Traditional Culture Encyclopedia - Hotel franchise - 20 18 how to set up a fixed scaffold project in Shanxi

20 18 how to set up a fixed scaffold project in Shanxi

The frame structure of 20 18 Shanxi scaffolding is set as follows:

1, a set of building scaffolding, scaffolding within 3.3 m, extraction within 3.3m, vertical projection area of the wall.

2. A set of construction scaffolding. For every increase of scaffolding within 10m, the unit price of 1.2m is multiplied by 0.5, and the extraction amount is the vertical projection area of the wall within 3.3m to 3.37m..