Traditional Culture Encyclopedia - Hotel franchise - Standard version of wooden floor sales contract model

Standard version of wooden floor sales contract model

Wood floor has become the first choice for people's floor decoration because of its outstanding advantages such as comfortable feet, natural warmth, elegance and generosity. How to write the sales contract of wooden floor? What do you usually need to pay attention to? The following is a sample of the wooden floor sales contract I compiled for reference only. Welcome to reading.

Model text of wooden floor sales contract 1

Seller: (hereinafter referred to as Party A)

Buyer: (hereinafter referred to as Party B)

According to the relevant provisions of the Contract Law of People's Republic of China (PRC), both parties reached the following agreement through consultation:

Article 1 Order Amount and Technical Parameters The product name, specifications, quality (technical indicators), unit price and total price of the _ _ _ _ wood floor ordered by Party B from Party A are shown in the following table:

Article 2 Deposits

When signing this contract, Party B shall pay a deposit of 10000 yuan to Party A..

Article 3 Time and place of delivery and payment settlement method

1, date: further notice

2. Place of delivery: further notice.

3. Payment settlement method:

Article 4 (1) When Party B notifies Party A to take delivery, it shall pay 30% of the total price of the plank.

(2) After the wooden floor arrives at Party B's construction site, Party B shall jointly pay the remaining payment within five days. If Party B fails to pay, it shall pay a penalty of 10% of the payment. The payment method shall be settled according to the actual area, and Party A shall be responsible for any quality problems within three years of warranty. During the warranty period, Party B shall notify Party A to carry out maintenance. If Party A fails to notify maintenance, Party A shall be responsible for the expenses incurred by Party B.. ..

(3) Party A's advance payment shall be paid within five days after Party B's acceptance.

Article 5 responsibilities of both parties

(I) Party A's responsibilities

1. If Party A fails to deliver the goods according to the quantity stipulated in the contract, Party B shall make up the missing part according to the quantity if necessary. If Party B needs and Party A fails to deliver the products, Party A shall pay Party B a penalty of 5% of the total value of the undelivered part.

2. If the delivery time of the products does not meet the requirements, Party A shall pay Party B a penalty of 5% of the total value of delayed delivery every day.

3. The wooden floor is a semi-finished product, and only through scientific installation method can it become a complete product. If the installation part does not meet the quality standards and use requirements, Party A shall repair or reinstall it in time, and the losses caused thereby shall be borne by Party A..

(II) Party B's responsibilities

1. If Party B changes the design, varieties, specifications and quality standards of the products midway, it shall pay a penalty of 5% of the total value of the changed parts.

2. If Party B returns goods midway, it shall negotiate with Party A in advance. If Party A agrees to return the goods, Party B shall pay Party A 50% of the total value of the returned goods as liquidated damages. If Party A does not agree to return the goods, Party B shall still receive the goods according to the contract.

3. If Party B fails to pay Party A on the specified date, Party B shall pay 65,438+00% of the total payment as liquidated damages for each overdue day.

4. If Party A delivers the goods after the contract is signed, and Party B refuses to receive the goods without justifiable reasons, Party B shall bear the losses, transportation expenses and 5% liquidated damages.

Article 6 Negotiation on Changing Technical Parameters of Products If there are major changes in raw materials, production equipment, production technology or market, Party A shall negotiate with Party B 30 days in advance to change product varieties, designs and specifications.

Article 7 Party A shall not modify the terms of the contract without authorization, and neither Party A nor Party B shall change or modify it without authorization. If one party independently changes or modifies this contract, the other party has the right to refuse to produce or receive the goods, and may require the party that changes or modifies this contract to bear all losses.

Article 8 Notice of Force Majeure

If Party A and Party B are unable to perform this contract due to force majeure, they shall promptly notify the other party and explain the reasons why they are unable to perform or need to postpone or partially perform this contract.

