Traditional Culture Encyclopedia - Travel guide - How about Xinjiang Boyan Water Conservancy and Hydropower Environmental Technology Co., Ltd.?

How about Xinjiang Boyan Water Conservancy and Hydropower Environmental Technology Co., Ltd.?

Introduction: Xinjiang Boyan Water Conservancy and Hydropower Environmental Technology Co., Ltd. was formerly the Environmental Assessment Institute of Xinjiang Water Conservancy and Hydropower Survey and Design Institute of the Ministry of Water Resources. In 1990, it obtained Grade A qualification for environmental impact assessment of construction projects. As of the end of 2014, it was one of the 192 Grade A environmental impact assessment units in the country and the only Grade A environmental impact assessment unit among the provincial water conservancy design institutes. With the approval of the Ministry of Environmental Protection, the Class A environmental impact assessment qualification of the Xinjiang Water Conservancy and Hydropower Survey and Design Institute of the former Ministry of Water Resources was changed to Xinjiang Boyan Water Conservancy and Hydropower Environmental Technology Co., Ltd. to continue the environmental impact assessment business of construction projects. The company is headquartered in Fruit Industry Building, No. 25, Changjiang Road, Urumqi. The main businesses of Xinjiang Boyan Water Conservancy and Hydropower Environmental Technology Co., Ltd. include ● Environmental impact assessment of construction projects ● Planning environmental assessment ● Environmental supervision ● Environmental monitoring ● Environmental protection design ● Environmental protection project general contracting and environmental protection facility operation services ● Environmental impact review and post-evaluation ● Planning and preparation ●Special research on ecological impacts and protection measures ●Technical assessment of completion acceptance of water and soil conservation facilities ●Environmental protection and water and soil conservation consultation during the entire development and construction project process Since obtaining the environmental impact assessment qualification, we have completed the preparation of environmental impact reports and other reports for various construction projects There were 577 achievements (including 157 national-level approval projects). The results involve the development of water and soil resources in arid areas, regional development, water conservancy and hydropower engineering, tourism development, municipal engineering and other industry fields. All the results have successfully passed the review of the national or autonomous region competent authorities at all levels, and have been repeatedly reviewed by the national and autonomous region industry competent authorities. , praise and praise from review experts and construction units. The supporting materials come from scanned copies of certificates and reports.

Legal representative: Zhang Peng

Establishment date: 2014-11-17

Registered capital: RMB 40 million

Enterprise type : Limited liability company (natural person investment or holding)

Company address: 6th Floor, Fruit Industry Building, No. 25, Changjiang Road, Sayibak District, Urumqi, Xinjiang