Traditional Culture Encyclopedia - Weather inquiry - Flood control safety notice
Flood control safety notice
In today's society, we use notices more and more, and various types of notices have different writing methods. Do you know how to write a notice? The following are the precautions about flood control safety that I have compiled for you (selected 6 items). Welcome to share.
Flood control safety notice 1 member units of sub-district offices and district flood control units:
Since the flood season, there have been many sudden heavy rains in some areas of our region, and extreme weather has increased significantly. At present, our region has entered a critical period of flood control. In order to further improve the current flood control work and ensure the safety of the whole region, according to the requirements of the "Emergency Notice on Effectively Doing a Good Job in Flood Control of Heavy Rainfall" issued by the Provincial Defense General, the relevant matters are urgently notified as follows:
First, we must strengthen leadership, implement responsibilities, and strengthen duty. All streets and departments should earnestly strengthen the organization and leadership of flood control work, resolutely overcome paralysis and luck, and those responsible for flood control should take up their posts in time, redeploy and re-implement various flood control measures, implement flood control responsibilities to every link and relevant personnel, keep abreast of the rain and work conditions in the responsible areas, and organize the implementation of various defensive measures. It is necessary to strictly implement the 24-hour duty system for flood control, strengthen the patrol duty of reservoirs, ponds and dikes in small and medium-sized rivers, strictly implement flood control discipline and on-site flood reporting system, and avoid the phenomenon of AWOL.
Second, it is necessary to formulate and improve various plans. All streets should prepare village flood prevention plans and emergency plans as soon as possible, and decompose all links and related objectives and tasks involved in the plans into each post, so as to effectively enhance the grassroots' ability to cope with local extreme weather events. Ensure that there are forecasting facilities, early warning means, transfer routes, disaster avoidance places and resettlement plans. It is necessary to further strengthen publicity and the construction of a system of mass prevention and treatment, effectively raise people's awareness of self-protection and minimize disaster losses.
Third, strengthen flood control work in key areas. All streets and departments should organize to find the weak links in flood control in their own regions and industries, and earnestly do a good job in flood control in key areas. It is necessary to strengthen inspections of flood control projects, reservoirs, ponds and rivers under construction, implement special personnel management and protection, pay close attention to repairing water-damaged projects, and implement measures to prevent heavy rainfall to ensure project safety. During the rainstorm, all projects under construction must be stopped, and special personnel should be arranged to be on duty, and the safety flood control plan and emergency rescue plan should be earnestly implemented, and all flood control measures should be effectively done.
Fourth, we should further do a good job in flood control in cities and industries. City flood control office should organize re-inspection and re-deployment of urban flood control work and implement various preventive measures.
First, compulsory drainage measures shall be implemented for some sections and areas with accumulated water, and water blocking obstacles and garbage and dirt in flood discharge channels shall be cleared in time to ensure smooth drainage. For low-lying areas, rivers, dangerous houses and other key areas and key parts, it is necessary to carry out special inspections to find and eliminate hidden dangers in time.
The second is to do a good job in safety production on construction sites. In case of continuous heavy rainfall, construction should be stopped in time and workers should be evacuated from the site.
The third is to do a good job in ensuring the operation of urban public facilities. Urban water supply, gas supply, electricity, transportation and other municipal public enterprises and units should strengthen the inspection and maintenance of important facilities, and immediately start emergency plans in case of sudden accidents, and deal with them in time to ensure the normal operation of the city.
Fourth, departments and industries with flood control tasks in the industry should further clarify their responsibilities in accordance with the requirements of "industry management and industry management", further do a good job in self-examination and prevention, and strictly implement various flood control measures. It is necessary to focus on strengthening the investigation of flood control safety hazards in important parts such as school buildings, construction areas of industrial and mining enterprises, and crowded places such as tourist attractions and underground shopping malls, find problems in time, and take effective measures for rectification.
Fifth, we must persist in preparing for the storage and transportation of flood control materials, machinery and equipment, implement flood control teams and technicians, gather around the clock, and be ready for emergency rescue at any time.
