In today's society, people use the responsibility letter more and more. The responsibility letter is a system established through examination, reward and punishment according to the prescribed working standards. So do you really know how to make a responsibility book? The following is my fire safety responsibility book for reference only. Let's have a look.

Fire safety responsibility 1 lessor: xx co., ltd.

(hereinafter referred to as Party A)

In order to maintain the construction order and internal fire safety of Party A's Zhuo Zhan Beijing Store (hereinafter referred to as the "Shopping Center") located at No.69 Fuxing Road, Haidian District, and ensure the safety of property and personnel in the shopping center, this responsibility letter is signed in accordance with the principle of "whoever constructs is responsible".

1. Party B who works in the shopping center shall sign this responsibility letter, and Party B shall implement all the safety management regulations of Party A. ..

2. Party B shall appoint a fire safety supervisor among Party B's personnel and report to the safety department of Party A for the record. The fire safety supervisor of Party B is fully responsible for the fire safety supervision and prevention work of the unit. If there is any personnel change, the person in charge of fire safety shall be re-appointed, and the safety department of Party A shall be notified in writing to change the information within one working day after the personnel is determined.

3. Before entering the construction site of the shopping center, Party B shall conduct fire safety training for its personnel to ensure that all its personnel can master fire safety knowledge, fire fighting and escape skills and relevant construction management regulations of the shopping center, and consciously abide by them.

4. The legal representative of Party B or the client authorized by the legal representative shall handle all the entry formalities for its construction personnel before they enter the shopping center, and purchase accident liability insurance for Party B's personnel and all Party B's property.

5. Party B shall equip the corresponding number of fire-fighting equipment according to the fire-fighting regulations before the construction site, and increase the number of fire-fighting equipment according to the actual situation on site during the construction process.

6. Without the written permission of Party A, Party B shall not change or use the fire-fighting equipment and facilities in and around the construction area, so as to allow Party B to change the fire-fighting facilities on the construction site.

7. Without Party A's written permission, Party B shall not misappropriate Party A's fire-fighting equipment and facilities in the decoration area and surrounding areas without authorization. Party B shall undertake the obligation to keep the above-mentioned equipment, and shall be responsible for compensation if it is lost or damaged.

VIII. When Party B uses naked flame and cutting operations on the construction site, it shall be supervised by special personnel and equipped with corresponding fire-fighting equipment. For hot work, it shall hold a nationally recognized operation certificate and a hot work certificate issued by the security department. It is strictly forbidden to do hot work without a license.

9. Party B shall pay attention to the safety of electricity consumption at the construction site. Non-professional electricians are not allowed to connect electricity, wiring, high-power lighting (iodine tungsten lamp, hot water boiling stick, electric heater, etc.). ), the construction site is not allowed to use household electric charging and other electrical equipment.

X. Party B shall be responsible for the fire control and public security situation within the jurisdiction of the construction, carefully check the water and electricity situation on the site before and after the construction every day, rectify any hidden danger in time, and report to Party A if the circumstances are serious. ..

XI。 In case of emergency during construction, Party B's personnel are obliged to report to Party A in time and fully cooperate with Party A's personnel. In case of loss of construction area due to concealment, Party B within the construction area shall bear all legal responsibilities and consequences.

12. If Party B and its personnel violate Party A's management regulations during the construction period and cause corresponding consequences, Party B shall compensate Party A for its losses.

Thirteen. This agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties. The promises, guarantees and agreements made by both parties shall be consciously observed by both parties, and any violation or falsehood shall be regarded as breach of contract. If it is caused by the breaching party's breach of contract, including but not limited to related accidents and losses of all parties (including third parties), the breaching party shall handle it and bear all expenses. At the same time, the observant party has the right to require the defaulting party to bear corresponding responsibilities according to relevant laws.

The construction unit fully understands the above terms and promises to strictly implement them.

Lessor: Beijing Wukesong Cultural and Sports Center Co., Ltd. (seal):

Signature of person in charge:

Date:

Contact telephone number:

Construction party: commercial construction company (seal):

Signature of person in charge:

Date:

Contact telephone number:

Responsibility Letter for Fire Control Construction Safety 2 According to the national fire control regulations and relevant regulations, this responsibility letter is specially signed to ensure the fire control safety during the hotel decoration construction and clarify the fire control safety responsibilities of both parties.

Party A: New Yangtze Hotel (Security Department)

Party B:

I. Party A's responsibilities:

1. Before the construction, Party B's construction personnel shall conduct a fire safety training and education, so that the construction personnel can master the "three understandings and three skills" of fire control (knowing the unsafe factors and fire prevention measures in the production operation, knowing the fire escape method, knowing how to put out the initial fire, giving an alarm, using various fire-fighting equipment, and organizing personnel evacuation) and the relevant management system of the hotel, which shall be distributed by Party A to Party B's construction personnel.

2. Party A is responsible for supervising and inspecting the fire safety of Party B's construction site. Conduct a fire inspection every day, urge the rectification of fire hazards on the construction site, and be responsible for supervising the allocation of fire-fighting equipment on the construction site.

3. Party A is responsible for supervising and managing the installation of power lines on Party B's construction site. Sheath line insulation must be used for temporary electricity use, and sockets and plugs should be protected by reliable insulation. You can't use bare wires instead of plugs, and the lines can't be overloaded.

