the ability of employees to cope with various situations. Strengthen the propaganda work of construction safety in summer, so that everyone can understand and master the safety common sense of heatstroke prevention and cooling, and improve the adaptability and processing ability of staff in practice.

Eight, emergency recovery, reentry

After emergency recovery, the dangerous area must be evaluated and the accident analyzed before re-entry. Only after determining the safety of the dangerous area can we enter the site to continue our operations.

Nine, emergency drills

After the establishment of emergency plan and emergency plan, after effective training, the factory or company will conduct a large-scale rescue drill every year before the arrival of summer. At the end of each drill, make a summary in time. If there is a certain gap, improve it in the future work.

1, exercise purpose

1) to test the effectiveness and adequacy of the emergency plan and implementation procedures.

2) Detection of emergency equipment

3) Ensure that emergency organization personnel are familiar with their tasks and responsibilities.

4) Test the coordination ability of emergency personnel.

5) Identify and correct the defects in the plan.

6) Check the adequacy and effectiveness of emergency equipment.

2, emergency plan drills

In order to improve the technical level of rescuers and the overall ability of rescue teams, and achieve the effect of rapid, orderly and effective accident rescue operations. The Branch will conduct rescue drills on a regular basis, and emergency rescue training has become an important task of the rescue team. Therefore, the Branch also emphasizes the following four points in the emergency rescue process:

(1), personnel must be in place on time during the drill and equipped with their own protective equipment.

(2), in the process of rescue should be "self-protection, save others" and active and effective rescue.

(3), must strictly abide by the command of the relevant leaders, do "false theory truth", effective implementation of rescue measures.

(4) The basic tasks of emergency training and drills are: to exercise or improve the team's ability to quickly rescue and block the source in case of sudden accidents, to rescue the wounded in time, to correctly guide and help the masses to protect or evacuate, to effectively eliminate harmful consequences, to carry out emergency rescue skills such as on-site first aid and casualty transfer, and to effectively reduce accident hazards and losses.

Overhaul heatstroke prevention and cooling measures (6 practical articles) 4 1. Purpose:

In midsummer, in order to avoid safety accidents caused by high temperature and summer heat, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high temperature weather. All workshops and departments should attach great importance to it, take measures, highlight key points, effectively strengthen the supervision and management of production safety, and prevent all kinds of accidents. Safety production measures during high temperature in summer are as follows:

Second, the establishment of heatstroke prevention and cooling work leading group:

Team leader: xx

Deputy leader: xxx

Member: xxxx

The office of the leading group is located in the Safety and Environmental Protection Department, and the director is xxx.

Office phone number 7346

Third, the specific measures for heatstroke prevention and cooling:

(a), earnestly implement the responsibility system for heatstroke prevention and cooling. All workshops and departments should conscientiously implement the specific requirements for heatstroke prevention and cooling at the production site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of front-line employees, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.

(2) Comprehensively organize and carry out summer safety inspection. It is necessary to effectively strengthen production safety, take the prevention of various accidents caused by natural disasters such as high temperature and strong convective weather in summer as the primary task, comprehensively organize various professional departments and workshops to conduct seasonal investigations and do a good job in implementation.

Formulate preventive measures to curb accidents during high temperature.

(3) Strengthen the operation safety during maintenance. It is necessary to highlight the hidden dangers of key projects, especially the supervision of electric and gas welding operations, limited space and aerial work, and strictly implement the safety precautions before maintenance. Personnel involved in maintenance shall strictly abide by the safety measures in the maintenance safety and environmental protection scheme. Hold a pre-inspection meeting, and conduct "five handover" to the personnel participating in the inspection, that is, hand over the construction tasks, safety measures, safety inspection methods, safety precautions and abide by relevant safety regulations. The guardian must be on-site supervision from beginning to end, and must not leave his post without leave, carefully check the construction site and implement safety technical measures.

