Traditional Culture Encyclopedia - Hotel franchise - Ask for the hotel kitchen contract agreement?

Ask for the hotel kitchen contract agreement?

Employer: (hereinafter referred to as "Party A")

Contractor: (hereinafter referred to as "Party B")

According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, in order to ensure the smooth progress of the project, Party A and Party B enter into this contract (including its annexes and all supplementary contracts) through friendly negotiation on the basis of equality, voluntariness and unanimity for common compliance.

Article 1 General situation of the project

1. 1 project name:.

1.2 Project location:.

1.3 project contents and practices (see: project budget quotation sheet and construction drawing for details).

1.4 project contracting method: both parties agree to adopt the following _ _ _ contracting method.

(1) Party B contracts labor services and materials.

(2) Party B contracts some materials and Party A provides some materials (see details of decoration materials provided by Party A and decoration materials provided by Party B);

(3) Party B's contracting and Party A's contracting (see the list of decoration materials provided by Party A for details).

1.5 The construction period is _ _ _ calendar days, and the commencement date is _ _ _ _ _ _ _ _ _ _ _.

1.6 contract price: please refer to the quotation sheet of project budget for the project cost of this contract. If there is any increase or decrease in the construction project, both parties will increase or decrease the cost after negotiation and signature confirmation.

Article 2 Construction drawings

Both parties agree that the construction drawings shall be provided in the following ways:

(1) Party A shall design and provide the construction drawings in duplicate, one for Party A and one for Party B (see the design drawings of the decoration project for details);

(2) Party A entrusts Party B with the design and construction drawings in duplicate, one for Party A and one for Party B (see: Design Drawings for Decoration Engineering), and the design fee is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3 Obligations of Party A

3. 1 _ _ _ days before commencement, to create conditions for Party B to enter the site for construction. Including: on the principle of not affecting construction, demolishing or stacking indoor furniture and furnishings, and covering indoor furniture and furnishings that are not easy to move; If Party A fails to take necessary protective measures, resulting in the loss of furniture and furnishings, Party A shall be responsible for this.

3.2 Be responsible for the application, approval and other procedures involved in the construction, and pay all expenses of the property management office and approval.

3.3 Responsible for providing water and electricity needed for construction;

3.4 Responsible for coordinating the relationship between Party B and its neighbors and property management office;

3.5 The indoor load-bearing structure shall not be demolished. If it is really necessary to dismantle the non-load-bearing structure or equipment pipeline of the original building, go through the corresponding examination and approval procedures with the relevant departments;

3.6 During the construction period, Party A still needs to use part of the site, and is responsible for public security and fire control at the construction site;

3.7 Participate in the inspection and supervision of project quality and construction progress, handle matters such as acceptance and change registration procedures, and be responsible for the material entry and completion acceptance.

3.8 Provide self-purchased materials for construction on time, with good quality and quantity.

Article 4 Obligations of Party B

4. 1 is appointed as the site supervisor of Party B to be responsible for the performance of this contract; Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and handle and solve all matters that Party B is responsible for.

4.2 Strictly implement the safe and civilized construction operation specifications, fire safety regulations, construction specifications and quality standards during construction, and complete the project with good quality on schedule;

4.3 Strictly implement the relevant regulations of construction site management, carry out safe and civilized construction in strict accordance with drawings or instructions, and make various quality inspections and construction records;

4.4 Protect indoor furniture and furnishings in their original places, and ensure smooth indoor plumbing;