Traditional Culture Encyclopedia - Hotel reservation - Real estate introduction of Mudanjiang Jingbo Town

Real estate introduction of Mudanjiang Jingbo Town

Jingbo Town takes "Awakening the sleeping volcanic platform, showing the charm of the universe and nature, and creating a new world of human life" as its theme, and aims to create a high-level leisure and holiday park. , mainly set up functional areas such as style villa area, residential development area, farmland protection area, geological park sightseeing area, cliff landscape area, hot spring club area, public green area, environmental park area, etc. The total investment in the first phase will reach 5 billion yuan.

The planning of Jingbo Town mainly highlights the "five major characteristics": the characteristics of fire culture, the characteristics of green space, the characteristics of multi-cultural injection, the characteristics of international leisure tourism destinations and the emphasis on creating a low-carbon and environmentally friendly Characteristics of life.

After completion, Jingbo Town will operate "ten major categories of characteristic tourism products":

1. Huoshang Geological Sightseeing Area

2. Water and Ice and Snow Park 1.4 million square meters

3. Comprehensive camping area 1.5 square kilometers

4. Commercial street with the theme of Flower Street, the commercial area on both sides of the commercial street will reach 100,000 square meters.

5. In the wooden house village and brick-concrete hotel area, independent hotels with property rights ranging from 85 square meters to 400 square meters will be built in this area. We will absorb many projects from Japan, the United States, Spain, etc. elements, while also inheriting the traditional Tang Dynasty style architectural area.

6. The World Geopark protects the tourist area A, and a unique lava golf driving range and golf club will be built in the tourist area.

7. "Xiao Nan Guo" is a large-scale ecological entertainment and sightseeing area, covering an area of ??120,000 square meters. The main body will use a glass dome structure to house an insect pavilion, a tropical rainforest pavilion, a fish viewing pavilion, and themed agricultural tourism.

8. Build a five-star hot spring hotel and international conference center covering an area of ??about 6,000 square meters. The hotel overlooks the Jingbo Canyon and will be able to host international conferences of 500 people.

9. An exotic neighborhood covering an area of ??250,000 square meters. There is a 1.2-kilometer-long underground pedestrian commercial street in the neighborhood.

10. Build a scenic park along the river that integrates plant viewing, leisure walks, cultural exhibitions and other functions.

After the completion of Jingbo Town, it will become the tourism industry cluster with the strongest reception capacity, the best supporting services, the most complete leisure facilities, the most distinctive characteristics and the strongest radiation effect in Mudanjiang. It is expected that after completion and operation, it can form a fixed asset investment of 8 billion yuan, receive 15,000 tourists per day, add 2,500 new employees in tourism and related industries, and have more than 5,000 leisure people purchasing second homes, and can attract 5 million tourists annually. person times, the annual total tourism revenue can be 5 billion yuan, of which domestic tourism revenue is 3.5 billion yuan and foreign tourism revenue is 221 million US dollars, driving Mudanjiang’s tourism revenue to grow by more than 20%.

Since the groundbreaking ceremony for the construction of Jingbo Town was held on April 22 this year, there have been Heda Highway-Jingbo Town Landscape Avenue, the town’s middle ring road, geothermal exploration, groundwater drilling, and marketing displays. The center, "wooden house village", property rights hotel, style commercial street, gas station, green belt along the river and other projects have started construction, among which:

The Heda Highway-Jingbo Town Landscape Avenue project was launched in May Construction started on the 8th. The total length of the route is 11.2 kilometers. It is constructed according to the first-class highway standard. The design speed is 60 kilometers per hour. It has a white road surface, two-way four lanes, a roadbed width of 26.5 meters, a central separation width of 8 meters, and a greening width of 10 meters on both sides. , the Fruit Tree Farm Bridge across the Mudanjiang River is designed as a landscape bridge and is scheduled to be completed and opened to traffic in October 2011.

The total length of the middle ring road in the town is about 6 kilometers, two-way four lanes, black pavement, and the red line of the road is 27 meters wide (at its narrowest point). At present, the bidding work for four bidding sections has been completed. The construction unit has entered the site, all topsoil has been cleaned, excavation is basically completed, filling is 40% completed, and trench blasting operations have begun. It is expected to be completed and opened to traffic in October this year.

In the first phase of Wooden House Village, 31 single wooden structure villas will be constructed, with a total construction area of ??approximately 10,000 square meters. At present, 6 of them have been basically completed and all are expected to be completed and delivered in September this year.

The brick-concrete structure property hotel plans to complete the construction of 99 main buildings this year, with a total construction area of ??8,000 square meters. At present, the house type plan has been determined, and the construction drawing design has been completed. The locations of all buildings have been determined, and five construction units have entered the site to start construction.

World Geopark Sightseeing Protection Area A plans to complete 400,000 cubic meters of earthworks this year, and construction has begun. So far, 300,000 cubic meters of earthworks have been completed.

The city marketing center is a small town project display center. It is located at the intersection of Taiping Road and Caiyuan Street in the city. It covers an area of ??830 square meters and a total construction area of ??215 square meters. It has been installed and will be installed in 8 this year. It will be officially put into use in the middle of this month.

The underground commercial street is about 1.2 kilometers long, 30 meters wide and 5 meters deep. Construction has started and nearly 10,000 square meters of earth and rock have been excavated.

The fuel and gas supply center covers an area of ??30,000 square meters and supplies gas to the town. It is expected to be put into use in September this year.

This year, the green belt along the river will be first launched with an area of ??100,000 square meters. It is part of the park along the river. The design and construction bidding work has been completed. More than 10,000 cubic meters of land have been concentrated for greening, and micro-terrain processing has been completed. Official start of work in mid-August.