In our daily study, work and life, we sometimes encounter unexpected accidents. In order to make emergency response in time and reduce the consequences of accidents, it may be necessary to make emergency plans in advance. So how should we prepare the emergency plan? The following is the property gale emergency plan I collected for you, welcome to share.

Property gale emergency plan 1 (1) Division of responsibilities of each post

1. The security department should do a good job in information transmission, resource allocation and related logistics support in case of sudden rainstorm.

2, engineering maintenance department is responsible for water supply and drainage, power supply, air conditioning, elevators and other mechanical and electrical equipment ` failure and emergency treatment.

3. The public security fire department of the property service company is responsible for the "three defenses" emergency treatment, security and voluntary fire fighting, and is also responsible for emergency rescue and disaster relief.

4. The cleaning and greening department is responsible for greening, environmental disaster protection and post-disaster recovery.

(2) Typhoon prevention, flood control and emergency treatment

1. After receiving the typhoon or rainstorm warning signal, the property service company should immediately mobilize urgently, and all departments are in a state of war. At the same time, a command team manager should be set up as the chief commander, and the heads of various departments should be members of the temporary headquarters of the three defenses. Relevant personnel should implement a 24-hour duty system and prepare for flood control and disaster relief.

2. Before the typhoon or rainstorm comes, measures should be taken to prevent wind and prevent water immersion, such as: do emergency work for wind and prevent water immersion, close doors and windows, and check and clean up flood drainage equipment, facilities, advertising signs, flower pots, etc.

(1) Check whether all doors and windows, especially double-door glass doors, are adequately protected and stable.

(2) Fix all items that are easy to loosen, especially those located on the roof and balcony. Some items that are easily blown down by the wind, such as flower pots, should be moved indoors or tied tightly.

(3) Check all drainage pipes, manholes, rainwater pipes, etc. , and remove the garbage, silt and sundries that may cause siltation.

(4) Ensure that all emergency appliances are available at any time, such as sandbags, raincoats, helmets, water boots, ropes, standby lighting, square timber (for fixing glass doors), etc.

(5) Check whether the drainage pump system is normal and unobstructed.

(6) Check whether the power generation system and its oil supply device are normal, and try to develop the motor set according to regulations.

(7) Turn off the neon power.

(8) Whether the intelligent system equipment runs normally.

(9) After the inspection, solve the problems found in time, and report to the leader immediately if there are any problems that cannot be handled.

3. In case of typhoon and rainstorm, the security officer on duty will strengthen the patrol of key areas and parts such as windproof and waterproof immersion, and check the condition of doors and windows. If there is broken window glass, they will rush to the scene as quickly as possible and temporarily cover it with plates. Maintenance personnel of the engineering department are on standby, and management service personnel at all levels stick to their posts. If there are complaints about equipment failure and potential accidents are found, emergency measures should be taken to solve them in time.

4, personnel at all levels to assist maintenance technicians to do a good job of flood drainage and water drainage.

5, in the typhoon, flood and other natural disasters and accidents, to prevent the occurrence of criminal cases.

(3) Post-disaster treatment

After the typhoon and thunderstorm, the engineering department organized maintenance personnel to inspect the equipment and facilities under its jurisdiction, and repaired them in time if any damage was found. The cleaning department inspected and restored the damaged trees in an attempt to minimize the impact of the disaster. The property manager reports the disaster and losses to the general manager of the company in time.

Property gale emergency plan 2 I. Purpose

1. Define the preventive measures and emergency handling procedures during the storm, and minimize the losses by taking active and effective preventive measures.

Second, the scope of application

1, Prevention of unexpected events such as storms in the property management area.

Three. accountability

(a) the customer service center is responsible for issuing early warning notices such as gale and rainstorm, arranging preventive work and handling emergency accidents during gale and rainstorm.

(two) the engineering maintenance department is responsible for the implementation of the inspection and prevention of the building itself, public facilities and mechanical and electrical equipment before the warning of strong winds and heavy rains.

(three) the order maintenance department is responsible for the implementation of the prevention work and the preparation of emergency response.

Fourth, the implementation procedures

(1) Early warning and prevention

1. After receiving the storm warning issued by the relevant departments, the management office will issue a written notice on the bulletin board to remind the owner (tenant) to take preventive measures before the storm comes, and if necessary, use the fire broadcast to issue a notice.

(2) Preventive preparation

1. The Order Maintenance Department arranges personnel to increase the number of patrols, focusing on the following items.

1. 1 Check and make sure that the external windows are closed.

1.2 Is there any danger that the roof suspension will be blown off by the wind?

1.3 days whether the billboard is firm.

