Traditional Culture Encyclopedia - Hotel reservation - Epoxy Teyue Stone Floor Paint 4. the key technical indexes

Epoxy Teyue Stone Floor Paint 4. the key technical indexes

Color: gray

paste

Degree: applicable -4 cups ≥90 seconds (25℃)

Pencil hardness: HB-H.

Be able to endure

rush

Strike: 30 cm

enclose herewith

be dressed

Force: (circle method) level 2

Dry film thickness: 35μm

Theoretical dose:150g/m2

Drying time (25℃): surface dryness ≤15min.

Effort ≤ 16

An hour's time or journey

Wet film thickness:

60 ~ 70 microns

Dry film thickness:

20~25um

Theoretical dose:

0.13 ~ 0.17kg/_ _ _ _ _ _

Repainting time:

The shortest time is 12 hour, and the longest time is none (zinc salt is not formed on the surface of paint film).

Storage temperature: 0℃ ~ 40℃

Shelf life:

One year.

Original paint state: the paint base is flowable slurry and the curing agent is liquid.

Mixing ratio: main agent: curing agent = 100:25 (weight ratio)

Solid content: 58-67%

Specific gravity: 1. 18 ~ 1.25

Salt spray resistance: 96 hours

Impact strength:

50 (kg/cm)

Coating thickness: dry film: 20 ~ 25 microns/lane; Wet film: 50 ~ 60 microns/lane

Theoretical value: 0. 14-0. 16kg/ m2.

Actual value: It is related to many factors such as surface treatment, external environment and construction methods.

blink

Point: above 25℃

Construction data:

① Mixed service life: 6 hours.

② Temperature (℃): 25

Construction method:

(1) air spraying or airless spraying, and small area repair can be brushed.

② The spraying pressure is 0.3 ~ 0.6 MPa.

③ Dilution rate

0 ~ 10% (volume ratio)

④ Diluent: Special diluent.

⑤ Construction temperature: 5℃ ~ 40℃