Traditional Culture Encyclopedia - Weather inquiry - It is estimated that the whole line will be opened to traffic on1October 25th, 65438! The road in Baotou will be rebuilt.
It is estimated that the whole line will be opened to traffic on1October 25th, 65438! The road in Baotou will be rebuilt.
Nowadays, this endless prosperity extends radially in all directions from here, and the ancient ring road connecting here has no past appearance. 1June 8/kloc-0, the reporter learned from the Engineering Section of Baotou Municipal Development Center that the comprehensive reconstruction project of the ring road (Red Star Roundabout-Donghe West Road) started on June10/0, and the main road started on June 17. At present, the Red Star Island is still under construction, and it is expected to be completed in 654381October 25th.
Huancheng Road is located in the central area of Donghe District. This road with a long history is the most prosperous road in Donghe District. There are not only a large number of shops along the street, but also schools, hospitals and parks. Its special geographical location makes every change of this road affect the hearts of people in Donghe District. In urban development planning, ring road, as a secondary trunk road, has always played the role of a main road, serving the people in Donghe District.
Hu Yu, Engineering Department of Baotou Municipal Development Center, introduced that the total length of the ring road comprehensive reconstruction project is 258 1 m, and the estimated construction period of the ring road reconstruction project is 1 1.05. After the close overall arrangement of the owner and the construction unit, the construction was completed about one month ahead of the expected construction period.
The reporter learned at the scene that the ring road drainage pipe network is a typical combined drainage pipe in Donghe District, and the mixed drainage of rain and sewage has a certain impact on the operation of the drainage system in Donghe District. The purpose of this transformation is to solve the problem of rain and sewage diversion and drainage in the surrounding areas of the city.
Therefore, sewage pipes, water supply pipes and rainwater pipes have been added to the comprehensive reconstruction project of ring road. The total length of sewage pipeline is 2245 meters, the total length of water supply pipeline is 2550 meters, and the total length of rainwater pipeline is 2293 meters, including 800 meters of rainwater pipe culvert. Large-scale underground building reconstruction is of great significance to improve the drainage environment around the ring road and improve the drainage system in Donghe District.
It is reported that the reconstructed ring road, from Hongxing roundabout to Heping section, has been widened from the original 18m to19m; From Heping Road to Donghe West Road, the road is widened from 18m to 20m.
Hu Yu said: "After the reconstruction of the ring road, the road has been widened, the underground drainage facilities have been improved and the pipelines have been completely separated. Rainwater and sewage along the ring road can be completely diverted, the problem of water accumulation in rainy season will be alleviated, and the problem of sewage leakage in this area will also be solved. "
As an important transportation hub, Hongxing roundabout has been shouldering the heavy responsibility of solving the traffic congestion problem at the intersection of Xin 'aobao Street and Huancheng Road. However, with the improvement of citizens' life and the increase of vehicles, Red Star Island is gradually unable to solve the traffic congestion problem. Hu Yu introduced: "In view of the traffic congestion problem, it was decided to dismantle the roundabout according to the design plan. After the demolition, three three-dimensional traffic diversions will be added to separate the traffic that may cause traffic congestion from the driving, and the continuous flow of traffic in different directions will be realized through the intersection to solve the tidal traffic congestion problem around the island. "
"At present, road reconstruction, water supply projects, underground rainwater and sewage pipelines have all been completed, and road greening, beautification and lighting construction are proceeding step by step. It is estimated that the whole line will be opened to traffic on October 25th, 1 1, and the street lamp and sidewalk works will be completed by the end of October. Considering the weather and the growth of trees, street trees will be planted in March next year to complete the comprehensive greening of roads. " Hu Yu said.
- Related articles
- Twenty classic short stories in Romance of the Three Kingdoms
- English poems describing summer include reading English poems about summer.
- Every time the sky rains again, there is a cloud in the wind composed of rain.
- Weather forecast of Chongzuo city, Guangxi
- What to do if your Xiasi dog has a cold? How to treat a Xiasi dog's cold
- How to prevent tens of thousands of packages from being flooded after heavy rain in Hubei
- How to query the weather forecast for the past month?
- Write a composition with my wish.
- Historical weather in Jianshui, Yunnan
- What are the village committees under the jurisdiction of Chucun Town, Mengcheng County, Bozhou City, Anhui Province?