(4) Strengthen the safety control of hazardous chemicals. In view of the volatile, leakage and deflagration of hazardous chemicals caused by temperature rise, it is necessary to strengthen the monitoring of major hazard sources of hazardous chemicals, do a good job in explosion prevention, lightning protection and leakage prevention of hazardous chemicals devices and pipelines, conscientiously implement measures such as ventilation, cooling, waterproof, moisture-proof, fire prevention, explosion prevention and lightning protection in hazardous chemicals production and storage places, and ensure that warehouses and pump rooms are ventilated at any time, and storage tanks are in good condition; The production and storage of hazardous chemicals should be "three inspections a day" and "three determinations" (that is, quantitative storage, regular temperature measurement and regular ventilation); The loading and unloading platform should be prepared for lightning protection, anti-static, emergency rescue and accident treatment, and the loading speed should be strictly controlled during loading to prevent electrostatic accumulation. In order to avoid high temperature weather, loading and unloading operations of benzene hydrogenation storage and transportation, tar storage and transportation and tar modified asphalt loading and unloading platforms are prohibited from 1 1: 00 to 15:00.

(5) Strengthen rotation and rest at work. According to the links of operation activities, the labor organization is adjusted, and the maintenance workers adopt intermittent operation methods at the scene.

Personnel have shortened the continuous operation time and strengthened the rotation rest during work.

(6) Ensure an adequate supply of drinking water. The comprehensive office is fully responsible for the contact, collection and distribution of all kinds of heatstroke prevention and cooling supplies and drinking water, and supplies sufficient drinking water, beverages, heatstroke prevention tea and various soups to the workshop to effectively prevent heatstroke and avoid heatstroke.

(seven), the implementation of heatstroke prevention and cooling items. The Safety & Environment Department is responsible for distributing heatstroke prevention and cooling drugs in the workshop and tracking and checking the drugs used by employees. Strengthen the propaganda of heatstroke prevention and cooling knowledge, and require operators to take or apply heatstroke prevention drugs, such as Ren Dan, cooling oil and essential oil. Before operation, implement the heatstroke prevention and cooling items of each worker.

(eight), do a good job in health and epidemic prevention. It is necessary to do a good job in sanitation and epidemic prevention in the construction site and dormitory, strengthen the monitoring of drinking water and diseases prone to occur in summer, and report to the dispatching, safety and environmental protection departments in time when legal infectious diseases and food poisoning occur in the construction site. The dormitory should be clean, the room should be properly ventilated, pay attention to personal hygiene, and often wash your hands with hand sanitizer (soap) and clean water, especially after coughing or sneezing. Cover your nose and mouth with a tissue when coughing or sneezing, and then throw the tissue into the trash can. To achieve "early detection, early reporting, early isolation and early treatment", improve the epidemic prevention ability of employees and ensure personal safety.

(9), do a good job of fire prevention in summer. In view of the hot summer, dry weather and easy fire accidents, fire prevention measures have been further strengthened. The electrical instrument workshop regularly organizes special inspections on flammable places such as power distribution room and oil pump room, and immediately corrects the problems found to avoid accidents.

(ten), do a good job on duty and information submitted. All departments and workshops should carefully formulate emergency plans for heatstroke prevention, flood control, fire prevention and poisoning prevention, and make good preparations for emergency teams and emergency materials.

Get ready, arrange the duty work in high temperature and strong convective weather, report the danger and accident immediately when found, and rush to the scene for disposal at the first time to prevent the accident from expanding.

Overhaul heatstroke prevention and cooling measures (practical 6) The weather is hot on Friday and summer, and the temperature gradually rises. In order to further do a good job of heatstroke prevention and cooling in summer, ensure the physical and mental health of employees, improve the enthusiasm of employees, and ensure the safe, efficient and high-quality completion of various tasks in a high-temperature environment, the company decided to carry out a summer cooling activity, and the relevant activity plan is hereby notified as follows:

I. Activity time

20xx August 5 ~ August 10

Second, the activity requirements

1, the department heads uniformly deploy the assigned project delivery activities.

2. Each department will deliver heatstroke prevention and cooling articles to each project department in time within one week.

