Traditional Culture Encyclopedia - Hotel franchise - What should the grille ceiling of the storefront be decorated with? What are the installation methods of lamps on the grille ceiling?
What should the grille ceiling of the storefront be decorated with? What are the installation methods of lamps on the grille ceiling?
Elastic line, use the balance measuring instrument to copy out the horizontal points of each wall column or corner in the space, pop up the horizontal line, then measure it from the horizontal line to the design height of the ceiling, and pop up the pink horizontal line along the wall column, which is the lower leather line of the ceiling grille. At the same time, the position of the main keel on the concrete roof should be popped up. Generally speaking, the main keel is divided from the center of the ceiling to both sides, and the maximum spacing is1000 mm. Mark the fixed point of the boom. Fix the suspender, and prepare Ф 6 cold-drawn steel or round steel rod and expansion bolt. One end of the grid suspender is welded with L30*30*3 angle code, and the other end can be equipped with self-tapping screws above 100㎜, or purchased finished screws for welding.
Install light steel keels and prepare 38 light steel keels with a spacing of 900mm to1000 mm. The springing height of the light steel keel is 1/200- 1/300 of the room span, and the grid ceiling of the cantilever part of the light steel keel should be less than or equal to 300mm, otherwise it is necessary to add suspenders. The length of the main keel shall be butted, and the butting of adjacent keels shall be staggered. Light steel keel should be basically flat after hoisting.
Note: For the grid ceiling with a span greater than 15m, a large keel is added to the main keel every 15m, and the vertical main keel is welded firmly. Install the spring, connect the suspender with the light steel keel at a distance of 900mm- 1000mm, and then clamp the spring piece on the suspender. (If the grille ceiling is low, the spring can be directly installed on the suspender, and this step can be omitted). Assemble the main bone and auxiliary bone of the grille. Before installing the main bone and auxiliary bone of ceiling grille, assemble the main bone and auxiliary bone of ceiling grille on the ground according to the requirements of design drawings, which saves the trouble and inconvenience of operation on it. Install the grille, hang the assembled grille ceiling in the main bone hole with the hook, connect the ceiling of the whole grille ceiling, and adjust the level.
- Previous article:The telephone number of Daozhou Third Street Hotel
- Next article:Introduction to the plot of Bad Kids
- Related articles
- What time does Yi Jia 365 check out?
- How about Chongqing Yishe Sanzhai Decoration Design Engineering Co., Ltd.
- How many wedding group chats should be created? Why create a wedding group chat?
- Which hotels in Xinxiang have electric beds?
- I want to reserve a luxury hotel for customers coming to Chengdu. Do you have any recommendations?
- Is there any interesting place in Huangshi?
- What is the telephone number of Xi 'an Shaanxi Cuiyuan Jinxiu Store Marketing Center?
- What bus should I take from Xingsha to Furong District Health Building?
- Accommodation in Dengfeng City
- Reasons for cancellation of hotel reservation service and poor service attitude of employees