Traditional Culture Encyclopedia - Hotel accommodation - The reserved shaft on the construction drawing has no door.
The reserved shaft on the construction drawing has no door.
There is no door in the reserved shaft on the construction drawing paper, so it is necessary to ask the person in charge of construction to ensure the construction safety, and there are potential safety hazards in the house.
Construction drawing refers to the general layout of the project, the appearance, internal layout, structural structure, internal and external decoration, material practices, equipment and construction requirements of buildings and structures. Construction drawings can be divided into building construction drawings, structural construction drawings and hydropower construction drawings. The construction drawing is mainly composed of drawing frame, plane elevation, detail drawing, compass, legend, scale and other parts. The drawing method of construction drawing in China has become mature.
- Previous article:How to be a good agent
- Next article:Weifang city specific introduction
- Related articles
- Tourism around Hejin and recommended attractions around Hejin
- What's the telephone number of the sales office at Yuheng Apartment 1 in Zhaoqing?
- What will be built west of Huaibei West Lake?
- Is the hotel exhaust fan installed in the stairwell?
- Thank you ~ two paragraphs about the hotel.
- Responsibilities of the administrative person in charge
- Urgent! ! Changzhou dinosaur park two-day tour, please be familiar with Changzhou jjmm guidance!
- Where is Hejian Longxi Hongfu Hotel?
- Where is the filming location of the Richest Hotel in Xihong City?
- HangzhouˇŻs preferential investment policies