Sixth, it is necessary to further strengthen information reporting. All streets and departments shall, in strict accordance with the requirements for the submission of information on finger prevention at higher levels, dispatch and master relevant information such as water conditions, work conditions, dangerous situations and disasters at any time, and report to the District Finger Prevention Office in time. Major dangers and disasters must be reported to the district for prevention and control at the first time.
xxx
date month year
Notice on flood control safety 2 All districts, villages, offices, centers and relevant enterprises:
At present, our street has entered a critical period of flood control. In order to fully implement the policy of "safety first, constant vigilance, prevention first and all-out rescue" and ensure flood control safety, according to the deployment and requirements of the district flood control and drought relief headquarters and street leaders for flood control work, the relevant work on flood control safety in 20xx is hereby notified as follows:
First, attach great importance to and implement responsibilities.
Since the beginning of this year, affected by the El Ni? o phenomenon, abnormal weather has increased significantly, and floods and geological disasters are prone to occur. The flood control situation is not optimistic, and the meteorological disaster prevention situation is very severe. In this regard, the whole street must attach great importance to it, prepare for the battle, resolutely overcome paralysis and luck, always maintain a high state of alert, and fully prepare for preventing floods, resisting floods, grabbing major risks and saving major disasters, so as to nip in the bud.
Strictly adhere to the principle of "territorial management and responsibility for soil conservation" in flood control work, and comprehensively establish a flood control responsibility system with street flood control and drought relief headquarters as the center, street organs and villages as the working grid, and reservoirs, flood discharge canals, low-lying courtyards, dangerous houses and other parts as the nodes. Each village should set up a leading group for flood control with the secretary of the village party branch as the main person in charge and the village director as the direct person in charge, and strictly implement the post responsibility system for flood control. Streets and villages sign letters of responsibility for flood control safety, and earnestly implement the flood control responsibility system, plans, teams, materials and hedging measures. The safety supervision center is responsible for all enterprises, the urban management center is responsible for the construction site, the development security center is responsible for the dilapidated houses, and the cultural, educational and health center is responsible for the flood control work of schools and kindergartens. Strictly implement the grid management system of government cadres Bao Cun, village cadres and village patrol members Bao Tangba, and middle-level government cadres Bao Keyang Dam, sign letters of responsibility at different levels, and implement the responsibility of safety and flood control.
It is necessary to strictly implement the measures taken by village cadres, the masses in party member, teachers and students, and implement the measures for early transfer of vulnerable groups such as safe-haven signals, safe-haven transfer routes, safe-haven locations, rescue teams, alarm personnel on duty, the elderly, the sick and the disabled. Villages should define the responsible person and post responsibility for all key flood control parts in the region, formulate and implement the safety flood control duty table, clearly arrange the duty telephone, and strictly implement 24-hour duty in flood season to ensure foolproof and safe flood season.
Second, strictly grasp the implementation of flood control measures
All districts, villages, offices, centers and related enterprises should earnestly implement various flood control measures to ensure the safety of people's lives and property and minimize disaster losses.
First, we must earnestly strengthen the construction of flood control emergency rescue teams. The flood control and emergency rescue team of our street organs includes the forest management squadron, the urban management squadron, all the staff in the area and cadres of other organs. Each village should establish a village-level flood control emergency rescue team with the main leaders of the two committees as the team leader and the members of the other two committees and village cadres as the main body. /kloc-in principle, there shall be no less than 50 people for more than 0/00 households, and no less than 100 people for more than 200 households. During the flood control period, when receiving the early warning information of rainstorm and flood within 24 hours issued by the meteorological department, the rescue teams at all levels should immediately enter the standby state and be ready for emergency rescue at any time.
Second, we must do a solid job in the investigation of hidden dangers of flood control. Before July 15, all districts, villages and relevant enterprises should comprehensively and seriously investigate key flood control parts such as reservoirs, rivers, ponds and dangerous houses, and strictly investigate them one by one. Before July 20, each district and village shall be responsible for comprehensively removing the water blocking obstacles such as garbage and firewood in the river courses and village drainage ditches in the region, dredging the drainage channels of villages, farmland and flood, and ensuring smooth drainage channels and flood season drainage. The Office of Flood Control and Drought Relief Headquarters will, together with the General Office, inspect and supervise the investigation of hidden dangers of flood control in all districts and villages. It is found that the hidden danger investigation is not in place and the rectification measures are not implemented. Except for informed criticism, it will be included in the year-end rural work assessment.