Article 9 Dispute settlement

In case of any dispute during the execution of this contract, Party A and Party B shall settle it through negotiation. If negotiation fails, either party may submit the dispute to:

1. Consumer Association applies for arbitration;

2. People's courts.

Article 10 the contract comes into effect

This contract shall come into effect as of the date of signature by both parties.

Article 11 Matters not covered

During the execution of this contract, if there are any outstanding matters, Party A and Party B shall settle them through consultation, and other supplementary terms are attached to this contract. All supplementary clauses have the same legal effect as this contract.

Article 12 number of contract copies

This contract is made in duplicate, one for each party.

A contracting party:

Party A: Party B:

Company seal: company seal:

Representative signature: Representative signature:

Date of signing:

Model text of wooden floor sales contract II

Party A (Buyer):

Party B (supplier):

Signing place: signing time: year month day.

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations; Following the principles of equality, voluntariness, fairness, honesty and trustworthiness, through friendly negotiation between Party A and Party B, Xiamen University Road 176 is built as a landmark hardcover house project; Buy solid wood floor from Party B .. reach the following material installation agreement and sign the project contract.

Article 1 Information on the wooden floor purchased by Party A:

Article 2 Contract Amount and Payment Method

1. The total contract amount is RMB (in figures); Capital RMB.

2. When signing the contract, Party A shall pay% of the total contract amount (RMB in words and figures) as the down payment.

3. Party B shall supply the goods according to the demand plan, and pay% of the total payment within seven working days after the goods arrive at the construction site and are confirmed by Party A.. floor

4. After installation and acceptance by Party B according to the engineering requirements (after acceptance according to Item 2 of Article 9); Party A shall calculate the expenses according to the actual installation area, and the loss of installation materials shall be within the scope of national certification, and the excess shall be borne by Party B). Pay% of the total payment within seven working days (RMB in figures and RMB in words).

5. After negotiation between both parties, when the project is settled, Party A will collect Party B's quality deposit at one time according to the total contract amount, with the amount of RMB in words. The quality guarantee fund shall be paid to Party B at one time without interest within ten working days after one year.

Article 3 Mode of transportation and expenses

1, the supplier is responsible for transporting it to the designated construction site and bearing the transportation expenses.

2. The supplier shall be responsible for any unexpected losses during the supply period.

Article 4 Supplier's Responsibility

1, providing qualified products. Ensure that the products meet the national environmental protection standards,

2. Ensure the delivery and installation cycle.

3. The supplier shall provide the product certificate and inspection report to the buyer within three working days after confirming the payment of the deposit.

Article 5 responsibilities of the buyer

1, the construction site must have a flat and dry ground; The height difference per square meter is not more than two millimeters.

2. At the construction site, Party A shall indicate or explain the concealed works and buried positions of cables, wires and water pipes. (Party B is not responsible for any problems or losses)

3. Party A is responsible for providing the site that meets the construction requirements; Provide water and electricity for construction free of charge (designate temporary warehouse for Party B's use).

4, according to the terms of the contract to pay the project, shall not be in arrears; Otherwise, suppliers have the right to dispose of their products by themselves, and enjoy the right to sue and other related rights.

5. If there is any abnormality (tatami, triangle, arc) outside the model room, the unit price of the apartment will be increased by/㎡ as expenses for loss, auxiliary materials, labor and hardware.

6. Through friendly negotiation between Party A and Party B, there is no management fee and project cooperation fee for the sectional works on this floor.

Article 6 Time limit for a project is delayed

1, engineering quantity changes, and both parties negotiate the construction period.

2. The construction site is blocked, and the construction period of this project cannot be postponed due to power grid transformation.

3. If the construction period is delayed due to force majeure, both parties shall negotiate the construction period separately.

Article 7 Liability for breach of contract

After the contract is signed, both parties shall strictly perform the contract; If either party breaches the contract without justifiable reasons (except for force majeure), it shall bear 5‰ of the total contract amount as liquidated damages (calculated on a daily basis). Pay the other party liquidated damages.

