Traditional Culture Encyclopedia - Tourist attractions - When will the second phase of Lanzhou Xigu Evergrande Metropolitan Plaza start?
When will the second phase of Lanzhou Xigu Evergrande Metropolitan Plaza start?
June 29th, 2023. Evergrande Metropolitan Plaza is planned to be developed in two phases. The first phase includes three commercial and residential buildings with 32 floors without decoration, three commercial and residential buildings with 42 floors and three basements. The second phase includes two high-rise commercial and residential buildings. It is planned to start construction on June 29, 2023. Evergrande Metropolitan Plaza Project is a commercial complex project built by Evergrande Group in Lanzhou. The project is located in the core business district of Xigu District, Lanzhou City, with a planned total area of 49.4 1 mu and a planned total construction area of 65.438+064,700 square meters.
- Related articles
- Tš¹rkiye¡¯s three pillar industries
- Spring outing diary 500 words
- How to develop and operate red tourism projects?
- What are the top ten tourist attractions for rural tourism in China? Can you check them on Yunyoujiaxiang?
- 10- 15w What kind of car should I buy for traveling?
- Shandong Binzhou tourist attractions
- Suzhou-Hangzhou tourism copywriting
- Explanation copy of special promotional film of gas company
- Where does the travel guide to Xi'an come from? {Tulsian Travel Guide Free Tours
- Introduction to Cangxi Huangmaoya Tourist Attractions Introduction to Cangxi Huangmaoya Tourist Attractions Composition