Traditional Culture Encyclopedia - Weather inquiry - What is the renovation process of the new house?

What is the renovation process of the new house?

Civil engineering stage, grass-roots treatment stage and detail treatment stage.

1. Civil construction stage: entering the site, tearing down the wall and building the wall; Trenching, hydropower transformation and acceptance; Buried trunking concealed hydropower renovation project, waterproof project, 24-hour closed water test of toilet and kitchen floor; Toilet and kitchen wall tiles.

2. Foundation treatment stage: carpentry enters the site, suspended ceiling and plastering corner lines; Wrap the door cover and window cover to make a wooden cabinet frame; At the same time, make all kinds of wooden doors, modeling doors and flat pressing doors; Brush the wooden panel with dust-proof paint (clear oil); Leveling and laying marble countertops on the windowsill; Veneer, thread, hardcover;

Treatment, grinding and leveling of grassroots walls; Glue the joints of furniture and doors and windows (protective edges).

3. Detail processing stage: brush the wall at least three times; Furniture paint comes into play, fills holes and paints; Treat the corner, lay floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines; Installation and debugging of lamps, switches, sockets, sanitary ware, handles and door locks; Cleaning, floor tile joint repair, exit; Internal preliminary acceptance of decoration company; Three parties make an appointment for formal acceptance and deliver it to the owner.

Matters needing attention in decoration of extended materials:

1, don't move the load-bearing wall.

The load-bearing wall is the pillar of the house and must not be demolished. Some friends who are not very clear about the structure of their houses are not talking about the structure of huxing, but the direction of stress. If you don't understand this, you can ask the developer or decoration designer. However, the load-bearing walls of houses are generally at the four corners of the walls, and these walls cannot be removed, otherwise it will be very dangerous and even endanger the whole building.

2. Avoid using marble on the ground.

The reason is that the weight of marble is many times heavier than that of ordinary floor tiles. If marble is used on the ground, it will cause a great burden on the ground. Authoritative data show that the material used in one square meter of ground cannot exceed 45kg.

3, door cover with

At present, half of the room doors are with doors, because of aesthetic, price and other related reasons. But it should be noted that the edge of the door needs to be filled with enough cement oil to sew the tile floor on the edge!

4. The toilet floor should be tilted.

When it comes to the bathroom, it is definitely inseparable from boiling water, and it is inseparable from waterproof treatment. There is often a lot of water here, but if the ground is too inclined, it will not look good, so the difference between the lowest place and the highest place of the funnel is 3-5cm.

5, wire with copper wire

It is best to use copper wire for wires, and avoid using wires made of other materials. Generally speaking, copper wire has good conductivity and less heat generation. The toilet door should not face the entrance of the gate. In addition, the toilet should always keep the air circulation and sanitation clean to avoid breeding germs and protect the health of family members.