Traditional Culture Encyclopedia - Weather forecast - Notice of Suzhou Typhoon Tram Operation Adjustment (Suzhou Tram Operation Time)

Notice of Suzhou Typhoon Tram Operation Adjustment (Suzhou Tram Operation Time)

July 27th

Announcement on the resumption of tram operation

According to the news of Suzhou Meteorological Observatory, the intensity of typhoon "fireworks" in Suzhou has gradually weakened, and the Suzhou Meteorological Observatory has updated the orange warning signal of typhoon to a yellow warning signal. Suzhou Tram Line 1 and Line 2 resumed normal operation on July 27th, 20021.In case of sudden bad weather, the departure interval was appropriately extended. Thank you for your understanding and cooperation. 24-hour hotline: 68558 155.

Suzhou High-tech Tram Group Co., Ltd.

2021July 26th

July 26(th)

Affected by the No.6 typhoon "Fireworks" this year, tram lines 1 and 2 stopped operating on July 26th to ensure the safety of tram operation. Passengers are requested to make reasonable travel plans, and the return flight will depend on the weather. For the latest operation, please pay attention to the official account of Suzhou Tram WeChat, on-site broadcasting and other platforms. 24-hour consultation telephone: 68558 155.

Suzhou High-tech Tram Group Co., Ltd.

202125 July

July 25, 08:29

Suzhou Meteorological Observatory has issued an orange warning for typhoon. In view of the possible serious impact of typhoon "Fireworks", in order to ensure the safety of operation, according to the Measures for the Organization and Management of Urban Rail Transit and the Suzhou Rail Transit Regulations of the Ministry of Transport and other relevant regulations, for ground and overhead lines, the train speed should not exceed 60km/h when the wind reaches level 7, 25km/h when the wind reaches level 8, and the operation should be stopped when the wind reaches level 9 or above. The tram 1 Line 2 has started the emergency plan according to the typhoon wind level, and the operation organization has been adjusted in stages according to the impact of typhoon "fireworks". Details are as follows:

At present, the tram 1 and Line 2 have been operated at a speed limit, and the number of vehicles on the line has been reduced; Next, the operation scope of the tram 1 line will be adjusted from Lion Rock Station to West yangshan Station to Lion Rock Station to yangshan South Station. The remaining platforms: High-tech Zone Management Committee Station, Longshan Road Station, Jialingjiang Road Station, Longkang Road Station, Anxiu Station, Embroidery Street North Station, Fan Shi Station and West yangshan Station are out of service; The operation time of 1 line was advanced from 23: 00 to 20: 00. Line 2 is scheduled to be shut down across the board. Passengers are requested to pay attention to the tram operation adjustment information in real time and arrange the trip reasonably. In case of emergency during the tram ride, please follow the instructions of the on-site staff.

The time for stopping sections and stations to resume operation will be determined according to weather conditions. For the latest operation, please pay attention to the official account of Suzhou tram WeChat, station broadcasting and other platforms. Warm reminder, try to minimize going out during the typhoon. 24-hour consultation telephone number: 68558 15 1.