Third, we must conscientiously do a good job in flood control materials reserves. In order to ensure effective rescue in case of flood, it is necessary to reserve flood control materials in advance. My street flood control material reserve is divided into two parts. First, the street flood control and drought relief headquarters reserves 10 flood control vehicles, shovels, woven bags, gravel, raincoats, rain boots, flashlights and other materials; Second, the villages reserve flood control materials (see Table 2 for details). The Office of Flood Control and Drought Relief Headquarters shall, jointly with the General Office, inspect and supervise the storage of flood control materials in villages.
Fourth, we must do a good job in emergency rescue and disaster relief as soon as possible. Starting the emergency plan in time and quickly can not only improve the rapid response ability and emergency handling ability to sudden rainstorm and flood, but also greatly reduce disaster losses. All districts, villages and relevant units shall report the emergency plan for flood control to the community construction and development center before June 10. Once the disaster happens, they should quickly start emergency response and do a good job in evacuation, emergency rescue and disaster relief.
Three, strict implementation of water communication and reporting system.
First, strictly implement the early warning information release and notification system. Once the meteorological department releases the rainstorm and flood warning information within 24 hours, the street flood control and drought relief headquarters office will release the warning information in time by telephone, SMS and other forms. All districts, villages and relevant units should promptly inform the local people, inform them of the ways to avoid risks, and take various protective measures in advance.
The second is to strictly implement the disaster information reporting system. During the flood season, when there are disasters such as rainstorm and flood, the cadres of the two committees of each district and village and the cadres of relevant organs should arrive at the scene at the first time, and report the disaster situation to the office of the street flood control and drought relief headquarters in time while quickly organizing and implementing the rescue. Anyone who causes or enlarges the disaster due to man-made reasons such as late reporting, false reporting, concealment or omission will be seriously investigated for the responsibility of relevant personnel according to discipline and regulations.
xxx
date month year
3. Notice on flood control safety of village committees and township units:
At present, it has entered the flood season, the main flood season is approaching, and the flood control situation is becoming increasingly urgent. In order to ensure the overall victory of flood control work this year, combined with the actual situation in our township, the relevant matters are hereby notified as follows after research by the township party Committee and government:
One is to unify thinking and strengthen understanding.
Flood control work is directly related to the safety of people's lives and property, and to the stable, sustained, healthy and harmonious development of various undertakings in the township. All units in the village should take a high sense of political responsibility to the people, put the flood control work in an important position, take effective measures, and do a good job. The whole town must firmly establish the ideological preparation for preventing the flood, and must not be careless, and must not be lucky. We should pay more attention to it ideologically, improve our understanding, make full preparations and put measures in place in accordance with the requirements of "believing in its existence but not believing in its absence, believing in its greatness but not believing in its smallness".
The second is to strengthen measures and pay close attention to implementation.
All units in the village should adhere to the principle of giving priority to prevention and making overall plans, take multiple measures simultaneously, strengthen measures, and go all out to do a good job in flood control.
1, do a good job in the investigation and rectification of flood control safety hazards;
2. Improve all kinds of flood prevention plans and work plans;
3. Focus on preventing geological disasters caused by mountain torrents;
4, the implementation of population concentrated areas and other key parts of the preventive measures;
5. Ensure the safety of wading projects under construction;
6. Do a good job in emergency material reserve and emergency team building;
7. It is necessary to further improve flood control and emergency response capabilities;
8, disaster danger submitted in a timely manner, not late.
Third, strengthen responsibility and strict discipline.
Flood control work is a major event related to social stability and the safety of people's lives and property, with great responsibility. All units in the village should earnestly strengthen leadership, fully implement the flood control responsibility system, strictly implement the 24-hour duty and leadership shift system, strictly observe discipline, obey orders, and pay close attention to implementation. This year, we will continue to implement the four-level cadre guarantee system in cities, counties and villages, and guarantee to every natural village and every villager group. During the main flood season and heavy rainfall, the main responsible persons of all units in villages are not allowed to go out without the approval of the main leaders of township party committees. Those who cause serious consequences due to poor duty and emergency rescue will be seriously investigated for responsibility.
xxx
date month year
According to the forecast of the meteorological department, our city will suffer from heavy rainfall. In order to do a good job in urban flood control in our city and ensure flood control safety, we are hereby notified as follows:
First, raise awareness and strictly implement the responsibility system for urban flood control.
