Traditional Culture Encyclopedia - Hotel accommodation - How to drain 30 rooms on the same floor of the hotel?

How to drain 30 rooms on the same floor of the hotel?

The hotel can drain water by lowering the plate.

The concrete operation steps of the plate lowering method are as follows:

1. lower the bathroom floor or partially lower it by 30 to 40 cm.

2. Lay horizontal drainage pipes in this space.

3. After laying the horizontal pipe, fill the sinking space with filling material.

4. Then make the bathroom floor.