How to write a supervision diary

How to write a supervision diary

How to write a supervision diary? If you want to write a good supervision diary, you must first know what a supervision diary is, what it should include and what its function is, so as to write a good supervision diary. Let's take a look at the relevant knowledge about how to write a supervision diary.

How to write supervision diary 1

1, daily weather record:

What is the minimum and maximum temperature on a cloudy or sunny day?

Rain, snow, fog, hail and their size and initial and lasting influence time; The size of the day's dust and its influence time;

Natural disasters of the day, such as typhoon, flood, tsunami, lightning strike, debris flow, earthquake, etc.

2, personnel on-the-job records:

Number, position and attendance record of supervisors;

On-the-job number of construction personnel: list the number of construction personnel and the on-the-job situation of management personnel in the construction unit according to the division of labor;

Input of construction machinery: type, model, quantity, use time and normal use of mechanical equipment;

Whether the leader of the construction unit or the leader of the construction administrative department has been inspected.

3. Daily progress supervision record:

The name, location, location and number of construction personnel of the subdivisional work started or continued on the same day; The number of subdivisional work completed on that day and its cumulative value and its proportion to the total;

The number of workers, materials and machines invested by the construction unit on the same day, the time and quantity of stagnation and failure;

Ten-day and monthly project progress plans and adjustment plans approved on the same day, and instructions to speed up the progress or suspend construction;

Special events that affect the progress of the project that day, such as water stoppage, power outage, land acquisition and demolition, villagers' interference, shortage of funds, maintenance of machinery and equipment, abnormal climate, etc.

4, daily engineering quality supervision records:

Self-inspection of sub-projects approved for commencement and continuous construction on the same day, as well as supervision station, patrol time and patrol situation;

On the same day, engineering survey lofting review, test detection, supervision engineer's notice or letters related to engineering quality monitoring;

Supervise the process inspection, sub-project inspection and quality evaluation of the construction unit on the same day; Review, acceptance and signing of the intermediate handover certificate on the same day, especially the concealed works;

Quality defects found that day and their handling records, whether to issue a shutdown order or a resumption order, and how to rework, reinforce and repair them;

Report and treatment of engineering quality accidents and engineering safety accidents that occurred that day.

5, daily construction safety supervision ` record:

The implementation of the safety production responsibility system and safety operation procedures of the construction unit on that day;

The arrival and on-site supervision of full-time safety management personnel of the construction unit on that day; Are the sub-projects constructed on that day operated according to the specifications? Whether safety warning signs are set at the entrance of the construction site, the edge of the foundation pit, the aerial work place and the blasting work place; The fire safety operation of the construction unit on that day;

Safety production management of subcontractors on that day;

Handling of safety accidents on that day.

6, daily construction environmental supervision records:

The environmental protection education of the construction unit to the construction personnel on that day;

Whether the new construction site on that day meets the requirements of environmental impact assessment and protection;

Whether the underwater construction of the bridge is in dry season or normal season on that day;

Whether culvert pipe was laid before subgrade was filled in the subgrade construction on that day according to the specifications;

Disposal of dust, waste water, mud, domestic sewage and garbage generated by the construction on that day; The protection of wild animals and plants on that day, whether there is any destruction of grassland vegetation, whether there is deforestation, indiscriminate quarrying of sand, deforestation, and indiscriminate occupation of cultivated land;

Whether to avoid the night on the day of construction with strong noise and vibration, and the noise reduction and shock absorption measures taken for construction machinery with strong noise and vibration;

The use of the borrow site on the same day and the drainage protection and vegetation restoration of the borrow site after the borrow is completed;

On that day, whether the construction unit abandoned or piled up objects that hindered flood discharge in the river, and whether there were other activities that damaged the river;

Dispose of the underground cultural relics found in the construction on that day;

The environmental rationality of the storage site on that day, whether the transport vehicles of raw materials and mixtures are covered with tarpaulins to reduce leakage, etc.

7, daily project cost supervision records:

Engineering measurement after quality acceptance of sub-projects completed on the same day and its review and signing; The quality, quantity, storage and invoice copy records of the permanent engineering materials that entered the site that day; Changes and additional works required to be completed by dayworkers on the same day;

Issue the engineering change order and claim expense approval form on the same day;

Whether there was a contract dispute on that day, the reasons for the dispute and its handling;

On the same day, the project payment certificate and subcontract payment order were issued.

8, daily project contract other matters management records:

Acceptance, review, negotiation and issuance of engineering change orders on that day; Acceptance, review, negotiation and issuance of the approval form for the project delay claim time on that day;

Acceptance, examination, negotiation and issuance of claim expense approval form for the project cost claim on that day; Contract disputes and arbitration that occurred on that day;

Default event of the construction unit on that day;

To examine and approve the labor service agreement, project subcontracting, designated subcontracting and contract transfer events that occurred on the same day;

On the day of engineering insurance, risk events and their investigation, evaluation, negotiation and signing.

9, the daily examination and approval documents, instructions, meetings, acceptance activities and thoughts:

On the same day, the supervision organization approved the documents, issued instructions, held an internal supervision meeting and arranged the work;

The site meeting and supervision meeting held on the same day and the issuance of meeting minutes;

Attend the meeting held by the owner, director's office and other departments on the same day and communicate with them;

On the same day, the leaders and experts of the owner, quality supervision station, design unit and supervision company made on-the-spot visits and paid a return visit;

The experience of dealing with related problems on the same day, the project supervision planning for the next day and the next stage, and the preventive measures and thinking of possible problems.

10, daily supervision diary content should be unified with the site records, building materials entry account and witness sampling records.

How to write supervision diary 2 1 and construction safety log

Construction safety log is one of the main contents of construction site safety data.

Construction safety inspection log is a detailed record of daily events related to construction safety recorded by full-time safety production management personnel from the beginning of the project to the completion of the project, and it is a true portrayal of the safe construction of the project. Construction safety log plays a very important role in the whole project file.

Full-time safety management personnel should conduct daily safety inspections, record hidden dangers of accidents in time, and urge rectification within a time limit. It is an important duty of a safety officer to keep a good construction safety log.

2, the necessity of construction safety log to fill in

(1) The construction safety log is a kind of record, which mainly records the illegal operation, illegal command, safety problems and hidden dangers in the construction site, as well as the handling records of problems found.

(2) The construction safety log is a kind of evidence. It is the proof of whether the equipment and facilities have been accepted at the site and whether the security personnel have checked the potential safety hazards at the site.

(3) The construction safety log is the notebook of the project and the most detailed first-hand information reflecting the construction safety production process. It can accurately, truly and subtly reflect the construction safety situation.

(4) The construction safety log can play the role of file interface, and can be used to trace back some matters not reflected in other documents.

(5) As the construction data kept by the construction enterprise, the construction safety log records the information that cannot be revealed in other engineering documents for various reasons, which may be the basis for judging the truth in the future.