Traditional Culture Encyclopedia - Hotel reservation - Introduction to the construction project of Yunyan stupa in Yingjiang, Dehong?

Introduction to the construction project of Yunyan stupa in Yingjiang, Dehong?

Railway travel is closely related to people's daily life, so what are the construction scale and architectural characteristics of each station? The following is a detailed introduction of China Railway Station, Railway Station and high-speed railway station brought by Zhong Da Consulting.

Changchun West Railway Station covers an area of 95,600 square meters. It is located in the east of West Fourth Ring Road, south of Jingyang Road, west of West Third Ring Road, and north of Gigi Lai West Street and Policeman Road. It looks like an old-fashioned pen tip and faces northeast. The revised planning scope is expanded to 6,543,800+0.2 million square meters, and Zhanqian District is a comprehensive area integrating residence, shopping, culture and leisure. Changchun West Railway Station will become the "West Gate" of Changchun.

The first platform of Changchun West Railway Station is an international customs clearance port station. The renovation project is mainly to transform the lighting facilities of a platform, build a sunshade and increase the number of platforms. The reformed platform will provide a more spacious, bright, comfortable and convenient ride environment for Chinese and foreign tourists. The project has been completed, which also marks the completion of the transformation of the platform of the West Railway Station which lasted for nearly two years.

General situation of Changchun West Railway Station

fire brigade

Changchun West Railway Station is not high, with only three floors, but its construction area has reached nearly 60,000 square meters. There are many options for entering and leaving the station, but the general principle is "up and down". If citizens come on foot, they can enter the railway station directly from the station square through the main entrance on the first floor. If they come by taxi, they can enter the railway station through the elevated driveway in front of the second floor. For the convenience of passengers, toilets are set up in many places inside the station building, and the environment is very good.

underground passage

Changchun West Railway Station can enter the underground passage on the first floor by elevator or stairs. This passage is 175 meters long from north to south and 54 meters wide from east to west. This area is divided into three parts, in which there are passenger exit passages with a width of 15 meters on the left and right, and the area with a width of 24 meters in the middle is a north-south communication passage, through which citizens can travel back and forth between the north and south squares. In addition, the exit to the subway and underground parking lot is reserved in the design of this underground passage, and two underground floors of Metro Line 2 and Line 6 are reserved.

Waiting hall

Walk along the lobby on the second floor of the station building, which is the elevated waiting hall of the West Station. This hall with more than 5000 seats can accommodate 10000 people at most. The whole hall has no columns and a wide view. There is a skylight from south to north in the middle of the ceiling, through which sunlight can shine directly into the hall.

There is no separate waiting room in the lobby of Changchun West Railway Station, but the designer used seats to conceptually divide the lobby space. In addition, the West Railway Station has also planned two or three VIP waiting rooms and waiting areas for special groups such as soldiers, pregnant women and disabled people. There are more than 40 escalators and elevators in the whole station building and waiting area to provide convenience for passengers.

platform

Changchun West Railway Station initially plans to build five platforms, 1 1 railway line, all of which are high platforms. The height of 1.25m makes the platform basically flush with the train floor, which saves a lot of effort in carrying heavy luggage and saves the trouble of taking stairs for people with inconvenient legs and feet.

The canopy without platform columns is also a highlight of this structure. The canopy covers an area of 43,098 square meters and covers a huge platform. On each platform, there are two escalators, two sets of stairs and two helicopters connected to the waiting hall. Passengers can enter the platform from the waiting hall. There are three paths to choose from. This design will provide great convenience for passengers with heavy luggage or inconvenient legs and feet.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.