1.4 Whether the billboard on the external wall is firm.

1.5 Prepare sandbags, wooden boards, ropes and other emergency supplies and appliances.

2. The Engineering Maintenance Department will assign special personnel to conduct a comprehensive inspection of the building body, public facilities, mechanical and electrical equipment and computer room, focusing on the following items.

2. 1 Whether the doors and windows of the machine room are closed (focusing on the generator room, elevator room, air conditioning room, water pump room, power distribution room and other equipment).

2.2 Whether the drains of ceiling, balcony, podium, rainwater well and sewage well are clear.

2.3 Ensure that the generator is in normal standby state, with sufficient fuel, and carry out commissioning test.

2.4 Check whether the working condition of the sewage pump in the basement is normal.

2.5 Prepare emergency materials and appliances such as submersible pumps and temporary wiring boards.

(3) When a strong storm and rain come.

1, when the rainstorm comes, ensure the smooth drainage of floor drains and ditches. When the wind increases, use sandbags to block doors and windows such as glass doors in the residential area whose front is affected by the wind.

2. During the gale, if the wind pressure is too large, which affects the normal operation of the elevator, the elevator operation can be suspended.

3. During the gale, strengthen patrol, and there may be falling objects. Some affected places can be temporarily closed, and the closed site can be lifted only after the danger is eliminated.

4. Situation tracking

4. 1 When the relevant departments issue the early warning of gale and rainstorm, the management office arranges special personnel to watch (listen) the latest news of typhoon and rainstorm issued by the meteorological department.

4.2 Management Office will arrange corresponding personnel to stand by in time according to the latest information released.

5. Employee control during gale and rainstorm

5. 1 All order maintainers are not allowed to take leave to go out and stand by at any time.

5.2 All employees in the management office are not allowed to turn off communication tools and stand idly by at any time.

5.3 When the meteorological department hangs a black rainstorm warning or a red gale signal, the director of the management office, the director of the engineering maintenance department and the director of the order maintenance department should all be present and on duty 24 hours a day, and the central control duty room will start the fire broadcast to issue a notice.

5.4 When the wind reaches level 6 or above, the maintenance personnel shall remove the stop of the passing car stopper in time to prevent the wind from breaking and injuring the car.

(4) Treatment after gale and rainstorm

The management office arranges personnel to clean up the site, take the initiative to visit the affected owners, and assist the affected owners to restore normal office order in the shortest time.

Property gale emergency plan 3 According to the notice and requirements issued by the property group company, this emergency plan is formulated in order to do a solid job in flood control of the company and all projects and ensure the property and personal safety of the company and the owner.

(a), the establishment of a leading group for flood control

Team leader:

Deputy team leader:

Members:

Responsibilities: responsible for the inspection and maintenance of drainage facilities and equipment of property management company and various projects to ensure that the drainage system is in good condition and effective; Strengthen the patrol inspection of each project, find leakage points in time, avoid short circuit and equipment damage caused by rain leakage, especially in the high-rise rooms of each project, and ensure normal power supply; Responsible for the maintenance of lightning protection facilities and equipment of various projects, and responsible for storing necessary flood control and disaster relief materials; In case of flood disaster, organize maintenance and rescue work in accordance with this flood control and disaster relief plan.

(two), set up four working groups under the command of the leading group for flood control.

1, establish a flood control and emergency rescue team.

Team leader:

Members:

Responsibilities: Carry out flood control and emergency rescue work under the command of the leading group for flood control. Each project manager organizes emergency rescue personnel to conduct a comprehensive inspection of each management area, determine the cause of the accident in the stagnant water area, formulate local emergency measures, and organize personnel to deal with it.

2. Set up an equipment support team.

Team leader:

Members:

Responsibilities: Under the command of the leading group for flood control, implement flood control and emergency rescue (water pump drainage). According to the actual situation of the project, each project reasonably organizes staff to use drainage pumps and other equipment to drain the areas with serious water accumulation, so as to ensure the normal management of each management area.

3. Logistics Support Team

Team leader:

Members:

Responsibilities: Under the command of the leading group for flood control, carry out emergency communication, statistics and logistics support. In the event of a flood, do a good job of information transmission and logistics support within the company, and after the flood, make a statistical summary of the losses caused by the flood.

4. Emergency rescue team

Team leader:

Members:

1. responsibilities: under the command of the leading group for flood control, provide flood control assistance. When there is a major danger in the project, staff will be sent to rescue in time.

2. Flood control materials: rain boots, raincoats, shovels, woven bags, flashlights, iron wires, drainage pumps, wire reels, etc. And there is a person who is responsible for ensuring that flood control materials are collected 24 hours a day.