Two. Party B's responsibilities:

1. When entering the construction site, Party B must consciously abide by the rules and regulations of the hotel and must wear a construction pass. If there is no construction pass, the hotel security department will treat it as a non-construction person.

2. Party B must carry out the construction in strict accordance with the requirements of the "Fire Prevention Audit Opinion of Building Design" of the fire department.

3. Party B's personnel are prohibited from smoking or using fire in the construction site, and obvious signs are posted. When it is really necessary to use naked flame in construction, it must be approved by the hotel security department, and fire prevention measures, guardians and fire extinguishing equipment should be implemented as required.

4. Party B must remove combustible materials such as sawdust and shavings from the construction site every day. Dangerous goods such as oxygen cylinders and acetylene cylinders after operation shall be stored according to the regulations of Party A's security department. ..

5. Party B shall keep the electrical equipment used in the construction site in good working condition, cut off the power supply in time after work, and eliminate hidden dangers.

6. Party B shall strictly control the use of dangerous chemicals such as adhesives and paints when decorating walls, chandeliers and laying carpets, and shall not store them in the construction site.

7. When Party B needs to change the hotel fire control facilities at the construction site, it shall obtain the approval of the hotel engineering department, security department and local fire control department.

8. After work every day, Party B must conduct a comprehensive fire inspection on the construction site. After confirming that there is no fire hazard, Party B will cut off the relevant power supply and close the construction site.

9. Party B shall be responsible for the night fire safety of the construction site.

Three. Liability for breach of contract:

1. If both parties fail to comply with the provisions of this book and a fire accident occurs, the legal responsibility of the person responsible for fire prevention shall be investigated according to relevant national laws and regulations.

2. Party B will be fined 50~ 100 yuan for violating the provisions of this book. In violation of these regulations, causing fire, in addition to compensation for economic losses, and in accordance with the relevant laws and regulations of the state, the legal responsibility of the person in charge of fire control of the construction unit and the parties concerned shall be investigated.

This responsibility book is made in quadruplicate, and each party holds two copies.

Party A (seal): Party B (seal):

Person in charge of fire prevention of Party A: person in charge of fire prevention of Party B:

Year, month, sun, moon, sun.

Responsibility Letter for Fire Control Construction Safety 3 In order to ensure the fire control safety in the construction process and prevent the fire from happening, this responsibility letter is specially formulated according to the Fire Protection Law of People's Republic of China (PRC) and the Regulations on Fire Control Safety Management of Organs, Organizations, Enterprises and Institutions of the Ministry of Public Security, and it is determined that (the construction unit and the specific responsible person) is the person responsible for fire control in this construction area. Its responsibilities are as follows:

A, the construction site fire safety by the construction department (or unit) is responsible for. During the construction, we must strictly abide by the fire laws and regulations, industry rules and regulations, prohibit illegal command and operation, and put an end to violations of labor discipline. The security department of the construction unit is responsible for supervising and inspecting the fire prevention director of the construction party to do a good job in fire safety, and the construction party must cooperate seriously.

Second, the equipment used in the construction must comply with the fire safety regulations, strict fire prevention measures, and illegal operations are strictly prohibited. The power supply must be connected with the assistance of the electrician of the construction unit.

Three, the use of open flame on the construction site, must go through the formalities for examination and approval in advance, and can only work after approval. Electric and gas welding operators must hold relevant certificates, and the fire-fighting site must be equipped with necessary fire-fighting equipment, and clear personnel shall supervise the removal of surrounding combustible materials; After the hot work, it must be carefully checked to completely extinguish the residual fire.

Four, the construction needs to use gasoline, paint remover and other flammable items, must comply with safety regulations. Flammable goods should be stored in a special warehouse and kept by a special person. Flammable and explosive articles should not be stored in the construction site.

5. Flammable liquids such as paint remover are not allowed to be used in large areas during construction, and painting operations should not be carried out on site as far as possible. If on-site painting is needed, there should be good ventilation and measures to prevent open flames.

Six, the use of flammable and explosive chemicals in construction should be limited; No repackaging and seasoning in the workplace; It is forbidden to use liquefied petroleum gas cylinders and acetylene generators on the construction site.

Seven, engineering construction, such as the impact of the original fire facilities and the use of fire equipment, must be reported to the fire control institutions for approval in advance, and take effective measures.

Eight, the construction of the pile and garbage shall not occupy fire control facilities, fire exits, corridors, stairs and other evacuation routes shall not be blocked.

Nine, fire safety education and escape, self-help skills training for all construction personnel in this unit, so that they can master and use the equipped fire control facilities and equipment.

Ten, fire control work in the process of construction should be regularly checked and summarized, and at the same time accept the inspection and supervision of fire control institutions.

Eleven, fire fighting should actively organize, organize and guide the evacuation of personnel present, and obey the unified command of the on-site commander.

Twelve, after the fire is extinguished, to protect the scene of the fire, to assist the relevant departments to investigate the cause of the fire.

Fourteen, this responsibility shall take effect from the date of signature, until the project is completed, and the construction unit leaves the site.

15. This responsibility book is made in duplicate, with each party holding one copy.

Construction unit:

Person in charge:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Construction unit:

Person in charge:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _