Traditional Culture Encyclopedia - Hotel accommodation - K335 train schedule

K335 train schedule

As of April 2020, the k335 train has been out of service. The original timetable of k335 train is as follows:

K335 train runs from Chongqing North Station to Xiamen Station, passing through Chongqing, Guizhou, Hunan, Jiangxi and Fujian provinces. Chongqing North/KLOC-0 starts at 3: 20, and Xiamen arrives at 20: 50 the next day, with a total of 28 stops. On February 28th, 20 17, the K335 train stopped running.

Extended data

Direction of K335 train in yingtan-xiamen railway:

The yingtan-Xiamen Railway starts from yingtan, Jiangxi Province in the north, passes through Wuyishan at the junction of Jiangxi and Fujian provinces, and then extends along Futunxi Valley, a tributary of the Minjiang River, reaching Waiyang Station near Nanping. The line turns southwest and is built along Shaxi Valley, another tributary of Minjiang River.

Then it changes to the southeast near Yong 'an, crosses Daiyun Mountain, enters the Jiulong River basin in southern Fujian, goes down the river, passes through Jimei and Xiamen seawalls, and reaches Xiamen, with a total length of 705 kilometers (including Zhangzhou branch line 1 1 km). It connects with zhejiang-jiangxi railway in yingtan and Wainan Railway in Nanping Waiyang Station.

Baidu Encyclopedia -K335/4/5 Train

Baidu Encyclopedia-yingtan-Xiamen Railway