Third, the project manager is responsible for flood control in various regions; Strengthen flood prevention awareness training, check the key parts in place, report the danger to the department or company leaders in time, and take active measures to avoid the danger from expanding.

Four, all flood control personnel must keep communication tools open for 24 hours during the flood control period.

5. In case of heavy rain above moderate rain, the project manager must be on duty; In case of rainstorm, a full-time duty system shall be implemented.

Six, when the office personnel on duty after receiving the notice of flood control, should promptly notify the leaders on duty and all the flood control personnel.

Seven, the project personnel on duty after receiving the owner for help information, should promptly notify the leaders on duty and the project department. The main members of flood control quickly went to the scene to check the situation and deal with it in time; When there is a large area of water in the management area, the staff should be quickly organized to rush to the scene, and relevant equipment such as pumps should be mobilized to dredge and drain, and at the same time, the company leaders should be reported.

Eight, at ordinary times the project office staff, back office staff, customer service staff should pay close attention to the weather changes, abnormal weather conditions should promptly notify the relevant staff, at the same time, do a good job of signing the personnel on duty during the flood control period, and record the major floods.

Nine, flood control materials should strengthen management, after the flood season to warehousing, for future use.

Property gale emergency plan 4 1.0 purpose

Through the establishment of this emergency plan, we will ensure that all emergency preparations are made before the sandstorm weather comes in spring and autumn, and the corresponding emergency treatment measures will be started when the sandstorm comes, so as to ensure the safety of property facilities and the cleanliness of the environment.

2.0 scope

It is suitable for emergency preparation and emergency treatment of sandstorm weather in spring and autumn.

3.0 responsibility

3. 1 The cleaning supervisor is responsible for checking the planning and implementation of the emergency plan for sandstorm weather;

3.2 The equipment supervisor is responsible for arranging engineering personnel to inspect and reinforce outdoor facilities and equipment;

3.3 The cleaning foreman is responsible for organizing emergency personnel and supervising the implementation of emergency measures;

3.4 The cleaner is responsible for implementing emergency measures according to this plan.

4.0 treatment plan

4. 1 emergency preparedness

4. 1. 1 Before the sandstorm season (June 10 to May of the following year) comes, the management office should prepare windproof cloth bags (strips filled with sawdust) and ensure that they can be taken away at any time;

4. 1.2 The equipment supervisor shall arrange personnel to check the integrity of doors and windows outside the public area of the building and repair the doors and windows that are not closed or damaged; Check outdoor light boxes, signs and other facilities and make necessary reinforcement;

4. 1.3 The cleaning supervisor pays attention to collecting the 36-hour weather forecast of Beijing Meteorological Observatory every day, and once he receives the gale forecast of magnitude 4 or above, he will inform the management office manager as soon as possible to prepare for sandstorm prevention;

4. 1.4 the management office can post the gale forecast on the bulletin board in advance to remind the operators to close the doors and windows to prevent losses caused by sandstorms.

4.2 Emergency measures for gale and sandstorm.

4.2. 1 Before the strong wind and sandstorm come, the regional cleaning staff and the floor patrol security guards should check the doors and windows of the public corridor on the floor in advance and close them in time to prevent the strong wind from blowing into the building, causing dust on the floor or broken glass;

4.2.2 Wind-proof cloth bags shall be laid under the glass doors and shutter doors at the entrance and exit;

4.2.3 Traffic signs and other movable signs placed on the periphery should be placed in sheltered places or put down in appropriate positions to avoid the damage or injury caused by strong winds to pedestrians and vehicles;

4.2.4 Peripheral facilities, such as access control facilities outside the lobby, parking meters, etc., should be covered to prevent dust from invading;

4.2.5 Put the green plants outdoors and try to move them indoors;

4.2.6 Prompt the operator to check and close the outer doors and windows, and remove the articles placed in high places near the outer windows.

4.2.7 When the strong wind comes, the glass door in the lobby will open inward to avoid breaking the glass due to the strong wind;

4.2.8 Check the surrounding light boxes, signs and tall green plants at any time, and carry out temporary reinforcement when necessary;

4.2.9 Clean the lobby and indoor public areas at any time to remove dust;

4.2. 10 Pay attention to falling objects when working around buildings.

4.3 Cleaning measures after strong winds and sandstorms

4.3. 1 thoroughly remove indoor and outdoor dust;

4.3.2 Peripheral cleaning personnel should pay attention to cleaning the fallen leaves and sundries in the nest wind area;

4.3.3 The removed or put down signs shall be erected or restored to their original positions;

4.3.4 Remove the covering of outdoor facilities;

4.3.5 The green plants placed outdoors are restored to their original positions;

4.3.6 Fixed signs, signs and other outdoor facilities should be scrubbed and dusted.

;