In recent years, with the large-scale urban construction, the urban flood control capacity has been greatly improved, but there is still a big gap between the urban flood control and disaster reduction system and the needs of economic and social development, and there are still many weak links. In the face of the severe situation that extreme weather may happen at any time, we must always keep a high degree of vigilance and enhance the sense of urgency and consciousness of doing a good job in urban flood control. We should continue to promote the hierarchical responsibility system with the chief executive responsibility system as the core, further improve and strengthen the construction of flood control emergency institutions in urban streets and communities, and ensure that each link and project has a clear responsible person and specific responsible departments. According to the change of government, the municipal flood control headquarters should adjust and enrich in time, and clarify the responsibilities of each member unit. Urban flood control departments at all levels should take ensuring the safety of people's lives and property and the safe operation of the city as the overall goal, overcome paralysis, laxity and luck, do a solid job in urban flood control preparations under the unified leadership of the local government and the flood control and drought relief headquarters, and strictly implement various safety flood control measures.
Second, highlight key points and make preparations for flood control.
First, do a good job in dredging and maintaining urban drainage facilities. Before the arrival of the main flood season, all relevant units should conduct a comprehensive inspection of urban rivers, drainage pipes, culverts, rainwater wells and drainage pumping stations, do a good job in dredging, dredging, maintenance and conservation as soon as possible, carefully investigate hidden dangers of flood control, and restore and improve the ability of flood control and drainage. Second, do a good job in flood control materials reserve. It is necessary to check the existing flood control materials, register them, and pay close attention to supplementing the insufficient parts. Management should be carried out by combining centralized storage with decentralized identification, and the responsible personnel, use procedures and transportation methods should be defined to ensure transportation and use in case of danger. The third is to speed up the construction of urban flood control early warning system. Urban flood control departments should strengthen cooperation with meteorological, urban management, civil air defense, radio and television departments, timely obtain weather information of major extreme disasters, and timely release them through various channels, so as to strive for emergency hedging time and avoid casualties to the maximum extent. The fourth is to further improve the emergency plan and carry out flood control drills. According to the situation of urban construction, the emergency plan for flood control should be revised and improved before the flood season to improve the scientificity, operability and practicability of the plan. In order to improve the actual combat capability of the flood control team and test the operation of the flood control command system, it is necessary to conduct a flood control drill before the end of July. Fifth, do a good job in flood control in key industries. Housing management, municipal administration, gardens, sanitation and other relevant units shall conduct a comprehensive investigation of construction sites, dilapidated houses, traffic arteries, parks and scenic spots, sanitation facilities, etc. According to the principle of "managing industry and safety", flood control measures are implemented to eliminate potential safety hazards. Urban water supply, gas supply and other public units should strengthen and overhaul low-lying areas and overhead river crossing facilities, and do a good job in flood control material reserves and pipeline repair preparations of key factories (stations) to ensure the normal and orderly life of the people.
Three, a comprehensive inspection, to ensure that all measures are implemented.
The competent department of urban flood control should immediately organize a comprehensive and in-depth pre-flood inspection, focusing on the implementation of urban flood control responsibility system, the release of early warning information, the operation of flood control command and dispatch system, the drainage of low-lying areas in urban areas, the preparation of flood control materials, equipment and teams, and the revision and drills of emergency plans. And in conjunction with the neighborhood committees and offices, conduct a comprehensive inspection of flood control work in schools, factories, mines, shopping malls and other crowded places within their jurisdiction, increase publicity and improve grassroots personnel.
Four, strict flood control duty system, timely reporting of flood control information.
