Traditional Culture Encyclopedia - Hotel reservation - The requirement for construction between the three areas of the disinfection supply room is that actual barriers must be established, right or wrong?

The requirement for construction between the three areas of the disinfection supply room is that actual barriers must be established, right or wrong?

It is correct that the construction requirement between the three areas of the disinfection supply room is to establish actual barriers. The basic requirements clearly state that the work area is divided into decontamination area, inspection packaging and sterilization area and sterility area. Item storage area. There should be physical barriers between the three zones.

The three divisions of the disinfection supply room, the decontamination area and the inspection, packaging and sterilization area, should be equipped with buffer rooms and article transfer channels respectively. The office area includes staff locker rooms, duty rooms, offices, and rest rooms. Room, bathroom, etc.

The construction of the sterilization supply room should be close to the operating room and adjacent departments, or should have a direct transfer channel for items with the operating room. At the same time, the building area should comply with the provisions of hospital construction standards, and at the same time, future development planning can be taken into account. need.