3. During the activity, we should pay special attention to the weather forecast, adjust the activity plan in time, and ensure the cool service on key days and time periods.

4. Require all departments to communicate with the employees of the project department while sending coolness, understand the needs of employees, and convey the company's concern to every employee.

Overhaul heatstroke prevention and cooling measures (6 practical articles) 6 1. purpose

In order to strengthen the work of high-temperature operation and labor protection in high-temperature weather, do a good job of heatstroke prevention and cooling in summer construction site, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high-temperature weather. This plan is formulated in accordance with the provisions of the Occupational Disease Prevention Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC) and the Management Measures for Heatstroke Prevention and Cooling Measures.

Second, the scope of use

All employees and interns of Shuang Fu production plant.

Three. Definition of nouns

1) The daily maximum temperature is above 35℃ and below 37℃, which is generally high temperature weather;

2) The daily maximum temperature is above 37℃, and the weather below 40℃ is moderately hot;

3) The maximum daily temperature above 40℃ is strong and hot weather;

4) Continuous high temperature refers to "high temperature days" lasting for more than 5 days.

5) Hot weather operation refers to the operation arranged by the employer for workers in a hot natural meteorological environment in hot weather.

Fourth, the implementation time.

20xx July ~ June 20xx 10 (if the outdoor temperature continues above 36℃, the implementation date shall be postponed appropriately).

Verb (abbreviation of verb) related requirements

1) Regulatory requirements: Y.F.B.F. [20xx]No. 166.

During hot weather, the employer shall, according to the following provisions, production characteristics and specific conditions, take measures such as reasonable arrangement of working hours, rotation of work, appropriate increase of rest time for workers in high-temperature working environment, reduction of labor intensity and reduction of outdoor work during high temperature:

The employing unit shall adjust the operation time according to the forecast temperature released by the meteorological station affiliated to the municipal competent meteorological department on the same day, except for emergency treatment due to emergency rescue and disaster relief, personal and property safety and public interests.

(1) In general high-temperature weather, the employing unit shall rest in shifts, shorten the continuous working hours of workers, and shall not arrange outdoor exposure.

Workers who work overtime every day; The employer shall earnestly do a good job in heatstroke prevention and cooling in high temperature weather, formulate and implement heatstroke prevention and cooling measures, and ensure the normal operation of heatstroke prevention and cooling equipment.

(2) In medium and high temperature weather, the employing unit shall arrange all-day outdoor work time for workers according to the documentNo. [20xx]89 of the General Administration of Safety Supervision.

Regulations, and suspend the outdoor open-air operation during the high temperature period from 12 to 16. If it is necessary to work in the open air at high temperature due to the requirements of production technology, the employer shall reasonably adjust the work and rest time and take heatstroke prevention and cooling measures.

(three) when the high temperature weather is severe, the outdoor work on that day should be stopped. If it is really necessary to work in the open air because of the production process requirements, the employer shall make reasonable adjustments.

The whole work and rest time, and take heatstroke prevention and cooling measures.

2) Site status:

(1) Because the assembly workshop is hot; During working hours, it is always sunny and not ventilated. The ceiling is a board house that absorbs heat, and the temperature can reach 50 degrees in summer. (2) The actual temperature at the assembly plant site is more than 2 degrees higher than that reported in Chongqing weather forecast. On July 9, four employees of the assembly plant suffered from heatstroke;

Cost budget of intransitive verbs:

5898 1 yuan

(1) budget for heatstroke prevention products: ¥ 1.54 million yuan.

(2) Cold drink budget: 65,438 yuan +0. 83 million yuan.

(3) Budget of cooling equipment: ¥2528 1 yuan.

1) Adjustment of high temperature operation time in summer

Remarks:

From mid-July to June at 5438+ 10, the temperature is expected to reach 35+for 65 days, and the following cooling foods are prepared for Workshop 4:

1, mung bean soup: mung bean 30 kg/day.

2, sugar 10 kg/day

3. Summer tea: 1 kg/day