All units should establish a 24-hour duty system, a leadership shift system and a responsibility investigation system. The flood control personnel on duty of each flood control and emergency rescue professional group should stick to their posts, and it is forbidden to leave their posts without permission; It is necessary to implement the 24-hour duty system for staff in flood season and keep 24-hour communication open; It is necessary to obey the unified dispatch and ensure the smooth implementation of government decrees; During the rainstorm, adhere to the leadership shift system and fully grasp and deploy the safety production work of the unit; It is necessary to strengthen contact with meteorological departments, grasp meteorological information in a timely manner, handle and report major anomalies in a timely manner, and severely investigate and deal with those who conceal or fail to report in time.
xxx
date month year
5. Notice of the village committee and relevant units on flood control safety:
According to the policy of "the responsibility system is implemented for flood control, and the main leaders of the local party and government are responsible for the problems", the responsibility system and scheme of the township and village leaders of the 20 12 key water conservancy project in our town are hereby printed and distributed to you, hoping that you will earnestly take responsibility and conscientiously implement it. Other water conservancy projects, key areas and parts prone to geological disasters (landslides and mudslides) within the jurisdiction of villages, low-lying areas along the river, houses and dangerous houses along the river, etc. It is necessary to implement the responsibility system, put the responsibility on people, formulate plans for flood control and geological disaster prevention, and truly achieve "no dam collapse, no dam collapse, no death, and safe flood season". Ensure the smooth development of people's lives and property and the national economy. The relevant matters concerning the current flood control and flood fighting are hereby notified as follows:
First, the establishment of flood control and disaster relief headquarters. The village committees, enterprises and institutions should set up a command organization headed by the main leaders of the party and government, which is responsible for the unified command of flood control and disaster relief work in the local area and the unit. The members of the flood control and disaster relief command group of each village unit should submit it to the Party and Government Office before this month.
Second, carefully organize pre-flood safety inspection. Village committees and relevant units should, according to their own flood control characteristics and tasks, be led by the main leaders to conduct safety inspections on water conservancy facilities such as reservoirs, dams, drainage stations, culverts, sluices, bank revetments, and construction sites prone to landslides and mudslides and with large excavation. And take effective measures to solve the problems found in the inspection, especially the dangerous sections and water-damaged projects caused by floods, typhoons and rainstorms.
Third, do a good job in clearing obstacles. Villages should carefully remove all kinds of illegal buildings, planting, piling up debris, garbage and all kinds of operations that endanger the safety of dams, rivers, reservoirs and other water conservancy projects in combination with flood control safety inspection.
Fourth, make preparations and prepare flood control materials. Villages and Jingxi supply and marketing cooperatives should prepare according to the material indicators issued by the county and town governments and store them in designated places. The stones and sand in the flood control storage pool should be inspected one by one, the damaged flood control materials should be replaced and supplemented in time, and the flood control materials in the village should be counted according to the storage points, and reported to the DangZhengBan before the end of this month. All relevant units should prepare sufficient flood control materials according to their own flood control requirements.
Five, the implementation of the flood control team. Villages must be fully equipped according to the requirements of the number of patrol rescuers issued by counties and towns. Villages and relevant units that are not included in the tasks assigned by counties and towns should be equipped with patrols and rescue teams according to the actual needs of the village, and it is required to do a good job in naming, cataloging, posting and grouping (team). Make sure that every team member is familiar with the situation, with clear tasks and appropriate tools. Villages should report the list of emergency team patrols to the town party and government office before the end of this month.
Six, do a good job in the military and civilian forces, cooperate with each other, and form a joint force. Flood control and disaster relief work has the characteristics of wide coverage, heavy workload and strong suddenness. Villages should actively contact with the local garrison, obtain the support of the local garrison, and formulate the military-civilian joint defense plan. Enterprises and institutions such as telecommunications, electric power, traffic health, public security, supply and marketing cooperatives, factories and mines must cooperate closely and fully support and assist flood control and disaster relief work.
Seven, the reservoir should be strictly in accordance with the 20XX limited water level in flood season, clearly marked water level, it is strictly prohibited to overstock. For accidents caused by over-storage, the relevant leaders and parties will be held accountable.
