Answer; The final decision has not been made, so everything is still waiting for investigation and evidence collection. ; At the beginning of 20 10, Hao Ping came to our bureau to discuss biomass fuel production and heating projects in the name of Changchun Hongri New Energy Company (hereinafter referred to as New Energy Company). After that, the relevant leaders and departments of our bureau made a special trip to the new energy company for investigation. Accompanied by the chairman, general manager, technical director and Hao Ping of New Energy Company, they have a deep understanding of biomass production and heating, and think that this project is a new energy industry project, which meets the requirements of urban ecological construction and development. Subsequently, the chairman and general manager of the new energy company came to our bureau to inspect the feasibility of the project and expressed their willingness to invest.

In May of 20 10, Hao Ping contacted our bureau alone, and signed an agreement with our bureau on biomass raw material production and heating with an investment of 65438+37 million yuan as a representative of a new energy company. At this time, the Harbin Fair is coming, and our bureau requires to sign a formal investment contract with the boss of the new energy company at the Harbin Fair. However, at the 20 10 Harbin Fair, the boss of the new energy company was not present, and Hao Ping was not a legal person of the new energy company. Without the power of attorney of the legal person, it was impossible to sign a formal contract, so our bureau had to re-sign an intention agreement with Hao Ping. According to the formal contract, the biomass raw material production and heating project with an investment of 65.438+37 million yuan will be invested in three phases, of which the first phase with an investment of 37 million yuan must be completed before the end of September, 2065.438+00 (including the new biomass production line, the completion of heating pipeline laying and the installation of two 65.438+00-ton boilers), so as to realize the new shed reform with a livelihood of 6.5438+00 square meters.

However, Hao Ping only completed the laying of some heating pipes and the installation of a boiler in 20 10, 165438 10, which could not meet the heating requirements at all. Therefore, the Forestry Bureau urgently changed the shed of 654.38+10,000 square meters to Jinlong Thermal Power Company for heating. Although Hao Ping did not achieve heating as required, in order to protect the interests of investors, the Forestry Bureau landed this project in Jinshantun, and arranged a new shed of 200,000 square meters for Hao Ping to be responsible for heating at 20 1 1. In order to urge Hao Ping to fulfill the agreement, in May of 20 1 1, the Forestry Bureau required Hao Ping to sign a formal contract text according to the unified regulations of Yichun City and pay a deposit of 6 million yuan (20% of the total investment). Hao Ping refused to sign the contract on the grounds that he could not provide the legal person's power of attorney and had no funds. In order to fully understand the real situation of the enterprise, the Housing and Construction Bureau, the Technical Supervision Bureau, the Bureau of Industry and Information Technology and other departments systematically inspected the construction of biomass boilers and pipe networks, and found that the heating pipe network built by Hao Ping had serious quality and technical problems and could not meet the heating requirements at all. Although the Forestry Bureau issued many rectification notices, Hao Ping still insisted on rectification, which seriously violated the agreement. During this period, the Forestry Bureau received many petitioners who asked Hao Ping for project funds and wages, and the district court also accepted many cases of suing Hao Ping for arrears in project funds and wages. 2011At the beginning of August, the Economic Investigation Brigade of the Public Security Bureau received a report about Hao Ping's false registered capital.

After investigation, Hao Ping pretended to be a staff member of New Energy Company (New Energy Company has issued a certificate, but Hao Ping is not an employee of New Energy Company), and forged the capital verification bill of tieli city Industrial and Commercial Bank and the capital verification report of Heilongjiang Yuan Bo Certified Public Accountants on June 30, 20 10, and registered Yichun Hongri Biomass Fuel Co., Ltd., with Hao Ping as the legal representative. During this period, Hao Ping and his wife Liu Dandan borrowed 4,654.38+0.7 million yuan from Jiang Haijun, a resident of Qing 'an County (still unpaid), and owed more than 2 million yuan for boilers and equipment and 6,543.8+0 million yuan for construction projects. In order to avoid the debt, Hao Ping and Liu Dandan asked someone to find a relationship. On September 20 10, Yichun hongye biomass fuel co., ltd was re-registered in the same production and processing place. The legal representative was originally Hao Ping, and later changed to Liu Dandan. On the same day, Liu Dandan withdrew its registered capital of 4.4 million yuan. At this point, two companies registered in the same place coexist. After investigation and verification by the Economic Investigation Brigade of the District Public Security Bureau, Hao Ping committed the crime of falsely reporting registered capital. 20 12 April, Jinshantun District People's Court sentenced Hao Ping to one year's imprisonment (suspended for one year) and fined 654.38+10,000 yuan. Liu Dandan committed the crime of registered capital flight and was released on bail pending trial. The public security organs pursued Liu Dandan on the Internet. On February 24th, 20 12, Liu Dandan was arrested with the approval of Harbin Railway Police, and was arrested with the approval of Jinshantun District People's Procuratorate on February 24th, 12, and is now in custody.

According to the investigation, Hao Ping and Liu Dandan don't have the financial strength to invest more than10 million yuan, but Hao Ping and Liu Dandan don't have the financial strength. They must resolutely carry on this project. Their real purpose is to get state subsidies for biomass new energy projects. In the words of ordinary people, their husband and wife are playing the trick of "empty gloves and white wolves", and Red Sun and Red Leaves are well-known "shell companies".

On August 2nd, 20 1 1 when there was only over a month left before the winter heating period (and the last conversation with Hao Ping), Chen Qin, deputy head of the district, and relevant personnel of the district investment promotion bureau made an urgent decision to immediately terminate the cooperation with Hao Ping and make a decision to the secretary of the district party committee and the district head. The leaders of the district party committee and the district government expressed their firm support and instructed the relevant departments to take effective measures to ensure that the people moved back to the shed to live in warm houses. At this time, it happened that You Kaijun, the manager of Shenyang Kaijun Boiler Manufacturing Co., Ltd., went to Jinshantun to ask Hao Ping for boiler money (Hao Ping owed Shenyang Kaijun Boiler Manufacturing Co., Ltd. a boiler with a value of 6.5438+0.58 million yuan and an advance payment of 500,000 yuan). After learning about this situation, You Kaijun said that he wanted to run a heating project in Jinshantun, and he was confident that he could complete the boiler installation and heating pipe network transformation before the heating period. After many discussions, Shenyang Kaijun Boiler Manufacturing Co., Ltd. signed a heating project contract with our bureau and established Jinshan Heating Company. In the case of tight time and heavy tasks, Jinshan Heating Company fought day and night. It took only 1 month to complete the project with an investment of 6 million yuan. The biomass boiler that failed to meet the heating standard was transformed into a coal-fired boiler, and 15-ton boiler and 20-ton boiler were installed successively, which not only ensured that nearly 4,000 households did not catch cold in winter, but also reached the heating capacity of 300 households. To this end, the Forestry Bureau rewarded Jinshan Thermal Power Company.

After the termination of the agreement, Hao Ping and Liu Dandan refused to move out the equipment and articles stored in Hebei Grain Depot and the courtyard of the construction company, which directly affected the work progress of our bureau. During the detention of Hao Ping and Liu Dandan, the Forestry Bureau repeatedly went to the detention center for liquidation. Hao Ping refused to sign the visa on the grounds that he was not a legal person and Liu Dandan did not cooperate. At present, the Jinshantun District People's Court has hired an appraisal company to appraise the investments of Hao Ping and Liu Dandan and handle them according to law.