Article 8 Dispute settlement

Any dispute between Party A and Party B during the performance of this contract shall be settled through friendly negotiation. If negotiation fails, both parties may apply for arbitration or bring a lawsuit to Shuangliu County People's Court for settlement.

Article 9 Acceptance Agreement

1. The building number is provided by Party A.

2. Party B shall be responsible for the installation according to the specifications, and Party A shall organize personnel to seal the samples (sample room); The sample room is an accepted standard.

3. After the installation is completed, Party A shall organize personnel to accept one set of samples as a standard and hand in another set of samples.

Article 10 Other agreements

1. If the floor is damaged due to cross construction or human factors (such as water pipe burst, water leakage, switch socket maintenance, etc.). ) After the installation and acceptance, the floor shall be replaced at the market price of RMB/㎡, and the cost of artificial auxiliary materials shall be calculated separately.

2. The newly added quantities and materials outside the contract shall be signed by Party A and Party B separately through negotiation, and shall be regarded as the annexes of the formal contract and settlement basis, which have the same legal effect.

3. This contract shall come into effect as of the date of signature and seal by both parties, and on the same day after the deposit of this contract is paid to the supplier's account.

4. This contract is made in duplicate, one for each party, with the same legal effect.

5. Attach the maintenance instructions for the service life of the floor.

Party A (official seal): Party B (official seal):

Project address: legal representative: legal representative:

Tel: Tel:

Bank of deposit: Bank of deposit:

Account number: Account number:

Signing time: Year Month Date Signing time: Year Month Date

Model text of wooden floor sales contract 3

Supplier:

Demand side:

According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, on the basis of equality, mutual benefit and friendly negotiation, both parties have reached the following agreement on matters related to the sale of templates from suppliers to buyers:

Note: The number of templates in the above table is the budgeted quantity, the actual quantity is calculated according to the construction needs, and the price is calculated according to the actual quantity.

2. Quality and technical standards: The quality shall be subject to the samples taken by the buyer from the supplier. If it is not in conformity with the sample, the supplier shall replace the products that meet the requirements of the buyer within five hours, otherwise, the buyer has the right to terminate the contract and charge the supplier 20% of the total payment as liquidated damages.

3. Place of delivery: New Century to Hanfeng Lake Hotel, Kaizhou Avenue, Kaixian County.

4. Transportation and transportation expenses: The supplier shall handle the transportation, and the expenses shall be borne by the supplier. The demander plans to deliver the goods on time.

5. Delivery time: the buyer will inform you three days in advance, and the supplier will supply unconditionally within three days. Otherwise, the buyer will charge the supplier 20% of the total amount as liquidated damages.

Settlement method and time limit of intransitive verbs: after each batch of goods arrives at the buyer's site and passes the acceptance, all the payment will be paid within one week.

Seven. Ways to solve contract disputes: in case of contract disputes, both parties shall settle them through consultation; If negotiation fails, it shall be settled through litigation in the local court.

Eight. Liability for breach of contract: if one party breaches the contract, it shall pay the other party a penalty of 20% of the total payment.

Nine. This contract is made in duplicate, one for the supplier and one for the buyer, and shall come into effect after being signed and sealed by both parties.

Supplier: Demander:

Tel: Tel:

Year, month, sun, moon, sun.

Articles related to the standard version of the model contract for the purchase and sale of wooden floors;

★ Template for Purchase and Sale Contract of Wood Floor

★ Template of Wood Floor Purchase Contract

★ Model floor sales contract

★ 2020 Floor Sales Contract Model Complete Collection

★ Latest 2020: 3 pieces of wooden floor sales contract model.

★ The latest model of the wooden floor sales contract.

★ Simplified floor purchase contract model 3 latest article

★ The sales contract of wooden floor is simple, with 3 model articles.

★ 3 concise model clauses of ship sales contract

★ The latest floor purchase contract model essay 3 latest.