Eight, drainage station should pay close attention to equipment maintenance, safety inspection, spare parts preparation, machine pit, forebay dredging. And hurry up the trial before the flood season.
xxx
date month year
6 village (field), Sanxikou Reservoir Management Office and Town Dike Management Office flood control safety notice:
In order to do a good job in flood control this year, all villages (fields) and relevant units must act immediately, establish a strong sense of responsibility, put this year's flood control work on the agenda, make unremitting efforts, study, prepare, deploy and implement flood control preparations as early as possible, make mental preparations for preventing major floods, and implement various preventive measures as soon as possible to ensure the safety of water conservancy projects and the safety of people's lives and property, and promote social stability.
First, in order to do a good job in flood control this year, all villages (fields) and relevant units should set up flood control and disaster relief headquarters, strengthen flood control and disaster relief leadership, and report the list of members of the headquarters to the town flood control and drought relief headquarters before March 30.
Second, unify thinking, raise awareness, earnestly strengthen leadership over flood control work, conscientiously implement the general policy of "safety first, prevention first, and prevention is more important than robbery", firmly establish the idea that everyone is responsible for flood control and disaster relief, do a good job in key project construction, pay close attention to repairing water-damaged projects and ending spring water projects, and implement risk removal and reinforcement measures one by one in view of weak links and unsafe factors that endanger water conservancy projects. Each village (field) should start to formulate the 20xx annual flood control and disaster relief plan, so as to have rules to follow, improve adaptability, and ensure the safety of water conservancy projects within the design flood control standards.
Third, seriously carry out the safety inspection of flood levees and reservoirs. Each village (field), reservoir and dike management unit shall, according to their respective flood control tasks, organize inspection teams to conduct a comprehensive inspection of the safety of water conservancy facilities such as reservoirs, flood dikes, sluices and culverts, especially the restoration of water-damaged projects caused by floods and typhoons last year. In addition to feedback to the town headquarters, they should also take effective measures to deal with the problems found in the inspection one by one. The relevant village (field) and dike management office should seize the time to implement the principle of "whoever sets up obstacles and clears them".
The dike cleaning work requires that the dike cleaning work be completely completed before March 30, so as to create favorable conditions for flood control work. The town flood control and drought relief headquarters will organize relevant dike and reservoir section leaders, technicians and project managers to conduct comprehensive inspection and acceptance.
Four, conscientiously implement the flood emergency leadership responsibility system with the responsibility system of party and government leaders at all levels as the core. Villages (fields) and water management units should continue to improve the three-in-one responsibility system of leading cadres, technicians and project managers. The leaders of warehouses and dikes should go to the covered reservoirs and dikes as soon as possible to check their familiarity with the situation and help solve practical problems in flood control work.
Five, in order to ensure the needs of flood control and disaster relief, we should prepare flood control and emergency materials, establish and improve the mass emergency patrol organization, and achieve safe flood control. The relevant villages (fields) and units should pay close attention to the implementation of the number of emergency materials that should be prepared in the town's flood prevention and rescue work plan, and make full preparations. The materials in stock should be fully counted and dried, and the insufficient parts should be supplemented in time, so as to be prepared and nip in the bud. Rescue teams and patrols should identify personnel, determine the person in charge and the tools they carry with them, so that they can come at the call and resist when they come. Villages (fields) should list the rescue teams and inspectors, and report to the town flood control and drought relief headquarters before March 30.
Please implement the above notice carefully.
xxx
date month year
;
- Previous article:What is the content of world of tanks version 8. 1 1?
- Next article:Where is National Highway 547 105km?
- Related articles
- What stand-alone games are there that you can't extricate yourself from when you start playing?
- Where is the best place to play in winter?
- Nearly 70 years have passed, and there is still a story of "eight women throwing themselves into the river" among the villagers along the Wushun River. What kind of story is it?
- What are the characteristics of blowing sand and sandstorms?
- Cantonese: It's sunny outside today, monkey monkey. What is the weather like outside today?
- Water quality requirements of cultured yellow croaker, with culture methods.
Yellow croaker has high requirements on water quality, including water transparency of 35cm, PH value of water body o
- Sandstorms often occur in spring in northern China. What kind of weather system (cold front, warm front, cyclone, anticyclone) is related to the formation of sandstorm?
- Where is a good place to travel in mid-May?
- Why do we usually sweeten exotic foods such as coffee, chocolate, bread and oatmeal?
- Excuse me, what's the weather like on the seventh and eighth day of August in Changsha lunar calendar?