Traditional Culture Encyclopedia - Tourist attractions - Information on the Establishment of Haibowan Riverside New District in Wuhai City

Information on the Establishment of Haibowan Riverside New District in Wuhai City

Relevant information of Wuhai Binhe New District

The development and construction of Binhe New District is a strategic measure for Wuhai Municipal Party Committee and Municipal Government to adjust urban layout, expand urban space, use Yellow River resources to promote urbanization level in an all-round way and promote coordinated economic and social development in the new development stage in accordance with the overall urban planning and development idea of "population is concentrated in urban areas and industry and agriculture are concentrated in parks". At the same time, our city is adjacent to Ordos City in the east, Alashan League in the west and Bayannaoer City in the north. The Binhe New District under planning, development and construction is to make full use of this unique location advantage and resource advantage to build a "small triangle" consisting of Mengxi, Qipanjing, Wutai and Wuhai City to gather people, logistics, business, capital and information flows. Form population agglomeration, industrial agglomeration, expand the scale of the city, increase the population, improve the taste of the city and improve the level of urbanization.

The development of Binhe New Area is considered as a whole in Phase I, Phase II and Phase III, which are connected with each other.

(Phase I) Planning scope: starting from baotou-lanzhou railway Line in the east, reaching the central line of the Yellow River in the west, starting from Haibei Street overpass in the north, and reaching Nanhecao in the university town in the south, with a total planned area of 9.43 square kilometers. The water surface of the Yellow River and the flooded area is 2.7 square kilometers, and the construction land area is 6.73 square kilometers.

planning orientation: an "ecological oasis" new urban area with rich cultural connotations and regional customs, which is people-oriented, takes water as the soul, and integrates tourism, administrative business office, cultural education, business services and characteristic residence.

Functional zoning: The planning of Binhe New District mainly includes science, technology, culture and education area, administrative and business office area, business service area, tourist and sightseeing area and residential area.

main functional structure and layout: summarized as "two pieces around a core, three veins connected with two axes".

two pieces: the northeast piece and the southwest piece around the green nucleus. The northeast area is dominated by residential functions, while the southwest area is dominated by public facilities, showing an interlocking layout;

one core: the green core in the middle of this area is mainly open public green space, which is not only the green core of this area, but also enjoyed by the residents of the whole city, and improves the microclimate environment in the riverside area. At the same time, the green core is connected with riverside green space and old city green space through green veins.

Three veins: refers to the green veins extending from the riverside green space of the Yellow River to the deep zone of the city, fingering along the green open spaces of Qianlishan Street, Gander Street and Daxue Road, and forming a network-like green base together with the green core and other green axes.

two axes: riverside leisure travel axis and business office axis. Riverside leisure tourism axis takes the characteristics and customs of leisure river as the main line and connects various activities in series; The axis of business office is perpendicular to University Road, which consists of the municipal government building, the corporate headquarters building and the business office buildings in the north, forming a pedestrian leisure street in the business office buildings.

land scale: the total construction land area in the planning area is 6728 hectares.

construction scale: the planned total construction area is about 3.857 million square meters, and the comprehensive plot ratio is .57.

road system structure: plan and improve the road system structure to form a hierarchical network system composed of primary and secondary branches. The road network spacing of the main road system is 8-1,2m, and the red line width of the main road is 3-8m. The width of the red line of the secondary trunk road is 24-3. The red line width of branch roads and neighborhood roads is 16-2m.

Connection mode with the old city: In addition to the main connection channels of the existing south and north overpasses, it is planned to add Gander Street, Qianlishan Street and Shicheng Street to extend westward to connect with the riverside area, and connect with baotou-lanzhou railway by underpass interchange, and with century avenue by plane crossing and elevation crossing (Shifu Street, Erdos Street, Qianlishan Street and Zhuozishan Street adopt plane crossing; The extension of Gander Street and Haida Street adopts vertical intersection).

Development intensity control:

1. Residential buildings are mainly multi-storey and small high-rise, multi-storey houses are 4-6 floors, and high-rise buildings are generally controlled below 12 floors; Symbolic public buildings adopt high-rise buildings, but the height should not exceed 1 meters.

2. The net plot ratio of the second-class residential land in Binhe District is about 1.-1.3, and that of the first-class residential land is about .8-1.; The net plot ratio of administrative office and municipal public service facilities is about 1.8-2.; The net floor area ratio of public service facilities at residential district level is about 1.5-1.8. The sunshine interval of multi-storey and low-rise residential buildings shall not be less than 1: 1.65, so as to ensure that the sunshine hours in severe cold days shall not be less than 2 hours.

building density control: the planned building density of residential plots in the area is generally not higher than 3% for multi-storey buildings, 25% for small and high-rise buildings, and 5% for commercial and office plots.

yellow river water control project: in order to make full use of the resources of the yellow river and reflect its unique landscape, the yellow river water control project was planned in the development and construction of the riverside area. The estimated investment of this project is 1.94 billion yuan, with a storage capacity of 459 million cubic meters, a dam height of 16.7 meters, a dam crest width of 6 meters, and an installed power generation capacity of 6, kilowatts. After completion, a magnificent waterfall landscape will appear in the downstream of the dam, a water surface of more than 1 square kilometers will be formed in the upstream of the dam, and the water level in the upstream of the dam site will rise. The water from the Yellow River naturally flows into the river channel on the south side of the University, where a flood dam was built, and mountain floods also gathered here to form an artificial lake.